2

301

Semi-Detailed Estimating System

Table 19.22 Comprehensive Piping Insulation Estimating Units:


Cold Service
Piping
L.F.
- per

.-K
wIn

.-c.

1
2
1.5
2
2
3
2.5
4
2.5
6
2.5
8
2.5 10
2.5 12
14
16
18
20

a
C

e
.o

2.5

3
3

3
3

Valves,

process 8 4 utility
Interconnecting
areas
Labor,
hr

0.49
0.49
0.49
0.59
0.69
0.75
0.90
1.00
1.12
1.47
1.64
1.81
2.03

S.C.,$

Labor,
hr

39.40
40.60
40.70
52.60
62.60
73.70
86.50
97.90
103.00
140.00
156.00
170.00
130.00

Subcontract = Mat'l +work hour @ $45/hr.


Material: Fiber glass & SS jacket.
Service: Down to 6F.

0.36
0.36
0.38
0.48
0.53
0.62
0.75
0.87
1.01
1.35
1.55
1.74
1.96

Each

S.C.,$

28.80
30.00
31.50
42.70
47.90
60.20
72.20
85.10
95.80
130.00
147.00
163.00
181.00

Labor, hr

0.40
0.63
3.50
4.60
5.50
6.80
8.60
11.10
11.50
15.60
15.70
17.60
19.40

S.C.3

34.30
50.70
294.00
418.00
51 5.00
694.00
897.00
1,070.00
1,220.00
1,300.00
1,550.00
1,690.00
1,830.00