Sizes of drawing sheets :


For convenience both in the drawing office and on the site, the
preferred sizes of drawing sheets are as shown below (ISO
Standards):

Trimmed Sizes (in mm) Untrimmed Sizes (in mm)


• A0 - 1189 x 841 A0 - 1230 x 880
• A1 - 841 x 594 A1 - 880 x 625
• A2 - 594 x 420 A2 - 625 x 450
• A3 - 420 x 297 A3 - 450 x 330
• A4 - 297 x 210 A4 - 330 x 240
• A5 - 210 x 148 A5 - 240 x 165

2
www.ramtech-corp.com
An ISO 9001:2000
Certified Organization

AN OVERVIEW
ON
DOMESTIC WATER
SUPPLY

3
www.ramtech-corp.com
DEFINITION OF WATER
SUPPLY
An ISO 9001:2000
Certified Organization
Water supply system means the water service
pipe, the water distributing pipes, and the and
the necessary connecting pipes, fittings, control
valves and all appurtenances within the building
or it may be outside the building, within the
property boundary.

Water service pipe :-

"Water service pipe" means the pipe from the


water main or other source of water supply to the
water distributing system of the building served.

4
www.ramtech-corp.com
USAGE OF WATER
An ISO 9001:2000
Certified Organization

DOMESTIC :-
The average daily domestic requirement of water like
bathing, cooling, washing and toilet flushing for different
type of building.

AIR CONDITIONING AND VENTILATION


SYSTEM :-
Large quantities of water are required for building
equipped with evaporative cooled air conditioning/
refrigeration. In both cases the heat absorbed in the
cooling equipment is exchanged with atmospheric air by
spraying water on cooling tower.

SPECIAL REQUIREMENTS :-
Water is required in buildings having laboratories,
laundries, kitchens or other processes requiring water.

5
www.ramtech-corp.com
USAGE OF WATER

An ISO 9001:2000
Certified Organization

SWIMMING POOLS :-
Large quantity water is required for ornamental pools,
fountains, cascades for human comfort.

FIRE FIGHTING :-
A small percentage of the gross storage of water is lost
for fire fighting system provided in building for human
safety.

GARDENING :-
Building with gardens, internal landscape areas, plotted
plants, and open courtyards require water for
horticultural operations.

6
www.ramtech-corp.com
SOURCES OF WATER SUPPLY
An ISO 9001:2000
Certified Organization
• CITY SUPPLY.

• WELLS
1. TUBEWELLS
2. BOREWELLS
3. DUGWELLS

• OPENSTREAMS/REVERS/SPRINGS

• RAIN WATER HARVESTING

• RECYCLED WATER
7
www.ramtech-corp.com
WATER STORAGE
An ISO 9001:2000
Certified Organization
UNDERGROUND STORAGE
SHED

DELIVERY

MAINHOLE
SUCTION

OVERFLOW
PUMP

UNDERGROUND WATER TANK


8
www.ramtech-corp.com
WATER STORAGE
An ISO 9001:2000
Certified Organization
OVERHEAD STORAGE
WATER SUPPLY PIPE OVERFLOW

OVERHEAD TANK
WATER DISTRIBUTION
PIPE

OVERHEAD TANK
9
www.ramtech-corp.com
HOT WATER SYSTEM
An ISO 9001:2000
Certified Organization

INTRODUCTION :
Hot water is needed for bathing and washing in domestic
use. Higher temperature melt the sticky oil and grease
from the human body, pot and pans, making the clean-up
easy. Bathing with hot water opens the body pores,
washing dirt and sweat easily and giving a sense of
freshness. In other region at cold places hot water is
necessary for daily life.

HOT WATER REQUIREMENT :


Hot water is used in kitchens and bathrooms in residential
areas. It is also required for laundries and industrial
kitchens and in building like hotels, hospitals, schools,
hostels, industrial canteens etc.

