You are on page 1of 132

SD-45 Terra Firma

Break-In, 50 - 100 Hours


10 Hours, Daily
50 Hours, Weekly
250 Hours, Quarterly
1000 Hours, Yearly
Locked Condition

Stowed Condition

Articulation Lock
Stamped in Frame

Tag

Serial Number Identification


Break-In, 50 - 100 Hours
10 Hours, Daily
50 Hours, Weekly
250 Hours, Quarterly
1000 Hours, Yearly
Change Eccentric Oil
Break In
Locate Tab at the 12 O’clock Position

Break In
Insert Pencil to Aid in Alignment from Seat

Break In
8 Quarts / 7.6 Liters

Drain Eccentric Oil


Break In
Add Eccentric Oil

8 Quarts / 7.6 Liters


Synthetic

Break In
Oil Should be Present at Gauge

Break In
Change Axle Oil
Break In
Drain Oil from Axle

Drain Plug

7 Quarts / 6.8 Liters

Break In
Add Oil Through the Fill/Level Plug

Fill / Level Plug

7 Quarts / 6.8 Liters


SAE 80w-90
Break In
Change Wheel End Oils

.79 Quarts / .7 Liters

Drain Plug

Position Plug at the 6 O’clock Position

Break In
Oil Should be Present at the Fill Level Plug

.79 Quarts / .7 Liters


SAE 80w-90
Fill / Level Plug

Position Plug at the 3 O’clock Position

Break In
Inspect and Torque Axle Hardware

540 Ft. Lbs. / 730 Nm


Break In
Torque Pin to 148 Ft. Lbs. / 200 Nm

Loosen Lock Plate Hardware

Loctite (red 271) and Torque


to 45 Ft. Lbs / 61 Nm

Torque Articulation Pin


Break In
Torque Pin to 148 Ft. Lbs. / 200 Nm
Loosen Lock Plate Hardware

Loctite (red 271) and Torque


to 45 Ft. Lbs / 61 Nm

Break In Torque Oscillation Pin


Change Carrier Oil
Break In
.1 Quart / .1 Liter

Drain Carrier Oil


Break In
Add Carrier Oil

Remove Breather Plug Add


.1 Quart / .1 Liter Synthetic

Break In
Verify Oil Level

Level Plug

Break In
Break-In, 50 - 100 Hours
10 Hours, Daily
50 Hours, Weekly
250 Hours, Quarterly
1000 Hours, Yearly
Reference Maintenance Decal

Daily
Inspect Machines Overall Condition

Hoses & Clamps

Handrails

Tires

Oil Leaks

Hardware

Daily
Inspect Drum Assembly

Hardware

Shocks

Drum Surface

Oil Leaks

Daily
Inspect Scraper Condition & Adjustment

Daily
Check Engine Oil Level

Daily
Add Oil if Needed

15w-40

Daily
Check Coolant Level

Daily
Add Coolant if Needed

50% Antifreeze / 50% Water

Daily
Drain Water from Separator

Daily
Check Fuel Level

Daily
# 2 Diesel

Fuel Fill
Daily
Park Brake Test

Push and Hold Test Switch


Test for 2-3 Seconds

Park Brake On

Machine Should Not Move in the Brakes


Applied Position
Daily
Check Air Cleaner Integrity

Clamps

Brackets

Tubes

Daily
Check Air Cleaner Restriction Indicator

Replace Air Cleaner if Light Illuminates

Daily
Remove Housing Cover

Daily
Primary Element
Safety Element

Change with Every Third Primary Element Change


Inspect Element Seal Area
Inspect Fan & Belts
Daily
Inspect Radiator & Cooler for Debris

Daily
Break-In, 50 - 100 Hours
10 Hours, Daily
50 Hours, Weekly
250 Hours, Quarterly
1000 Hours, Yearly
5 Shots MPG - EP2

