BUILDABILITY AND MAINTAINABILITY ANALYSIS REPORT

For a

PROPOSED RESIDENTIAL DEVELOPMENT

For
MR. SUNDAY ANIANGENE
At
AMAGU, AKEGBE UGWU NKANU WEST LGA,
ENUGU STATE.
By
ANI VICTOR CHINONSO

2020030193947

In

BUILDING TECHNOLOGY

400 LEVEL
Warning

Buildability and Maintainability Analysis of this


building production information must not be
misconstrued to mean, that a builder is to check what
the designers have prepared. Only professional peers
can check each other's work. A Builder is only to study
the production information from production point of
view and suggest ways by which the design could be
more production friendly for the direct benefit of client
ideveloper This professional input of a builder is to
complement the efforts of the designers with the
singular objective of giving clients value for their
money and enhancement of the image of the
construction industry.
VICTOR CONSTRUCTION CONSULTANTS
(Consultant Builders)
BUILDABILITY AND MAINTAINABILITY ANALYSIS REPORT

Project Title: PROPOSED RESIDENTIAL DEVELOPMENT.

Client/Developer: MR. SUNDAY ANIANGENE

Location: AMAGU, AKEGBE UGWU NKANU WEST LGA, ENUGU STATE.

Report Number: 030193947

Date: Feb 2024

OBSERVATIONS SUGGESTED OPTIMAL SOLUTIONS


1. Dimensional Coordination :

All the Dimensional Coordinates corresponds to each


other

2. Tolerance:

The WHB and WC in the visitor’s inconvenience The WHB could either be beside the WC or Removed.
room are too close and might be inconvenient for the
user.

3. Discrepancies:
(intra design)
B4 symbol in Electrical design has no detail. Detail should be give to the B4 symbol for a better
and clearer understanding.

4. Omissions:

No Rail for the Ground floor apartment front door . Addition of Rail to the design will increase the
aesthetics of the building.

5. Errors:

The front and back elevations are supposed to be the The mentioned elevations should be switched, just
side elevation. like viewing the floor plans from the left side
And the Side elevations are supposed to be the front
and back elevations.
6. Variety:

No Varieties in the building Design.

7. Conversion:

No conversion Necessary

8. Handling :

The components and sub-components of all


structures could be easily assembled and mounted at
the construction site as no other electric or
mechanical device or machine will be needed.

9. Personnel Skill:

All the necessary skill needed for what has been


designed are all ready and at an affordably low cost
.
10. Details:

All details for the design of this building has been


stated clearly for a professional Contractor to
understand.
11. Spare Parts:

All materials and components stated on this building


design are all available and readily to pick up at any
local building material store.

12. Access for Maintenance:

The building design is accessible for maintenance


despite how long it could stay before being faulty.
13. Guidelines for Maintenance:

The guidelines for maintenance are not yet provided Immediate provision of the Guidelines pertaining all
for the simplicity of maintenance work. complex components of the building design for a
simple and organized maintenance.

14. Buildability and Maintainability Factor:

According to Observation this design is hereby


confirmed to be achievable in terms of cost and
buildability and is rated 48%.

15. General Comment:

All Errors,Omissions,Intra-Discrepancies,Tolerance
and Guideline should be attended to as soon as
possible before
Builder's Name Sign & Stamp