10
www.ramtech-corp.com
HOT WATER STORAGE
An ISO 9001:2000
Certified Organization

11
www.ramtech-corp.com
TYPES OF ELECTRICAL
WATER HEATER
An ISO 9001:2000
Certified Organization FLOOR MOUNTED ELECTRICAL WATER HEATER

FLOOR MOUNTED ELECTRIC WATER HEATER

12
www.ramtech-corp.com
TYPES OF ELECTRICAL
WATER HEATER
An ISO 9001:2000
Certified Organization
WALL MOUNTED ELECTRICAL WATER HEATER

13
www.ramtech-corp.com
TYPES OF ELECTRICAL
WATER HEATER
An ISO 9001:2000
Certified Organization

14
www.ramtech-corp.com
TYPES OF ELECTRICAL
WATER HEATER
An ISO 9001:2000
Certified Organization

15
www.ramtech-corp.com
TYPES OF ELECTRICAL
WATER HEATER
An ISO 9001:2000
Certified Organization

16
www.ramtech-corp.com
ABBREVEATIONS & SYMBOLS
An ISO 9001:2000
Certified Organization  CWS – COLD WATER SUPPLY

 HWS – HOT WATER SUPPLY

 IV – ISOLATING VALVE

 SV – SOLENOID VALVE

 AMR – AUTOMETIC WATER METER


17
www.ramtech-corp.com
ABBREVEATIONS & SYMBOLS

An ISO 9001:2000  EWH – ELECTRICAL WATER


Certified Organization HEATER

 HB – HOSS BIB

 COP – CAP ON END OF PIPE

 WHA – WATER HAMMER


ARRESTER

 STR – STRAINER

18
www.ramtech-corp.com
ABBREVEATION & SYMBOLS

An ISO 9001:2000
Certified Organization
 AN – PIPE ANCHOR

 PG – PIPE GUIDE

 EJ – EXPANSION JOINT

 FC – FLEXIBLE CONNECTOR

 AAV – AUTOMATIC AIR VENT


19
www.ramtech-corp.com
ABBREVEATION & SYMBOLS

An ISO 9001:2000  BRANCH SIDE CONNECTION


Certified Organization

 BRANCH BOTTOM CONNECTION

 BRANCH TOP CONNECTION

 RISER OR DROP

 RISER DOWN RISER UP

20
www.ramtech-corp.com
ABBREVEATIONS

An ISO 9001:2000
Certified Organization

21
www.ramtech-corp.com
ABBREVEATION, PURPOSE &
STANDARD PIPE CONNECTION
An ISO 9001:2000
Certified Organization

• WC :- WATER CLOSET
The purpose of a WC is to carry out the soil waste to the
stack. It is made up of ceramic material with an in-built trap
with water seal which prevents the foul smell entering into the
toilet. WC shall be provided with flush valve/cistern, seat and
cover, connector. Only cold water is provided to WC with
diameter 20mm to flush tank and 16mm for ablution hose and
the standard height of WC is 370mm from the finish floor level.

22
www.ramtech-corp.com
FLUSH TANK DETAILS

An ISO 9001:2000
Certified Organization

23
www.ramtech-corp.com
TYPES OF FLUSH TANK &
STANDARD DIMENSION
An ISO 9001:2000
Certified Organization

24
www.ramtech-corp.com
ABBREVEATION, PURPOSE &
STANDARD PIPE CONNECTION
An ISO 9001:2000
Certified Organization
• WB :- WASH BASIN(LAVATORY)
It is called as “Wash basin”. The purpose of a WHB is to
carry out the waste water to the stack. It is also made up of
ceramic material. WB shall be provided drain with a trap, over
flow passage, with or with out pop up waste coupling and hot
and cold mixer. As per the standard both cold & and hot water
pipe sizes are 16mm supply. The bottom of pipe of WB is
600mm from finished floor level.

25
www.ramtech-corp.com
ABBREVEATION, PURPOSE &
STANDARD PIPE CONNECTION
An ISO 9001:2000
Certified Organization

• UR :- URINAL
The purpose of urinal is for urination, which is associated with
men. It is provided with waste coupling with dome type grating,
trap with extension pipe, push on/off lever. It is made up of
ceramic material and only cold water supply is provided to the
UR. The standard pipe connection to the UR is 20mm & the
bottom of pipe to the UR is 1050mm from finished floor level.

26
www.ramtech-corp.com
TYPES OF URINAL & WATER SUPPLY
DISTRIBUSION
An ISO 9001:2000
Certified Organization

27
www.ramtech-corp.com
TYPES OF URINAL & WATER SUPPLY
DISTRIBUSION
An ISO 9001:2000
Certified Organization

28
www.ramtech-corp.com
ABBREVEATION, PURPOSE &
STANDARD PIPE CONNECTION
An ISO 9001:2000
Certified Organization

• BT :- BATH TUB
The purpose of BT is to carry out the bath water to the stack.
BT shall be provided with an in built over flow, drain with a trap,
hot and cold mixer, overhead shower and hand shower.
Diameter 16mm cold water and hot water supply to the mixture
and the bottom of pipe connected to the bath tub is elevated
550mm from finished floor level.

