You are on page 1of 54

EXCEL CONSTRUCTION LTD.

“ACHIEVING QUALITY AND VALUE ON TIME”


Introduction

Excel Construction Ltd. was incorporated in 1992 as a Joint


Venture between the Madhvani Group Ltd. and Gomba
Construction Company Ltd and by virtue of majority
shareholding is a Ugandan Construction Firm.
The company operates nationally and regionally from its
Head Office in Jinja and liaison Office in Kampala and is one
of the leading players in the Ugandan Construction Industry.
As a Venture partner with Madhvani Group Ltd. that is at the
forefront of industrial development in Uganda and the region,
Excel has access and support to :
• A world-wide network of offices for procurement.
• Project finance & management expertise.
Certifications

Excel Construction Ltd. is:

➢ ISO 9001:2015 certified.


➢ Health and Safety compliant with Internationally set industry standards
towards HSE policies and guidelines. “Institution of Occupational Safety
and Health” (IOSH)
Excel Construction Ltd's Portfolio
Projects undertaken by Excel include construction,
rehabilitation and renovation of :
▪ Various civil enabling projects in the Oil and Gas sector
▪ Hospitals and Health Centers
▪ Universities, Schools and other Educational Institutions
▪ Industries and Industrial Parks
▪ Office Buildings
▪ Water works
▪ Road works
Excel’s Footprint in Uganda and the
Region
JUBA
OIL AND GAS SECTOR
Excel has been actively involved in the development of the
Oil and Gas Sector in Uganda since 2007 to date providing
Various Civil enabling works for Tullow oil Plc, Heritage,
Total E&P Uganda Ltd and CNOOC (U) Ltd.
Various ancillary works executed by Excel e.g :
• large volume of earthworks
• Stabilization of top soil
• Detailed survey prior to start of the project
• Restoration of the site where these works have been carried out
Preparatory works for construction of Drill pads
Preparatory works for construction of Drill pads and
waste pits
Earthworks for construction of
waste pits Casting of concrete for waste pit

Stabilization of top soil using lime


Construction of Lined waste pits
Completed Drill Pads

Gunya C Pad Mbegu Heritage

Completed Drill Pad (Ngasa Drill Pad)


Covered erection of steel structures for parking of
fire fighting equipment and generators
Preparatory works for assembly of Water intake pipes
Laying of Water intake pipes
Supply and assembly of temporary prefabricated units for
various purposes e.g. accommodation ,offices and ablution
facilities for Tullow Oil Plc and CNOOC (U) Ltd.

Delivery of panels for prefabricated units to Assembly of prefabricated


the site accommodation units
Completed Prefabricated units
Other ancillary works carried out on various
sites

Creation of drainage and parking Material Laydown area


Installation of Snake proof fence
After site completion

Parking yard for Fire Brigade Fire fighting training

Watering of restored grass Watering of restored grass


EXCEL CONSTRUCTION LTD.'S CAMP IN BULIISA DISTRICT DESIGNED
AND BUILT ON 7 ACRES OF LAND TO ACCOMMODATE UP TO 90
WORKERS

Camp entrance gate manned by


Access road created to the camp 24hour security service

Camp entrance gate manned by


Parking yard
24hour security service
EXCEL CONSTRUCTION LTD.'S CAMP IN BULISA DISTRICT
DESIGNED TO ACCOMMODATE UP TO 90 WORKERS

Office and administration block Shaded meeting area

Camp clinic block Senior staff accommodation


EXCEL CONSTRUCTION LTD.'S CAMP IN BULISA DISTRICT
DESIGNED TO ACCOMODATE UP TO 90 WORKERS

Kitchen
Canteen

Dormitories for junior workers

Workers’ entertainment hall (after working hours)


