HOW TO
ASSESS YOUR
MILL'S PRODUCTIVITY ?
R. Rajamanickam
R. Ranganathan
R. Suganthi
October 2003
No. 4
PREFACE
This edition replaces the last SITRA publication 'How to Assess Your
Productivity' (Vol. 46, No 8, Sep 2001). In the present edition, the
conversion factors given in Table A in Appendix have been
reworked as the norms for spinning have been revised with effect
from SITRAs 29th Productivity Survey in Spinning for September
2002. No changes have been made in the reeling and cone-winding
norms, and hence the figures in Tables B, C and D in the Appendix
are the same as in the last edition. Apart from the method of
calculation of various productivity measures used in SITRA productivity surveys, the publication also explains how the conversion factors can be applied to find out the standard production
per spindle and HOK in different counts. For the benefit of
those who prefer 20s conversion to 40s conversion, illustrative
examples have been added to show how 20s converted figures
can be easily arrived at from the corresponding 40s converted
figures. Grateful acknowledgement is made to Shri D.
Shanmuganandam, Assistant Director and Head of L&C Division,
SITRA, for making available the norms for post-spinning departments,
based on which the relevant conversion factors have been worked out.
CONTENTS
Spinning
20s Adj. Production per Spindle
Reeling
Conventional Cone Winding
Automatic Cone Winding
Appendix
1
10
11
13
15
16
SPINNING
This section describes the method of assessing productivity in spinning. Briefly, the
method consists in adjusting the various parameters to 40s cotton carded count so that a Mill
could compare its productivity from month to month and also judge its performance against
SITRA standards regardless of the differences in the counts produced. The standards are fixed
such that they reflect the productivity levels being attained or excelled by the top 10% of the
mills in the industry. The revised SITRA standards for HOK and OHS are given in Table 1.
Table 1
Standard HOK and OHS for Different Departments (40s Cotton Carded)
Department
HOK
OHS
1.4
2.0
0.7
1.8
9.1
0.18
0.26
0.09
0.24
1.19
15.0
1.96
3.8
0.50
2.6
0.34
2.7
0.35
105
Notes :
1. The level of modernisation assumed is as follows : single process
blow room with automatic lap doffing, high production cards, high-speed
draw frames (two passages), high production speed frames and high speed
ring frames (new or converted).
2. The production rates are the same as those given in the SITRA Combined Norms, Norms for Productivity in Spinning, 6th edition, 2003 (in
print).
3. Work assignments and ancillary operatives assumed correspond to those
given in the above publication.
The definitions of the various productivity parameters, the calculations of which are
illustrated and explained in this note, are given below :
HOK
ADJUSTED HOK
: The HOK (that is, the operative hours engaged to produce 100 kg. of
yarn) is adjusted to a common count of 40s cotton carded by multiplying the actual production in different counts by relevant conversion factors. The production so converted is termed standardised production.
Thus, the adjusted HOK is calculated from :
Operative Hours
x
100
CONVERSION
FACTORS
FOR HOK
: The conversion factors are the ratios of the HOKs of individual counts to
that of 40s count:
HOK for a given count
HOK for 40s cotton carded count
These HOKs have been worked out taking the production rates, work
assignments, etc., that correspond to those for the standard mill. The
conversion factors are different for different departments, and for the
cotton carded count of 40s, it is unity for all departments. Another major practical advantage of the method is that it is not required to obtain a
break-up of the operatives according to each count.
STANDARD HOK
: HOK for 40s cotton carded count under the specified conditions. Standard HOKs for different departments are given in Table 1 and the conditions under which these standard HOKs can be attained are given in
the footnotes to this Table. As can be seen, the total standard HOK for
these conditions is 15.0.
COMPOSITE
PRODUCTIVITY
INDEX (CPI)
CONVERSION
FACTORS FOR P
: These conversion factors are the ratios which the standard production per
spindle in 40s cotton carded count rounded off to two decimals (i.e.,
104.77 g.) bears to the production per spindle in the standard mill
(rounded off to two decimals) in the respective counts. That is :
104.77 g.
Std prodn per spdl per 8 hrs (g) in the given count
OHS
: Number of operatives per 1000 spindles adjusted 40s cotton carded count
obtained by dividing the product of adjusted HOK and adjusted P by
800. For standard OHS for different departments, reference may be made
to Table 1. As can be seen, the total standard OHS is 1.96.