29
www.ramtech-corp.com
SOME TYPES OF BATH TUB WITH
ITS STANDARD DIMENSION
An ISO 9001:2000
Certified Organization

30
www.ramtech-corp.com
SOME TYPES OF BATH TUB WITH
ITS STANDARD DIMENSION
An ISO 9001:2000
Certified Organization

31
www.ramtech-corp.com
ABBREVEATION, PURPOSE &
STANDARD PIPE CONNECTION
An ISO 9001:2000
Certified Organization

• BDT :- BIDET
The purpose of bidet is for the external cleaning of body
associated with women. A bidet shall be provided with a
water spray, designed for external cleaning that directs the
jet of water upward to the body. Both hot water and cold
water pipes are connected to bidet. 16mm diameter pipes
are connected to bidet having bottom of level 400mm from
finished floor level.

32
www.ramtech-corp.com
BIDET WITH WATER CONNECTION

An ISO 9001:2000
Certified Organization

33
www.ramtech-corp.com
ABBREVEATION, PURPOSE &
STANDARD PIPE CONNECTION
An ISO 9001:2000
Certified Organization

• SH :- SHOWER
The purpose of the Shower is to carry out the bath water to
the stack. Shower shall be provided with overhead shower,
jets, hot and cold mixer, drain with trap, glass or synthetic
enclosure to prevent water spillage to the dry area of the
room. The standard sizes of hot water and cold water is
16mm & 16mm respectfully. Bottom of pipe connected to
shower is 1000mm from finished floor level.

34
www.ramtech-corp.com
ABBREVEATION, PURPOSE &
STANDARD PIPE CONNECTION
An ISO 9001:2000
Certified Organization

• KS :- KITCHEN SINK
The purpose of kitchen sink is to carry out the domestic food
waste generated to stack. Sink shall be provided with hot and
cold mixer, drain with trap and overflow passage. The pipes size
provided to kitchen sink is 16mm respectfully & the bottom of
pipes are 600mm from finished floor level.

35
www.ramtech-corp.com
FLOW CHART FOR PREPARATION OF
SHOP DRAWING OF WATER SUPPLY
WATER TENDER DRAWING
An ISO 9001:2000 (CONSULTANT
Certified Organization DOCUMENT)

REMOVE UNWANTED
ARCHITECTURAL DATA
AND PREPARE IT

INSERT ARCHITECHTURAL
DRAWING APPROVED BY
CONSULTANT

PREPARE THE
FIXTURES(WC, WB, BT,KS SHOP DRAWING
ETC),
BY FOLLOWING
EWH, WHA AND OTHER
SCHEDULE APPROVED BY
THE STANDARDS
CONSULTANT GIVEN BY
CONSULATANT

CHECK THE DRAWING


AS PER CHECK LIST &
TAKE CHECK PRINT

AFTER CHECKING
EDIT THE MISTAKES
ON THE DRAWING

OUT PUT
DRAWING
36
www.ramtech-corp.com
STEPS FOLLOWED BY DRAUGHTS
MAN
TO PREPARE A SHOP DRAWING
An ISO 9001:2000 1.Client is provided the architectural drawing for all
Certified Organization
floors or areas. It contains all information like room
patrons, plumbing fixtures, walls, columns, beams etc., So
create one arch. drawing for reference purpose.
• Delete unwanted text and dimensions
• Change text height as per shop drawing scale
• Change grid bubbles as per shop drawing scale
• Change all entities into AutoCAD colour 8
For example see below snap shots Input and Out put
drawings.

INPUT ARCHITECTURAL FILE OUTPUT ARCHITECTURAL FILE


37
www.ramtech-corp.com
STEPS FOLLOWED BY DRAUGHTS
MAN
TO PREPARE A SHOP DRAWING
An ISO 9001:2000
Certified Organization 2. AS PER CONSULTANT REQUREMENT, FOLLOWS THE CAD
STANDARD MEANS (LINE WEIGHT, LINE TYPE, LINE COLOUR,
TEXT HEIGHT ETC.)

