• Focal officials for all the 2021 TAS targets pertaining to CoEACaP as well as cross-functional targets identified
OTHER ACTIVITIES
• Attended & completed the internal committee auditing of TAS 202o targets for HRDC, held on 15.01.2021
• A meeting amongst relevant CoEACaP’s engineers to review CHP’s SCADA Specification document was held & completed dt. 15.01.2021. The final reviewed document
was submitted to CHP dt. 18.01.2021
• Submitted the presentation slides dt. 19.01.2021, for the technical papers accepted from CoEACaP in the “International Conference on Science and Technology -
ICSciEnTec2020” , being organized by CST, Rinchending, Bhutan and scheduled to be held on 5th & 6th February in virtual platform
• 2020 EAS Target ratings for all the CoEACaP officials completed & submitted dt. 19.01.2020
• Individual EAS Targets - 2021 for all the CoEACaP officials finalized and signed dt. 29.01.2020
• All the Purchase Requisition (PR) pertaining to items provisioned by CoEACaP scheduled for January cycle completed
• PR pertaining to HRDC’s common item – “Motorized floor scrubber” also stands completed
Monthly Operating Dashboard
• Phasor Measurement Unit, which was a spill-over item of CoEACaP from 2020 was received by MMD P/ling dt. 27.01.2020. The PO for the same was placed in 2020
and the item is scheduled to be received by CoEACaP this week.
Monthly Operating Dashboard
• Primary Injection, Tan-δ / Capacitance & IR/PI tests on CHP’s Unit-1 GT-2, after completion of their internal inspection - 08.01.2021
• Battery capacity & impedance test on 220VDC, 1020AH battery bank at CHP Switchyard – 17.01.2021 to 19.01.2021
• Insulation diagnostics test on spare 66kV CT at CHP Switchyard – 18.01.2021 to 19.01.2021
• Tan delta & Capacitance test on 66/11kV, 3MVA Transformer-1 at CHP Switchyard – 20.01.2021
• Primary injection test on 66/11kV, 3MVA Transformer-1 at CHP Switchyard – 21.01.2021
• HIPOT HVDC test on U-1 & U-2 generator stator winding for VOITH Hydro at THyE (After complete installation of Top bars) - 25.01.2021 to 27.01.2021
Monthly Operating Dashboard
• CoEACaP – Nu. 0.756 M (Internal – Nu. 0.144 M & External – Nu. 0.612 M)
• CoECGE - Nu. 0.000M.
• CoECBM - Nu.0.430M. (CBMA - Nu. 0.119M & CTA – Nu. 0.311M)
Deadline/ Weightage
ISO SN Description Status
Target (%)
JV in HM
As Per
Q 3.2.2 Establish and Train Team for Implementation of 5
Schedule
HM Services
Deadline/ Weightage
ISO SN Description Status
Target (%)
Instrumentation at Puna I
QO 3.2.5 May 5
Signing of contract and provide services
Deadline/
ISO SN Description Weightage (%) Status