OHSAM
EOPD
: Giving the fewer number of operatives which the standard mill would
have engaged for the same quantum of production as that for the given
Mill. Negative sign for EOPD means that the Mill engages less number
of operatives as compared to the standard mill. EOPD is arrived at as
follows:
Operatives engaged by the Mill x (100-CPI)
No. of Working Days x 7.5 x 100
SH
MPI
PFD
: Production per Frame Day in Kg., and is equal to MPI x 1.38, number of
spindles per frame being 420 as assumed for the standard mill.
As an example, suppose that the operative hours in different departments and ring
spinning production and spindle shifts for a Mill are as given in Tables 2 and 3.
3
Table 2
Operative Hours
Department
Operative Hours
4662
6262
2357
9672
32464
Total
55417
Table 3
Production and Spindle Shifts in Ring Spg.
Count
Prodn (Kg.)
20s
40s CHO
60s
72s C
80s
80s C
30988
13250
39761
5474
21074
19495
2473201
=
2473201
79.37
ADJUSTED HOK
To find the adjusted HOK, the first step is to calculate the standardised
production for different departments using the conversion factors given in Table A in
Appendix. The ring frame production in each count is multiplied by the corresponding
conversion factor appropriate to that department and the sum is taken. Thus, applying the
conversion factors given in column 3 of Table A, the standardised production for mixing and
blow room department for the above data would be :
x 0.97) + (13250 x 1.19) + (39761 x 1.04) +
[ (30988
+ (5474 x 1.28) + (21074 x 1.08) + (19495 x 1.28) ]= 141898
Operative Hours x 100
HOK =
4662 x 100
=
Standardised Production
= 3.29
141898
By making similar calculations for other departments, HOK figures in Table 4 can be arrived at.
OPERATIVES PER 1000 SPINDLES (OHS)
It will also be useful to assess separately the extent to which the differences in productivity are explained by the production per spindle and the number of operatives engaged.
The number of operatives engaged per 1000 spindles adjusted to 40s cotton carded
(OHS) can be calculated by using the formula.
HOK x P
OHS =
800
where P is the production per spindle per 8 hours in grams, and both HOK and P have been
adjusted to 40s count on the lines explained earlier.
For the example considered, the total OHS as obtained from this formula is :
35.12 x 79.37
= 3.48
800
The OHS figures for individual departments (Table 4) as well as those for ring frame
tenters, doffing boys and others (Table 5) can be worked out similarly from the corresponding
HOKs.
MODIFIED OHS ( OHSAM )
From the definition of OHS given above, it follows that OHS is a function of production per spindle (P), although for small deviations in production per spindle, say, less than 5%,
the workers complement engaged in different departments can be expected to remain practically unchanged. However, for any large increases in production per spindle, the OHS would
increase significantly. This is because operatives such as number of ring frame doffing boys and
the preparatory department operatives would require to be engaged in proportionately larger
numbers to cope with the higher volume of ring spinning production.
5
4662
6262
2357
9672
32464
141898
147054
136001
161912
163746
3.29
4.26
1.73
5.97
19.83
0.33
0.42
0.17
0.59
1.97
Total
55417
157791
35.12
3.48
= 43
35.12
(100 - CPI)
x
100
where CPI is the composite productivity index for the Mill. A negative sign for EOPD means that
fewer number of operatives are being engaged in the Mill as compared to the standard mill.
It is clear from the above formula that the absolute numbers of excess operatives in a
Mill for a given deviation of CPI from 100 will be larger for a coarse count Mill than for a
smaller or fine count Mill.
Thus, for the example considered,
55417
EOPD =
100 - 43
x
= 140
30 x 7.5
100
That is, the Mill engages about 140 operatives more per day than what would be
engaged by the standard mill having the same count pattern as the Mill.
PARTIAL RING FRAME HOK AND OHS
Since nearly two-thirds of the operatives upto spinning in a Mill are engaged in ring
spinning department, it would be useful to calculate HOKs separately (termed partial HOK) for
tenters, doffing boys, and others in this department. The method of calculation is similar to that
followed for working out the HOK for individual departments, and the conversion factors are
given in Table A in Appendix.
Consider that the number of operative hours of 32464 given under ring spinning in
Table 2 has the following break-up according to the category of operatives : tenters including
reserve piecers 16240, doffing boys including sweepers 7436 and others 8788. Then, the
partial HOKs and OHSs would be as set out in Table 5.
Table 5
Partial Ring Frame HOK and OHS
Category
Tenters
Doffing Boys
'Others'
Operative Standardised
Hours
Production
16240
7436
8788
172824
130042
183095
HOK
OHS
9.40
5.72
4.80
0.93
0.57
0.48
=
Working days in the month x installed spindles
The spindle shifts figure used in the above calculation is inclusive of the spindle
shifts stopped due to routine maintenance, cleaning and count change. These stoppages should
not ordinarily be far in excess of 1%. In cases of abnormally large percentage of stoppages due
to these causes, a flat allowance of 1% may be applied. That is, the total worked spindle shifts (8
hours) figure is to be multiplied by 1.01 and the figure arrived at should be taken for SH calculation.
