Semi-Detailed Estimating System

Table 19.20 Basic Piping Insulation Units


_c

.-C

--

is

Wat'l

3_

UP
:o 1

3_

Dollars &work hoursDer L.F.


2.5 in. thk
3 in. thk
2 in. thk
- 4 in. thk

r
TT--T--r
- - -- -- --

1 in. thk

,ab

1.5 in. thk

--

vlat'l

Lab

Mat'l

Lab Mat'l

Lab

Mat'l

Lab

_c=

1.5

2.80 0.20
3.10 0.20

4.80 0.21
5.40 0.21

7.50 0.23
8.30 0.23

8.50 0.26 11.40 0.31


9.50 0.26 12.20 0.31

3.30 0.21

5.90 1.22

8.70 0.24

9.70 0.27 12.70 0.32

4.1 0 0.22

6.70 0.23 10.00 0.25 11.90 0.28 14.50 0.34

5.30 0.23

7.60 0.34 11.50 0.26 13.20 0.30 16.90 0.36

6.50 0.25

8.80 0.27 13.30 0.31 17.60 0.35 20.60 0.42

9.20 0.29 10.90 0.32 16.60 0.36 21.oo 0.42 25.40 0.48

10 10.80 0.34 13.70 0.37 19.80 0.42 25.10 0.49 29.30 0.55
12 12.30 0.39 15.00 0.43 21.80 0.50 27.40 0.57 32.90 0.66
14 14.30 0.45 17.30 0.50 24.60 0.57 30.9a 0.66 37.40 0.76
16 16.90 0.52 I9.50 0.58 27.00 0.66 34.3a 0.75 42.30 0.87
18 18.20 0.57 22.1a 0.66 29.50 0.75 37.4a 0.85 46.00 0.98

--

--

20 20.30 0.64 23.50 0.75 32.60 0.84 40.7C 0.96 49.70 1.10
__3

c_I

Conversion Factors
Foam glassw SS jacket
Mat'l x 1.30
Labor x 1.35
Alum. jacket: Mat'l x 0.90
PVC jacket: Mat'l x 0.85

=__

__3

__3

Material: Fiber glass & SS jacket


Service: Up to 400" F

All units are based on doing the workat an averageheight of 10 to 30 feet above floor level.