PROPOSAL PRESENTATION
1
OUTLINE
Introduction
Problem Statement
Aim and Objectives
Justification of Study
Scope of Study
Literature Review
Description of Study Area
Research methodology
Anticipated results
References
2
INTRODUCTION
Hydropower is currently the
dominant renewable energy
source accounting for about
18% of the world total
electricity supply.
It is the use of water to
generate electricity, typically
through the use of dam or other
structure that impounds water
and use its flow or potential
energy to drive a turbine or
generator.
3
INTRODUCTION CONT’D
Hydro potential energy is
the energy store in the body
of water due to it's
elevation ,the higher the
water is above the sea level
the higher the potential
energy it has, that can be
converted to electricity by
running the water through
turbine
4
PROBLEM STATEMENT
The River Wuru in Kwara State, Nigeria is an untapped source of hydropower, and
there is a need to evaluate its potential for power generation. Thereby improve the
5
Aim
The aim of this study is limited to evaluation of hydro
potential energy of River Wuru in Kwara State.
Objective
Estimation of potential head of the river using GIS
techniques.
Prediction of average discharge of the river using selected
modelling tools.
Evaluation of hydro-potential energy of the river.
6
Justification of the study
Due to lack of insufficient power supply in the case study it is
essential to evaluate its potential in assessing electricity supply.
Scope of Study
It is limited to evaluation of hydro potential energy of River
wuru in kwara state.
Hydrological models would be developed to predict the stream
flow, estimation of the head and to estimate the hydro potential
energy of the river. 7
LITERATURE REVIEW
AUTHOR WORK RESULT
Peter T. et al., (2022) Evaluation of the Hydropower Potential Considering the technical potential, it
of the Torysa River and Its Energy Use in would be possible to install 18 mini and
the Process of Reducing Energy Poverty 12 micro hydropower plants with an
of Local Communities. output of 4705 and 720 kW on the
assessed part of the river. Based on the
assessment of the capacity factor, it is
possible to assume a significant reduction
in the threat to the population of energy
poverty in the region after the
construction of particular power plants.
8
LITERATURE REVIEW CONTINUATION
AUTHOR WORK RESULT
Odje M. et al., (2018) The hydropower potential and feasibility This article was able to shows that
analysis of Sombriero River ,River Sombriero River can generate about
State ,Nigeria 51kWh power ,ln order to improve on the
accuracy of river flow rate measurement,
standard current meter should be
adopted in flow rate measurement
instead of a wooden
float object
9
DESCRIPTION OF THE STUDY AREA
River Wuru is located in Kwara
State, near the north border with
Niger State. It flows through the
south and east passing through
many Towns and villages.
The river is located at latitude 8'
49'' 0' and longitude 3'0'' 0 and
made up of low land, with
seasonal climate of rainy and dry
season.
Occupations in this area include
fishing and farming due to the
availability of water for irrigation
purposes during dry season. 10
PROPOSED METHODOLOGY
Modeling tools SWAT
Model Data
Input
Temporal Data
Spatial Data •Rainfall, Humidity
DEM, Land use, Soil Map •Solar Radiation, Wind
Model
Setup
Model Run
Rate of Flow
Report
11
ANTICIPATED RESULT
At the end of the research,this are the following expected result.
Amedi E F (2006). Prospects for Small Hydropower Development for Rural Application in
Nigeria. Nigeria Journals of Renewable Energy. Vol, 1. No 4, pp 12-16.
UNIDO (2013). World Small Hydropower Development Report 2013 – Executive Summary.
13