Construction of a system for the use of drainage water for


manufacturing and economic purposes of the city of Odesa

Odesa - 2022
Department of
Economic Development of
Odesa City Council
PROBLEMATIC

The stable growth of annual drainage water debit in the existing


system of drainage water treatment.

Current system of drainage water treatment does not allow to


use the accumulated water volume for municipality needs
(irrigational and technological needs).

Odesa - 2022
Department of
Economic Development of
Odesa City Council
GENERAL PROJECT DATA
Service life – 50 years
Productivity of the system, m³ / day – 18 072
Annual productivity of the system, m3 – 3 106 625
Annual electricity consumption, MW – 4883.3
Total estimated cost of construction – USD 12.43 mio of which:
● Construction and installation works – USD 3.40 mio
● Cost of equipment – USD 6.50 mio
● Other expenses – USD 2.53 mio
Duration of construction, months – 28
Number of water treatment facilities, pcs – 6
Number of drainage pumping stations, pcs – 7
Diameters of pipelines, mm – 100, 150, 200, 250,300, 350,400
Projected length of pipelines, km – 18.13
Odesa - 2022
Department of WHAT IS EXPECTED TO BE DONE
Economic Development of
Odesa City Council
DURING PROJECT EXECUTION
It is projected to construct 6 water treatment plants and 7 drainage pumping stations.
The measures developed for the construction of the drainage water use system envisage a
reduction in the volume of drainage wastewater discharged into the waters of the Odesa
Bay.
Construction and technological solutions of the feasibility study include the following
composition of structures and networks:
• drainage pumping stations;
• drainage water treatment plants;
• pipelines for the supply of untreated water;
• pipelines for the supply of purified water;
• pipelines for concentrate discharge.
Selection of drainage water is provided from the portals of the gutters by drainage pumping
stations, which supply it through pipelines to drainage water treatment plants. In the
sections of pipelines from pumping stations to installations, there are columns for
dismantling untreated drainage water for the purpose of washing hard surfaces, as well as
fire hydrants.

Odesa - 2022
Department of
Economic Development of
SUGGESTED WATER
Odesa City Council
TREATMENT TECHNOLOGY
Input sourced water: high mineralization – 3700 mg/l and hardness of 33 mg-eq/l.
Acceptable and economically feasible method is membrane technology as the following:
• removal of suspended particles on disk or mesh filters with a maximum particle size of
200-300 μm;
• purification of water from organic impurities, color and turbidity and simultaneous
reagent-free disinfection on ultrafiltration membranes;
• separation and supply of part of the pre-filtered water flow for desalination at reverse
osmosis units;
• supply of the rest of the purified by ultrafiltration water flow through the auxiliary line
(bypass) - in the mixer for mixing with desalinated water after leaving the reverse osmosis
machine in order to adjust the normalized water quality indicators;
• supply to the mixer of the necessary corrective additives (disinfectant with chlorine
content), in the amount that guarantees the sanitary and epidemiological protection of the
reservoir-storage of conditioned water and water supply networks on the way to
consumers.
• concentrate formed as a result of water purification is subject to utilization.

Odesa - 2022
Department of
Economic Development of
VISUALIZATION OF THE
Odesa City Council
PROJECT EXECUTION