Grease Articulation Pins


50 Hours
Grease Oscillation Pin

5 Shots MPG - EP2

50 Hours
Grease Front Steering Pin

3 Shots MPG - EP2

No Maintenance Required for Rear Pin


Greaseless Bearing Used

50 Hours
Check Tire Pressures

Check with Stem at 12:00

18 psi / 12 bar

50 Hours
Check Hydraulic Oil Level

Add Oil if Required

ISO VG 46

Level Gauge

50 Hours
Check Wheel End Oil Levels

Fill Level Plug


in Position

SAE 80w-90

50 Hours
Check Axle Oil Level

Fill / Level Plug

SAE 80w-90

50 Hours
Torque Wheel Nuts

407 Ft. Lbs. / 550 Nm


50 Hours
Check Eccentric Oil Level

Oil Level Gauge

50 Hours
Terminals & Cables

Hold Down Hardware

Check Battery Condition


50 Hours
Check Carrier Oil Level

50 Hours
Break-In, 50 - 100 Hours
10 Hours, Daily
50 Hours, Weekly
250 Hours, Quarterly
1000 Hours, Yearly
Change Engine Oil
250 Hours
Drain Engine Oil

Remove Drain Plug

8.5 Quarts / 8 Liters


250 Hours
Change Engine Oil Filter

250 Hours
Add Recommended Oil

15w-40

250 Hours
Verify Oil Level

250 Hours
Change Both Hydraulic Oil Filters

250 Hours
Change Fuel Filters

250 Hours
Clean Axle Breathers
250 Hours
Clean Carrier Breather

250 Hours
Grease Carrier Seal

250 Hours
Inspect and Torque Axle Hardware

250 Hours 540 Ft. Lbs. / 730 Nm


Check Cooling System Integrity
250 Hours
Break-In, 50 - 100 Hours
10 Hours, Daily
50 Hours, Weekly
250 Hours, Quarterly
1000 Hours, Yearly
Change Axle Oil

1000 Hours
Change Wheel End Oil

1000 Hours
Change Eccentric Oil

1000 Hours
Change Carrier Oil

1000 Hours
Change Hydraulic Oil
1000 Hours
Drain Plug

25 Gallons / 96 Litters

Drain Hydraulic Tank


1000 Hours
Remove and Clean Suction Strainers
1000 Hours
Clean Hydraulic Tank

1000 Hours Access Lid


Add Recommended Hydraulic Oil

25 Gallons / 96 Litters
ISO VG 46

1000 Hours
VERIFY OIL LEVEL

Level Gauge

1000 Hours
Drain, Flush and Replace Coolant
1000 Hours
Drain Coolant from Radiator

Drain

17 Quarts / 16.5 Liters


1000 Hours
Follow Radiator Fill Procedures

1000 Hours
Open Vent to Purge While Filling

1000 Hours
17 Quarts / 16.5 Liters
50% Anti Freeze / 50% Water

Add Through Radiator Cap

Run Engine for 25 Minutes


1000 Hours
Shut Engine Down

Add Coolant to the High Level on Recovery Bottle

1000 Hours
Torque Pin to 148 Ft. Lbs. / 200 Nm

Loosen Lock Plate Hardware

Loctite (red 271) and torque


to 45 Ft. Lbs / 61 Nm

Torque Oscillation Pin


1000 Hours
Torque Pin to 148 Ft. Lbs. / 200 Nm
Loosen Lock Plate Hardware

Loctite (red 271) and Torque


to 45 Ft. Lbs / 61 Nm

Torque Articulation Pin


1000 Hours
Check and Adjust Engine Valves

1000 Hours
Check Belt Condition

1000 Hours
Controls
Operation Decal
Ignition
Throttle, Left Side of Operators seat
F-S-R
Forward-Stop-Reverse

Emergency Stop
Vibration On / Off Switch
Horn
Dash
Right Console Panel

Brake Test

Park Brake
Components
Battery Access
Battery Compartment
Fuse Location
Fuses
Vibration Solenoid

Brake Release Pump Return to Neutral

Solenoids
Alternator
Electric Panel
Brake Latching Relay

Starter Relay Power Relay

Relays
Shut Down Timer
Oil Pressure Sensor
Starter
Fusable Links
Horn
Radiator Assembly
Chain Insert

Bar Insert

Deck Tilt
Deck Lock Bar
Deck Pivot

Front Deck Shock


Remove Hardware to Tilt Deck

Rear Deck Shocks


Carrier
Vibration Motor
Drum Drive Motor
Clamp on Pad foot Shell with Combination Scraper
Equal Gap Between Both Sections

Bar Used for Smooth Drum


Equal Gap Between Both Sections

Bar Used for Smooth Drum


Cleaning Bars used for Pad foot
Drum Shocks
Steering Valve
Cummins Engine
Cummins Engine
Radiator Assembly
Axle
Cooler Thermal Bypass

You might also like