Suppose, in this example, the Mill has an installed spindleage of 28800 and it has
worked for 30 days in the month. Assuming that the spindle shifts (8 hours) figure of 2473201
includes the above categories of stoppages, then the SH figure works out to :
7
2473201 x 8
=
19785608
=
= 22.9
30 x 28800
864000
SH
MPI =
x
Std. Production per Spindle
days in a week
x
24.0
In the above, days in a week is either 6 or 7 depending on whether the Mill is scheduled to work 6 days in a week or 7 days in a week.
Let us assume that the Mill considered in the example worked 7 days a week. Then,
79.37
22.9
MPI =
x
104.77
7
x
24.0
x 100
= 72
If the Mill had adopted 6-day week working instead of 7-day week, then the MPI would be :
79.37
22.9
x
104.77
6
x
24.0
x 100 = 62
7
104.77 g.
=
104.77
Prdn. per spindle conv. factor
for that count
To illustrate, the conversion factor for production per spindle for 72s C is 2.012. Then
the standard production per spindle in 72s C is obtained as follows :
104.77
=
52.07 g.
2.012
Standard total HOK for a count can be obtained from the respective conversion factor
from the relation :
Standard Total HOK in =
a Count
Respective
conv. factor
1.36
1.86
0.55
1.39
6.11
11.27
2.28
2.56
1.27
For the example considered, the 20s converted HOKs corresponding to the 40s converted HOKs arrived at in Tables 4 and 5 are as follows :
Mix & Bl Rm
Cards
Drawing
Fly Frames
Ring Spg.
Total
Spg Tenters
Spg Doffers
Spg Others
10
3.29
4.26
1.73
5.97
19.83
35.12
9.40
5.72
4.80
x
x
x
x
x
x
x
x
x
0.9686
0.9437
0.7525
0.7690
0.6731
0.7519
0.5931
1.0000
0.4745
= 3.19
= 4.02
= 1.30
= 4.59
= 13.35
= 26.41
= 5.58
= 5.72
= 2.28
20s
26s C
2/60s
Nf2/17
Total
Type of
Reeling
SHPR
DHPR
DHPR
DHPR
4966
3720
7857
4390
434
20933
11
= 434 x 8 = 3472
= (4966 x 0.548) + (3720 x 0.689) + (7857 x 0.708) + (4390 x 0.252)
= 11953
3472 x 100
= 29.0
11953
That the reeling HOK as arrived at above can also be obtained from the reeling productivity index is illustrated below. Table 8 gives the standard production per reeler required for
this calculation along with the Mill data with respect to reeled yarn production in different counts.
Table 8
Calculation of No. of Reelers Expected to be
Engaged for Standard Production per Reeler
Count
(1)
20s
26s C
2/60s
Nf 2/17
Total Prodn.
Reeled (kg)
(2)
Std Prodn.
per reeler
per 8 Hrs
for DHPR
(kg.)
(3)
No. of Reeler
shifts (8 hrs)
to be engaged
for Std Prodn.
under (3)
(4)
4966
3720
7857
4390
56.2
44.7
43.5
122.1
88.4
83.2
180.6
36.0
Total
388.2
Column (4) shows the number of reeler shifts of 8 hours that ought to have been
engaged in each count if the reelers had given the standard production per 8 hours. Total of
column (4) (that is, 388.2 in the present example) expressed as a percentage of the reeler shifts of
8 hours actually engaged by the Mill during the month (that is, the figure of 434 given in Table 7) gives
the reeling productivity index for the Mill. Thus, for the example considered :
Reeling
Productivity
Index
x 100
No. of reeler shifts actually
engaged in the month
388.2 x 100
= 89.4
434
12
x 100
Reeling Productivity Index
25.97 x 100
20s
60s
34s SF
2/60s P/V
34s CH
Total
No. of
Winder
Shifts
(8 hrs)
Engaged
Total Cone
Yarn Production (kg.)
405
251
262
194
577
52723
19922
22523
24248
50393
1689
169809
= 163357
13
13512 x 100
=
= 8.3
163357
Alternatively, the above HOK can be worked out from the cone winding productivity
index in a manner similar to that explained for reeling.