3. PIPE LINE MORE THAN DIA 65 MM IS CONSIDERED AS A


DOUBLE LINE DRAFTING & LESS THAN DIA 65 MM AS A
SINGLE LINE DRAFTING. SEE THE BELOW DWG.
NOTE:-

38
www.ramtech-corp.com OUTPUT SHOP DRAWING
STEPS FOLLOWED BY DRAUGHTS
MAN
TO PREPARE A SHOP DRAWING
An ISO 9001:2000
4. SUITABLE WATER FITTING BLOCKS SHOULD BE
Certified Organization
PLACED IN DOUBLE LINE PIPE WORK.
(SOME STANDARD WATER FITTINGS BLOCKS ARE AS SHOWN BELOW.)

39
www.ramtech-corp.com
STEPS FOLLOWED BY DRAUGHTS
MAN
TO PREPARE A SHOP DRAWING
An ISO 9001:2000
WATER FITTING BLOCKS & BLOCKS USE AT SHOP DRAWING.
Certified Organization

STANDARD BLOCKS OUTPUT SHOP DRAWING

40
www.ramtech-corp.com
STEPS FOLLOWED BY DRAUGHTS
MAN
TO PREPARE A SHOP DRAWING
An ISO 9001:2000
5. LINE DIAGRAM TEE & ELBOW MUST BE PLACED AT EVERY
Certified Organization
SINGLE LINE PIPE JUNCTION AND WHEREVER PIPE BENDS,
FILLET ACCORDING TO STANDARD RADIUS.

OUTPUT SHOP DRAWING


41
www.ramtech-corp.com
STEPS FOLLOWED BY DRAUGHTS
MAN
TO PREPARE A SHOP DRAWING
An ISO 9001:2000 6. ALWAYS CONSIDERED ON DRAWING THAT HOT WATER MUST BE PLACED
Certified Organization AT LEFT AND COLD WATER AT THE RIGHT POSITION OF THE USER FACING
TOWARDS THE FIXTURES.

OUTPUT SHOP DRAWING

OUTPUT SHOP DRAWING

42
www.ramtech-corp.com
STEPS FOLLOWED BY DRAUGHTS
MAN
TO PREPARE A SHOP DRAWING
An ISO 9001:2000 7. GIVE PIPE SIZE & BOTTOM OF PIPE (BOP) ANNOTATION TO
Certified Organization EVERY PIPES.

INPUT DRAWING OUTPUT SHOP DRAWING

43
www.ramtech-corp.com
STEPS FOLLOWED BY DRAUGHTS
MAN
TO PREPARE A SHOP DRAWING
An ISO 9001:2000
Certified Organization 8. MENTIONED THE FLOW DIRECTION (ARROW) OF WATER
THROUGH PIPE TO ALL THE PIPE LINE THAT IS HOT WATER AND
COLD WATER PIPES.
•MEANS FOR COLD WATER ITS FROM RISER TO THE TILL END OF
EVERY CONNECTIONS.
•FOR HOT WATER IT MAY BE FROM ELECTRICAL WATER HEATER
OR FROM RISER TO THE TILL END OF EVERY CONNECTIONS.

INPUT DRAWING OUTPUT SHOP DRAWING

44
www.ramtech-corp.com
STEPS FOLLOWED BY DRAUGHTS
MAN
TO PREPARE A SHOP DRAWING
An ISO 9001:2000
Certified Organization 9. ALL HIGH LEVEL PIPES ARE DROPPED IN WALL TO LOW LEVEL.

INPUT DRAWING OUTPUT DRAWING

45
www.ramtech-corp.com
STEPS FOLLOWED BY DRAUGHTS
MAN
TO PREPARE A SHOP DRAWING
An ISO 9001:2000
Certified Organization 10. ANGLE VALVE MUST BE PLACED AT WALL WHEN WATER
PIPES SUPPLIES FOR FIXTURE AT LOW LEVEL.

INPUT DRAWING OUTPUT DRAWING

46
www.ramtech-corp.com
STEPS FOLLOWED BY DRAUGHTS
MAN
TO PREPARE A SHOP DRAWING
An ISO 9001:2000
Certified Organization 11. SUPPORTS AND HANGERS ARE PLACE AS PER
CONSULTANT RECOMMENDATION.

PLAN

ELEVATION

HANGERS PLACE SECTIONAL ELEVATION


ON HIGH LEVEL PIPE OF HANGER

47
www.ramtech-corp.com
PIPE FIXING CLIP

An ISO 9001:2000
Certified Organization

48
www.ramtech-corp.com
STEPS FOLLOWED BY DRAUGHTS
MAN
TO PREPARE A SHOP DRAWING
An ISO 9001:2000
Certified Organization 12. DIMENSIONED(AS PER STANDARD) BOTH DOUBLE
LINE AND SINGLE LINE PIPE WORK FROM THE NEAREST
WALL OR FROM GRID LINE.

