Professional Documents
Culture Documents
V1.1
7/29/2013
29.00
Set 1
27.00
25.00
% LTE Records
23.00
19.00
17.00
Set 2
15.00
Set 1
59.00
25.00
57.00
20.00
55.00
% LTE Records
% 2G Records
53.00 15.00
51.00
10.00
49.00
Set 2 5.00
47.00
MME Upgrade
45.00 0.00
% LTE Records of total 2G+3G+LTE records % 2G Records of total 2G+3G (non-LTE) records
Set 1
300,000
2,000,000
Set 2
250,000
Records (c) - LTE/UMTS
1,500,000
200,000
100,000
500,000
0 0
LTE OVERLAY COUNT RECORDS 2G LTE OVERLAY COUNT RECORDS 3G LTE OVERLAY COUNT RECORDS LTE
Set 1 reduced the count of GSM records (Already reduced after MME Upgrade)
Set 2 Reduced the transitions between UMTS and LTE
6 Proprietary and Confidential
TAU Count
TAU Attempts
1,800,000
1,600,000
1,400,000
Set 2
1,200,000
1,000,000 Set 1
800,000
600,000
400,000
EPS_IS_TAU_GN_ATT EPS_CMB_INTER_TAU_ATT
TAU Attempts improved Set 2 changes (Expected improvement on HLR) – Other changes following MME
upgrade due to individual site changes [> 50% reduction from pre MME Upgrade Levels)
7 Change in counter at MME upgrade Proprietary and Confidential
Accessibility
ERAB Access Failure Rate / Count
0.40 30,000.00
Set 1
0.35
25,000.00
0.30 Set 2
20,000.00
0.25
0.20 15,000.00
0.15
10,000.00
0.10
5,000.00
0.05 MME Upgrade
0.00 0.00
06.29.2013
06.30.2013
07.01.2013
07.02.2013
07.03.2013
07.04.2013
07.05.2013
07.06.2013
07.07.2013
07.08.2013
07.09.2013
07.10.2013
07.11.2013
07.12.2013
07.13.2013
07.14.2013
07.15.2013
07.16.2013
07.17.2013
07.18.2013
07.19.2013
07.20.2013
07.21.2013
07.22.2013
07.23.2013
07.24.2013
07.25.2013
07.26.2013
07.27.2013
07.28.2013
Initial Access Failures (RRC + ERAB + S1) (c) ERAB Initial Access Failure Rate (%)
4,500
0.07
Set 1
4,000
0.06
3,500
0.05
3,000
0.04 2,500
2,000
0.03
1,500
0.02
Set 2 1,000
0.00 0
06.29.2013
06.30.2013
07.01.2013
07.02.2013
07.03.2013
07.04.2013
07.05.2013
07.06.2013
07.07.2013
07.08.2013
07.09.2013
07.10.2013
07.11.2013
07.12.2013
07.13.2013
07.14.2013
07.15.2013
07.16.2013
07.17.2013
07.18.2013
07.19.2013
07.20.2013
07.21.2013
07.22.2013
07.23.2013
07.24.2013
07.25.2013
07.26.2013
07.27.2013
07.28.2013
ERAB Drops inc MME Releases ERAB Drop Rate inc MME Releases (%)
ERAB DCR returned to Pre-MME upgrade levels (Due to the reduced number of sessions in poorer
coverage moving to WCDMA)
9 Proprietary and Confidential
10
10,000.00
20,000.00
30,000.00
40,000.00
50,000.00
60,000.00
70,000.00
0.00
06.29.2013
06.30.2013
07.01.2013
07.02.2013
07.03.2013
07.04.2013
Retainability (2)
07.05.2013
07.06.2013
07.07.2013
07.08.2013
07.09.2013
07.10.2013
07.11.2013
07.19.2013
MME Upgrade
07.20.2013
07.21.2013
07.22.2013
07.23.2013
Set 1
07.24.2013
07.25.2013
07.26.2013
Set 2
07.27.2013
07.28.2013
11
DL Cell Throughput (kbps)
10,000.00
10,200.00
10,400.00
10,600.00
10,800.00
11,000.00
11,200.00
11,400.00
9,800.00
06.29.2013
06.30.2013
Throughput
07.01.2013
07.02.2013
07.03.2013
07.04.2013
07.05.2013
07.06.2013
07.07.2013
07.08.2013
07.09.2013
07.18.2013
MME Upgrade
07.19.2013
07.20.2013
07.21.2013
07.22.2013
07.23.2013
Set 1
07.24.2013
UL Average Cell Throughput (kbps)
07.25.2013
07.26.2013
Set 2
07.27.2013
07.28.2013
0.00
200.00
400.00
600.00
800.00
1,000.00
1,200.00
1,400.00
18.00
Set 1 1,200,000
16.00
Session Continuity to WCDMA (%)
1,000,000
12.00
800,000
10.00
Set 2
600,000
8.00
6.00 400,000
4.00
0.00 0
06.29.2013
06.30.2013
07.01.2013
07.02.2013
07.03.2013
07.04.2013
07.05.2013
07.06.2013
07.07.2013
07.08.2013
07.09.2013
07.10.2013
07.11.2013
07.12.2013
07.13.2013
07.14.2013
07.15.2013
07.16.2013
07.17.2013
07.18.2013
07.19.2013
07.20.2013
07.21.2013
07.22.2013
07.23.2013
07.24.2013
07.25.2013
07.26.2013
07.27.2013
07.28.2013
# of Session Continuity RRc Release to WCDMA Session Continuity to WCDMA Rate (%)
1,800,000.00 160,000.00
1,600,000.00
140,000.00
1,400,000.00
120,000.00
1,200,000.00 Set 1
100,000.00
1,000,000.00
80,000.00
800,000.00
60,000.00
600,000.00
Set 2 40,000.00
400,000.00
MME Upgrade
200,000.00 20,000.00
0.00 0.00
06.29.2013
06.30.2013
07.01.2013
07.02.2013
07.03.2013
07.04.2013
07.05.2013
07.06.2013
07.07.2013
07.08.2013
07.09.2013
07.10.2013
07.11.2013
07.12.2013
07.13.2013
07.14.2013
07.15.2013
07.16.2013
07.17.2013
07.18.2013
07.19.2013
07.20.2013
07.21.2013
07.22.2013
07.23.2013
07.24.2013
07.25.2013
07.26.2013
07.27.2013
07.28.2013
UE DRB DL Volume (MB) UE DRB UL Volume (MB)