You are on page 1of 1

476

Index

[Cost] field costs, 128 fire protection, 127 home office, 128 instrumentation, 125 insulation, 128 painting, 128 piping, 124 site preparation, 126-127 start up, 128- 129 structural steel, 127-128 control, 199-200 estimate checking, 131- 134 estimate summary, 1 19 Design: conceptual, 50-52 detailed, 168- 17 1 phase 0,52-53 phase 1,53-55 process, 49-63 Designbuild contract, 139 Detailed engineering, (see Engineering, detailed) Detailed estimates, 1 16 Direct cost, 117, 118, 123 Dismantling account, 128 Documentation checklist,241 -243 Durations: construction, 40 project specific, 93 total project, 45-46 Economic analysis, 24-25 Electrical: account, 125- 126 estimating, 302-308 Electric heat tracing, unit prices and work hours, 296 Engineering, detailed, 9, 164-1 76 executed by contractors, 166- 167 basic, 167- 168

[Engineering. detailed] coordination and control, 17 1 detailed design, 168-17 1 small project execution options, 171-175 contracted, 174- 175 in-house, 173 Engineering, procurement and construction contracts (EPC), 139 contractor selection, 144- 152 Environmental impact studies, 73 EPA, 70 Equipment: account, 124 estimating procedures, 260-273 erection, 273 miscellaneous equipment, 269-272 pumps, 266-267 shell and tube heat exchangers, 268-269 vessels, 262-266 Escalation, 129- 130, 339-340 Estimate: adjustments, 129-1 1,338-34 3 1 contingency, 130- 13 1,34034 1 escalation, 129, 339-340 resolution allowance, 129, 338-339 anatomy of, 1 17- 122 breakdown, 12 1- 122 checking criteria and guidelines, 131-134 check list, 362-366 definitions, 109-1 17 conceptual, 1 10,256 definitive, 110,261 engineering, 11 1 order of magnitude, 1 IO, 256 preliminary, 1 10, 261

You might also like