Professional Documents
Culture Documents
2 MILLION
Business Name Registrations in 2024
C
Permit Licensing System (iBPLS) in eGovPH
App
NCR 20 20 100%
PURPOSE OF THE SURVEY CAR 54 54 100%
R1 85 85 100%
To identify and mitigate risks that may R2 90 90 100%
impact the Negosyo Centers’ operations R3 139 139 100%
or its ability to support the MSMEs. This R4A 135 135 100%
includes risks related to resources, R4B 61 58 95%
manpower, location, among others. R5 91 91 100%
R6 139 139 100%
R7 79 73 92%
R8 145 145 100%
RESPONDENTS R9 68 68 100%
R10 96 96 100%
of total NCs
99%
R11 53 53 100%
responded to the R12 53 53 100%
survey CARAGA 48 48 100%
TOTAL 1,356 1,347 99%
NCBC Survey
SURVEY SECTIONS
• Inventory of Resources/
Supplies/Furniture
• Inventory of Personnel
• General Matters
NCs by Type
and Location
City/Municipality LGU 1165 87%
DTI Provincial Office 78 6%
Provincial LGU 43 3%
Academe 10 0.7%
DTI Regional Office 8 0.6%
• Unstable/no internet
connection
• Competent personnel
• Limited office space/ facilities
• Strong collaboration with
and utilities • Devolution
LGU • Digital transformation
• Understaffed/limited • High turnover rate of BCs
• Accessible and visible to • Growing number of
personnel/counterparts • Continual decrease fo the
the public partnerships and
• Limited budget for budget allocated for NCs
• spacious/ comfortable collabs
operations/activities • Bureaucratic processes
office area • Responsive LGU
• No security of tenure for the • Frequent power outages
• Equipped with necessary
BCs
equipment/ supplies
• Limited resources/ equipment/
supplies
PROPOSED
IMPROVEMENT
• Plantilla position/ provision of hazard pay
Major improvements needed for the Business Counselors
for the Negosyo Centers • Provision of stable internet connection
• Transfer to an accessible location or near
the municipal hall/ BPLO
• Provision of additional/ operational
equipment especially for the walk-in
clients’ usage
• Renovation of office/repair of signages/
furniture/ equipment/ facilities
PROPOSED
IMPROVEMENT
• Continuous provision of capacity building
programs for the BCs
Major improvements needed
• Increase budget allocation for the Negosyo
for the Negosyo Centers
Centers
• Enhance reporting system by reducing links
and integrating everything into a single
system to prevent redundancy
• Create a strategy to increase awareness of
Negosyo Center services within the local
business community
NC-PMU PLANS
• Rationalization of Regional Budget
for Negosyo Centers
• NC Audit
• NC Connect
• Review of the NC Operations
Manual
• NCOP Enhancement
• NCBC General Assembly
THANK YOU