INPUT DRAWING OUTPUT DRAWING

49
www.ramtech-corp.com
STEPS FOLLOWED BY DRAUGHTS
MAN
TO PREPARE A SHOP DRAWING
An ISO 9001:2000
Certified Organization 13. PREPARE THE SECTION DRAWING AT TYPICAL
TOILET AREAS AND COMPLICATED PIPE LINE AREAS.

SECTIONAL ELEVATION OF TOILET


50
www.ramtech-corp.com
STEPS FOLLOWED BY DRAUGHTS
MAN
TO PREPARE A SHOP DRAWING
An ISO 9001:2000
14. PREPARE THE ISOMETRIC LINE DIAGRAM OF EVERY
Certified Organization
INDIVIDUAL APPARTMENT.

REFERENCE OUTPUT SHOP DRAWING


51
www.ramtech-corp.com
STEPS FOLLOWED BY DRAUGHTS
MAN
TO PREPARE A SHOP DRAWING
An ISO 9001:2000
14. PREPARE THE ISOMETRIC LINE DIAGRAM OF
Certified Organization
EVERY INDIVIDUAL APPARTMENT.

PREPARED ISOMETRIC VIEW


52
www.ramtech-corp.com
STEPS FOLLOWED BY DRAUGHTS
MAN
TO PREPARE A SHOP DRAWING
An ISO 9001:2000
Certified Organization 15. ATTACH THE ABOVE FLOOR STRUCTURAL XREF FILE OF
THAT PARTICULAR FLOOR AND CHECK WHETHER THE PIPE
LINES HITTING TO THE BEAM, CONSIDERING THE BEAM
SCHEDULE FILE GIVEN BY CONSULTANT.
SHOP DRAWING

53
www.ramtech-corp.com
STEPS FOLLOWED BY DRAUGHTS
MAN
TO PREPARE A SHOP DRAWING
An ISO 9001:2000 ABOVE FLOOR STRUCTURAL FILE
Certified Organization

54
www.ramtech-corp.com
STEPS FOLLOWED BY DRAUGHTS
MAN
TO PREPARE A SHOP DRAWING
An ISO 9001:2000 AFTER ATTACHED STRUCTER FILE
Certified Organization

55
www.ramtech-corp.com
STEPS FOLLOWED BY DRAUGHTS
MAN
TO PREPARE A SHOP DRAWING
An ISO 9001:2000 BEAMS SCHEDULE FILE
Certified Organization

56
www.ramtech-corp.com
STEPS FOLLOWED BY DRAUGHTS
MAN
TO PREPARE A SHOP DRAWING
An ISO 9001:2000
Certified Organization
16. CO-ORDINATE WITH OTHER SERVICES WHETHER THE
PIPES STRIKE TO OTHER SERVICES.

DFCU
7.TH

OUTPUT CSD DRAWING 57


www.ramtech-corp.com
STEPS FOLLOWED BY DRAUGHTS
MAN
TO PREPARE A SHOP DRAWING
An ISO 9001:2000
Certified Organization

17. IF ANY FIND, CONSIDERING THE ABOVE TWO POINT


THAN, POSIBLE REMAIDEIS MUST BE TAKEN BY THE
OPPERATOR.

•EITHER POSSIBLE DISPLACEMENT OF PIPE.

•CHANGING THE BOTTOM OF PIPE HITTING TO THE OTHER


SERVICES.

•18. IN CASE OF DOUBT OR DISCREPENCY RAISE QUERY.

19. CHECK PRESENTATION OF VIEWPORTS.

58
www.ramtech-corp.com
STEPS FOLLOWED BY DRAUGHTS
MAN
TO PREPARE A SHOP DRAWING
An ISO 9001:2000
Certified Organization

VIEWPORTS SETTING
59
www.ramtech-corp.com
STEPS FOLLOWED BY DRAUGHTS
MAN
TO PREPARE A SHOP DRAWING
An ISO 9001:2000
Certified Organization

20. UPDATE THE TITLE BLOCK AND LOGO AS PER APPROVED


CONSULTANT.

• UPDATE THE NOTES AS FOR CONSULTANT REQUIRMENTS.


