ORAL PRESENTATION ON STUDENTS INDUSTRIAL WORK EXPERIENCE SCHEME

(SIWES)
UNDERTAKEN AT

PNL CONSTRUCTION LIMITED, 44, CHRIS


MADUEKE DRIVE, LEKKI PHASE 1, LAGOS STATE.

COMPILED BY
OKE OLUWAFEMI AYODELE
BDG/18/7287
OUTLINE

• INTRODUCTION
• LAND RECLAMATION AND FLOORING
• STONE APPLICATION
• PLACING OF KERBS STONE FOR
PROPOSED ROAD
• CONCLUSION
INTRODUCTION

• PNL CONSTRUCTION LIMITED The core values of the


• PNL Construction Limited is a dynamic and company are;
innovative construction company that began its
operations in 2016. With a strong commitment to • Excellence
excellence and customer satisfaction, PNL
Construction has quickly established itself as a • Integrity
trusted name in the industry. We specialize in
delivering high-quality construction projects, • Collaboration
ranging from residential buildings to commercial
complexes, ware houses, power plants and roads
• Innovation
construction as well as maintenance. • Safety
INTRODUCTION CONT’D

PNL CONSTRUCTIO LTD ORGANIZATION CHART


LAND RECLAMATION &
FLOORING
It is the process of creating new land
from water or low-lying areas. This can
involve adding soil, rocks, or other
materials to an existing body of water.
LAND RECLAMATION &
FLOORING
Placement of fill materials( Boulders, granite, sand)
were carried out Manually and mechanically
LAND RECLAMATION & FLOORING

Trench excavation & casting for floor ground beam


LAND RECLAMATION &
FLOORING
Construction of form work, placing of damp proof
material, reinforcement and casting
STONE BASE
APPLICATION

Stone base, also known as a


base course or sub-base, is a
crucial component in
various construction
projects, particularly in road
and pavement construction.
It serves as a foundation
upon which subsequent
layers are built, providing
stability, support, and
drainage control.
STONE BASE APPLICATION

Mechanical application Compaction


PLACING OF KERB
STONES FOR
PROPOSED ROAD

Kerb stones, are short, stone or concrete blocks used


to delineate the boundary between the roadway and
the adjacent pavement, sidewalk, or verge.
APLICATION OF KERB STONES
FOR PROPOSED ROAD
CONCLUSION &
RECOMMENDATION
CONCLUSION: RECOMMENDATION:
At the end of my industrial • The institution or industrial
training programme, I was liaison should help student
able to achieve the ultimate to secure placement as much
objective of SIWES, which is as possible since it is
to provide student the becoming more tedious
opportunity to apply their nowadays.
theoretical knowledge in real • Routine visits should be paid
work situation thereby to students at their places of
bridging the gap between work randomly to assess the
theory and practice. progress of work.
THANK YOU FOR
LISTENING.