Summary

-One through water tube boiler


-Fuel: only coal combustion
-MCR 2,120t/h
-The leakage of steam was found during operator’s patrolling.
-One stub of 4th stage super heater outlet header was ruptured
-As the result of extensive inspection, further one nozzle were
found to be ruptured
4th S.H. inlet 4th S.H. outlet
tube header Rapture
tube header

Non-heating zone

4th S.H. tubes


Heating zone

4th S.H. outlet tubes


header cross-section

3
Cause of failure

-When the header was fabricated in the factory, some tubes were
heated to rectify the pitch of nozzles.
-The heating temperature was over phase transformation point, so
locally metal structure changed and creep strength was down. So
creep rupture occurred at short time which was expected.
Countermeasure to recurrence

-Failed tube and other distorted tubes found by extensive


inspection (Total 29 tubes) were replaced to new ones.
-Soundness of the tubes were confirmed every turnaround

You might also like