• PLACE EVERY LEGENDS AND ABBREVIATIONS USED ON
THAT PERTICULAR DRAWINGS ON TITLE BLOCK.
• MENTION ALL REFERENCE DRAWINGS NUMBER AND NAMES
IN TITLE BLOCK.
• PREPARE A SMALL KEY PLAN OF ARCITECTURAL DRAWING
AND HILIGHT THE AREA SHOWN ON VIEW PORT OF THE SHEET.
• PLACE IF ANY CLIENT, PROJECT, CONSULTANT, PROJECT
MANAGEMENT, CONTRACTOR, SUB CONTRACTORS LOGO ON
TITLIE BLOCK.
• AT LAST UPDATE THE TITLE BLOCK MENTION DRAWING
TITLE, DATE, CHECKED BY, DRAWN BY,SCALE ACCORDING TO
CONSULTANT REQUIREMENT ETC.

21. FILL THE CHECKLIST AND TAKE CHECK PRINT.

60
www.ramtech-corp.com
MEP CHECKLIST
(ANNESURE-11c)
MEP (Plumbing) -Checklist (Annexure-11c)
An ISO 9001:2000 Project:
Title:
Certified Organization Drawing Number:
Revision:
1. Check level 2. Check level 3. Check level

A Compliance to the Specifications


1 Actual version of the Domestic water and Drainage drawing
2 Specific requirements, rules regarding the detailing
B Title Block
1 Title / Dwg. No. / Rev. Index. / Scale
2 Complete revision block incl. corresponding dates, indications etc.
3 Keyplan with indication of the relevant part
4 General notes
5 Drawn by, checked by, appr. by, corresponding dates

C Depiction (Representation)
1 Text Heights
2 Headings and scales written
3 standard Layers and Linetypes
4 Checked section names
5 General presentation and orientation correct
D Detailing
1 Assigned the BOP
2 Setting out Dimensions
3 Representation of pipe fittings
4 Prepared sections at Critical areas
5 Add standard Details
6 Checked Pipe foulings with other services
7 Checked Pipe foulings with structure
8 Pipe sizes are shown as per schematic drawing
9 Prepared Isometric views for Domestic water
10 Add valves if necessary
11 Riser Sizes are shown
12 check representaion of view ports

Comments………………………………………………………………………………………………………

…………………………………………………………………………………………………………………..

…………………………………………………………………………………………………………………..

Checked in the 1. Level - Name: Sign: Date:

Checked in the 2. Level - Name: Sign: Date:


61
www.ramtech-corp.com Checked in the 3. Level - Name: Sign: Date:
An ISO 9001:2000
Certified Organization

PREPARING A
SECTIONAL
VIEW

62
www.ramtech-corp.com
HOW THE SECTIONAL VIEW
OBSERVED ?

An ISO 9001:2000
Certified Organization

• PREPARE THE PLAN (SHOP DRAWING) AS PER ABOVE


MENTION POINTS.

• DRAW THE CUTTING PLANE LINE ON TYPICAL TOILET


AREA OR LOCATING COMPLICATED PIPE AREA.

• THE DRAUGHFTS MAN SHOULD THOUGHT THAT HE


STANDING FACING TOWARDS THE ARROW MARK OF
CUTTING PLANE LINE.

• BEHIND THE CUTTING PLANE LINE NEED NOT TO BE


CONSIDER ON SECTIONAL VIEW.

• CONSIDER UP TO 1.5 METER FROM THE CUTTING PLANE


LINE MARKING THE DIRECTION OF ARROW MARK.

63
www.ramtech-corp.com
3D EXAMPLE FOR
OBSERVATION A SECTION

An ISO 9001:2000
Certified Organization

64
www.ramtech-corp.com
3D EXAMPLE FOR
OBSERVATION A SECTION

An ISO 9001:2000
Certified Organization

REMOVING THE SLAB


65
www.ramtech-corp.com
3D EXAMPLE FOR
OBSERVATION A SECTION

An ISO 9001:2000
Certified Organization

OBSERVATION OF PLAN FROM ABOVE &


PLACING THE SECTION LINE.
66
www.ramtech-corp.com
3D EXAMPLE FOR
OBSERVATION A SECTION

An ISO 9001:2000
Certified Organization

SECTIONAL PLANE CUT AT THE


ABOVE MARKED POSITION
67
www.ramtech-corp.com
3D EXAMPLE FOR
OBSERVATION A SECTION

An ISO 9001:2000
Certified Organization

REMOVING THE BACK PORTION OF


SECTIONAL PLANE.