Construction and Equipping of Moroto Regional Referral Hospital
Completed in 2015
Funded by World Bank
Construction and Equipping of Hoima Hospital
Funded by Japan International Cooperation Agency “JICA”
Completed in 2017
Construction of Central Teaching Facilities in Makerere
University, Kampala
Completed in 2017
Funded by Africa Development Bank “ADB”
Construction of 24 schools and additional facilities in the Karamoja
Region of Uganda
Completed in 2015
Funded by Irish Aid
Construction of various schools and additional facilities in the
Karamoja Region of Uganda
Extension, Rehabilitation and Renovation works at
St. Francis’ Chapel, Makerere University
Extension of Brew House and Construction of new Packaging hall
for Nile Breweries ltd. in Jinja
Completed in 2009
Funded by SABMiller
Construction of Uganda Malting Plant at Nile Breweries Ltd. Jinja
Completed in 2011
Funded by SABMiller
Construction Of Effluent Treatment Plant at Nile Breweries in
Jinja
Completed in 2011
Funded by SABMiller
Construction of Greenfield Breweries in Mbarara.
Completed in 2013 Funded by SABMiller
Construction Of Office Building For Madhvani Group Ltd. in
Kampala
Completed in 2012
Funded by Madhvani Group Ltd. “MGL”
Construction of Box culvert at the new Jinja Nile Bridge
Completion of UMI Teaching Institute on Jinja Road,
Kampala

Front view of the building Rear view of the building

Side view of the building Night view of the building


HEALTH, SAFETY AND ENVIRONMENT

• Strict HSE Controls are put in place to ensure a conducive work environment for employees.
• Strict HSE Procedures and Policies are put in place to ensure minimal negative impacts of
the Company’s project activities to the community.
• All workers are provided with the basic and task specific PPE
and are regularly trained on optimal usage of the PPE.
• Toolbox talks are held everyday on site
• PPE Signages are also put up at strategic points on the project
site and in the Company’s camp.

Typical examples of easy to understand signages that show


hazards expected on site and the nature of PPE to be used in
order to mitigate risks associated with particular project
INVOLVEMENT OF STAKEHOLDERS

• Local leaders are informed about the project and are also involved during
execution of the project. This is done in order to ensure smooth implementation
of the project specific Social Management Plan. The local leaders are also
invited to participate in monthly site meetings.
CODE OF CONDUCT

• Code of conduct for personnel is provided on site.


In the Code of conduct several unacceptable acts
are addressed to shape the behaviour of workers
e.g. sexual harassment, child abuse, violence, abuse
of human rights, substance abuse, HSE violations, etc
BRIEF GLANCE AT THE COMPANY’S CSR INITIATIVES
Donation of Scholastic items to students of the 24
Schools constructed by Excel in the Karamoja
region of Uganda
Donation of Scholastic items to students of the 24
Schools constructed by Excel in the Karamoja
region of Uganda
Excel Construction Ltd’s team distributing food items to the
people of Karamoja region during a drought
Excel Construction Ltd. provides voluntary HIV
testing and counselling for company workers on all its site
HIV/AIDS sensitization programs that are part of the
Company’s continual development of its CSR initiatives on all
its project sites.
Sourcing for resources (materials and man power)
International procurement
will only come into play
strictly if certain resources
are not available in the
country 5th Priority

Kampala and/or other


parts of the country 4th
Priority

Other districts in the


vicinity of the project site
3rd Priority

Immediate
neighboring district
2nd priority

District of project
execution
1st priority
Breakdown of Company’s Manpower Resources
92% of all employees of Excel Construction Ltd. are Ugandan
nationals
Materials/goods and services:
Local suppliers/manufacturers shall be engaged for provision of the
following services;

- Waste disposal - Cement


- Medical services - Electrical fittings
- Security services - Roofing materials
- Locally available construction - PPE
materials e.g. aggregate, lake
- Fire fighting equipment
sand, fill material (e.g. gravel)
- Catering services
- Steel products
- Paint, Epoxy, water proofing
- Plumbing materials
material
- Timber (both hard and soft wood)
- Gabions
- Stationery
- Etc.
Contacts

Head office Jinja


43/45 Eng. Zikusooka way
P.O.Box 1202, Jinja, Uganda
( +256-434-122068/69
Fax: +256-434-123150
* excel@excelconstruction.org

Kampala office
PLOT M663, UMA show ground,
Kampala, Uganda
( +256-414-505959
Fax: +256-414-505978
* xlk@excelconstruction.org
Web: www.excelconstruction.org