Buildability and Maintainability Analysis Report (Ani Victor Chinonso 2020030193947)
Buildability and Maintainability Analysis Report (Ani Victor Chinonso 2020030193947)
For a
For
MR. SUNDAY ANIANGENE
At
AMAGU, AKEGBE UGWU NKANU WEST LGA,
ENUGU STATE.
By
ANI VICTOR CHINONSO
2020030193947
In
BUILDING TECHNOLOGY
400 LEVEL
Warning
2. Tolerance:
The WHB and WC in the visitor’s inconvenience The WHB could either be beside the WC or Removed.
room are too close and might be inconvenient for the
user.
3. Discrepancies:
(intra design)
B4 symbol in Electrical design has no detail. Detail should be give to the B4 symbol for a better
and clearer understanding.
4. Omissions:
No Rail for the Ground floor apartment front door . Addition of Rail to the design will increase the
aesthetics of the building.
5. Errors:
The front and back elevations are supposed to be the The mentioned elevations should be switched, just
side elevation. like viewing the floor plans from the left side
And the Side elevations are supposed to be the front
and back elevations.
6. Variety:
7. Conversion:
No conversion Necessary
8. Handling :
9. Personnel Skill:
The guidelines for maintenance are not yet provided Immediate provision of the Guidelines pertaining all
for the simplicity of maintenance work. complex components of the building design for a
simple and organized maintenance.
All Errors,Omissions,Intra-Discrepancies,Tolerance
and Guideline should be attended to as soon as
possible before
Builder's Name Sign & Stamp