68
www.ramtech-corp.com
3D EXAMPLE FOR
OBSERVATION A SECTION

An ISO 9001:2000
Certified Organization

69
www.ramtech-corp.com
3D EXAMPLE FOR
OBSERVATION A SECTION

An ISO 9001:2000
Certified Organization

OBSERVATION
70
www.ramtech-corp.com
GETTING A SECTIONAL VIEW

An ISO 9001:2000
Certified Organization

SECTIONAL VIEW OF ABOVE SLIDE

71
www.ramtech-corp.com
HOW THE SECTIONAL VIEW
IS PREPARE ?

An ISO 9001:2000
Certified Organization
• MAKING THE AUTO CAD FILES IN TO TWO HORIZENTAL VIEW
PORTS BY USING “VIEWPORTS COMMAND” AND SET PLAN ON
UPPER VIEW PORTS AND DRAW THE SECTIONAL ELEVATION
BELOW THE PLAN ON LOWER VIEW PORT. (SEE THE BELOW
SNAP SHOT)

72
www.ramtech-corp.com
HOW THE SECTIONAL VIEW
IS PREPARE ?

An ISO 9001:2000 • DRAW ARCHITECTURAL ELEVATION FROM PLAN BY


Certified Organization DRAWNING X-LINE FROM THE WALL WITH CONSIDERING THE
FALSE CEILING HIEGHT, SLAB THICKNESS, FINISHED FLOOR
LEVEL AND BEAMS REFERING THE SRUCTURAL AND
ARCHITECTURAL FILE GIVEN BY CONSULTANT. (SEE THE
BELOW SNAP SHOTS)

73
www.ramtech-corp.com
HOW THE SECTIONAL VIEW
IS PREPARE ?

An ISO 9001:2000 • DRAW ALL PIPES AT SECTIONAL VIEW IN DOUBLE LINE


Certified Organization
WHETHER IT APPEAR IN PLAN IN SINGLE LINE OR MAY BE IN
DOUBLE LINE.

• SHOWING ALL PIPES WHETHER IT IS IN HIEGH LEVEL OR AT


LOW LEVEL WITH ITS FITTINGS, CONSIDERING THE SHOP
DRAWING AND MENTION THE BOTTOM OF PIPE AND PIPE
DIAMETER AS FOLLOWS BY STANDARD RECOMMENDED BY
CONSULTANT.

SINGLE LINE PLAN OUTPUT

PIPES IN DOUBLE LINE AT SECTION


74
www.ramtech-corp.com
HOW THE SECTIONAL VIEW
IS PREPARE ?

An ISO 9001:2000 • PLACING ALL THE ELEVATIONAL FIXTURES APPROVED BY


Certified Organization CONSULTANT WITHIN THE SECTIONAL VIEW.

• MENTION THE TYPE OF PIPE AND BOTTOM OF EVERY PIPE FROM


FINISHED FLOOR LEVEL

• DIMENTION THE HOT WATER AND COLD WATER PIPES SUPPLY TO THE
FIXTURES AS PER STANDARDS GIVEN BY CONSULTANT

FIXTURE AND BOP SHOWN


IN SECTION
75
www.ramtech-corp.com
HOW THE SECTIONAL VIEW
IS PREPARE ?

An ISO 9001:2000
Certified Organization

FIXTURES SHOWN IN
SECTIONAL VIEW
76
www.ramtech-corp.com
WATER SUPPLY SECTION

An ISO 9001:2000
Certified Organization

77
www.ramtech-corp.com
WATER SUPPLY SECTION

An ISO 9001:2000
Certified Organization

78
www.ramtech-corp.com
WATER SUPPLY SECTION

An ISO 9001:2000
Certified Organization

79
www.ramtech-corp.com
WATER SUPPLY SECTION

An ISO 9001:2000
Certified Organization

80
www.ramtech-corp.com
PROCEDURE FOR BOTTOM OF PIPE

An ISO 9001:2000
Certified Organization BOTTOM OF PIPE
THE DISTANCE FROM THE FINISHED FLOOR LEVEL(FFL)
TO THE BOTTOM OF INSULATED PIPE IS BOP. THE WATER
PIPES HANGS BETWEEN SLAB AND FALSE CEILING LEVEL
WITH SUPPORTERS. IF IS INTERFERENCE & FOULING
WITH DUCT OR OTHER EQUIPMENT, IN THAT CASE WE
USE TO BEND THE PIPE AS UP & DOWN, THEN FOLLOWS
THE ROUTING.

FOR CALCULATING THE BOP VALUE

FFL OF CURRENT FLOOR______________(FROM ARCH.


LAYOUT) SSL & SLAB THICKNESS OF THE ABOVE
FLOOR__________(FROM STRUCTURAL LAYOUT) FALSE
CEILING LEVEL MUST BE GREATER THAN 2400MM FROM
FFL.

• CONSIDERING THE FALSE CEILING LEVEL WATER PIPES


RUNNING 100MM APPARTS.

• ALWAYS PREPARED HOT WATER RUNNING


APPROXIMATELY 100MM DISTANCE ABOVE FROM THE
COLD WATER PIPE LINES.

81
www.ramtech-corp.com
PROCEDURE FOR BOTTOM OF PIPE

An ISO 9001:2000
Certified Organization
• BOTTOM OF PIPE MUST BE GIVEN FROM THE STARTING POINT
THAT IS FROM RISER TO THE TILL END OF THE WATER SUPPLY
TO FIXTURES AND SHOULD BE GIVEN TO ALL INDIVIDUAL
PIPE LINES.

FOR EXAMPLE : LET Ø65 PIPE IS RUNNING TO THE


APPARTMENT FROM RISER CONSIDERING THE BOTTOM OF
LEVEL AT STARTING POINT FOR HOT WATER 2850 MM AND
FOR COLD WATER 2750 MM FROM FINISHED FLOOR LEVEL.

• AFTER SOME DISTANCE IT REDUCES TO Ø42 MM

• CALCULATING THE BOP 65-42=23MM/2=11.5MM


ROUNDING IT TO 12 MM APPX.

• MEANS Ø42 MM HOT WATER PIPES BOP 2850-12= 2838 MM


FROM FINISHED FLOOR LEVEL.

• SIMILARLY FOR Ø12 MM COLD WATER 2750-12= 27385MM


FROM FINISHED FLOOR LEVEL.

82
www.ramtech-corp.com
PREPARING A ISOMETRIC DRAWING

An ISO 9001:2000
Certified Organization • SET THE DRAWING AREA INTO TWO HORIZONTAL VIEWPORTS
BY USING “VIEWPORTS” COMMAND.
• ADJUST THE UPPER VIEWPORT IN SOUTH\WEST ISOMETRIC
VIEW TO THE PLAN.
• ADJUST THE LOWER VIEWPORTS IN THE ISOPLANE ANGLE TO
WORK IN 90 DEGREE AND 30 DEGREE ANGLE, BY USING
“SNAP” COMMAND.
• Specify snap spacing or [ON/OFF/Aspect/Rotate/Style/Type]
<0.5000>: S
• snap grid style [Standard/Isometric] <S>: I
• Specify vertical spacing <0.5000>: Enter
• THIS COMMAND PROMPT SET THE CROSSHAIR INTO
ISOPLANE.
• “F5” BUTTON IS USE TO CHANGE THE CROSSHAIR INTO
VARIOUS X AND Y DIRECTION.
• REFERING THE ROUTING OF HOT WATER & COLD WATER AS
PER SHOWN IN PLAN STARTING FROM ELECTRICAL WATER
HEATER TO TILL END OF THE WATER SUPPLY.
• GIVE ALL THE PIPES BOTTOM OF PIPE AND SIZES
CONSIDERING A FINISH FLOOR LEVEL LINE.

83
www.ramtech-corp.com
PREPARING A ISOMETRIC DRAWING

An ISO 9001:2000
Certified Organization

SETTING THE SHOP DTAWING IN SOUTH


WEST ISOMETRIC VIEW
84
www.ramtech-corp.com
PREPARING A ISOMETRIC DRAWING

An ISO 9001:2000
Certified Organization

PREPARED ISOMETRIC VIEW


REFERING THE ROUTING OF PIPES
FROM SHOP DRAWING .
85
www.ramtech-corp.com
PREPARING A ISOMETRIC DRAWING

An ISO 9001:2000
Certified Organization

ISOMETRIC DRAWING OF
AN ANOTHER APARTMENT
86
www.ramtech-corp.com
Output : Plumbing Layout 3D (ABS)

An ISO 9001:2000
Certified Organization

87
www.ramtech-corp.com
Output : Plumbing Layout 3D (ABS)

An ISO 9001:2000
Certified Organization

88
www.ramtech-corp.com
Output : Plumbing hot & cold water
Layout 3D (ABS)
An ISO 9001:2000
Certified Organization

89
www.ramtech-corp.com
Output : Cold & Hot water high
level Connection 3D (ABS)
An ISO 9001:2000
Certified Organization

90
www.ramtech-corp.com

You might also like