The standard production per cone winding operative for the counts in the above example as well as the number of operative shifts expected to be engaged for the cone yarn production shown in Table 9 for the standard production per operative are given in Table 10.
Table 10
Calculation of No. of Operatives Expected to be
Engaged for the Standard Production per Operative
Count
(1)
20s
60s
34s SF
2/60s P/V
34s CHO
Std Prodn
per
Operative
(kg)
(2)
Total
Coned
Yarn
Prdn (kg)
(3)
* No of Operatives
Expected to be
Engaged for Std.
Prodn/Operative
(4)
111.3
86.8
91.4
133.3
91.4
52723
19922
22523
24248
50393
473.7
229.5
246.4
181.9
551.3
Total
1682.8
= 99.6
1689
8.24 x 100
= 8.3
99.6
14
15
APPENDIX
Table A
Conversion Factors for Calculating Standardised Production in Spinning
Cotton Yarns *
Count
Prodn/
Spdle
Mix &
Bl. Rm.
Cards
Drg
Fly
Frames
Ring
Spg
Total
Ring Spinning
Tenters
Doffers Others
5s
6s
6s H
6s C
7s
0.111
0.134
0.126
0.125
0.158
0.95
0.95
0.95
1.13
0.95
0.93
0.93
0.93
1.11
0.93
0.76
0.76
0.76
0.76
0.76
1.25
1.25
1.25
1.14
1.25
0.49
0.46
0.44
0.44
0.50
0.70
0.68
0.67
0.69
0.70
0.56
0.45
0.42
0.42
0.53
0.75
0.75
0.75
0.75
0.75
0.16
0.19
0.18
0.18
0.23
8s
8s H
8s CH
9s
9s CH
0.164
0.152
0.135
0.194
0.158
0.95
0.95
1.13
0.95
1.13
0.93
0.93
1.11
0.93
1.11
0.76
0.76
0.76
0.76
0.76
1.25
1.25
1.14
1.25
1.14
0.51
0.49
0.46
0.57
0.50
0.71
0.70
0.70
0.74
0.73
0.55
0.51
0.45
0.65
0.53
0.75
0.75
0.75
0.75
0.75
0.23
0.22
0.19
0.28
0.23
10s
10s H
10s C
10s CH
12s
0.197
0.182
0.186
0.162
0.235
0.95
0.95
1.13
1.13
0.95
0.92
0.92
1.10
1.10
0.92
0.76
0.76
0.76
0.76
0.76
1.24
1.24
1.13
1.13
1.23
0.50
0.48
0.49
0.45
0.56
0.70
0.69
0.72
0.70
0.73
0.49
0.46
0.47
0.41
0.59
0.75
0.75
0.75
0.75
0.75
0.28
0.26
0.27
0.23
0.34
12s
12s
12s
13s
14s
H
C
CH
CH
0.216
0.222
0.193
0.216
0.274
0.95
1.13
1.13
1.13
0.95
0.92
1.10
1.10
1.10
0.92
0.76
0.76
0.76
0.76
0.76
1.23
1.13
1.13
1.13
1.23
0.53
0.54
0.50
0.53
0.62
0.72
0.75
0.72
0.74
0.77
0.54
0.55
0.48
0.54
0.68
0.75
0.75
0.75
0.75
0.75
0.31
0.32
0.28
0.31
0.39
14s
14s
14s
14s
15s
H
HT
C
CH
0.250
0.544
0.258
0.223
0.302
0.95
0.95
1.13
1.13
0.95
0.92
0.92
1.10
1.10
0.92
0.76
0.76
0.76
0.76
0.76
1.23
1.23
1.13
1.13
1.23
0.58
1.02
0.59
0.54
0.66
0.75
1.01
0.78
0.75
0.79
0.63
1.36
0.65
0.56
0.75
0.75
0.75
0.75
0.75
0.75
0.36
0.78
0.37
0.32
0.43
15s
16s
16s
16s
16s
CH
H
C
CH
0.246
0.331
0.302
0.305
0.269
1.13
0.97
0.97
1.16
1.16
1.10
0.95
0.95
1.13
1.13
0.76
0.76
0.76
0.76
0.76
1.13
1.23
1.23
1.13
1.13
0.57
0.63
0.59
0.60
0.55
0.77
0.78
0.76
0.79
0.77
0.61
0.66
0.60
0.61
0.54
0.75
0.75
0.75
0.75
0.75
0.35
0.47
0.43
0.44
0.38
17s
17s HT
18s
18s H
18s C
0.360
0.724
0.379
0.346
0.350
0.97
0.97
0.97
0.97
1.16
0.95
0.95
0.95
0.95
1.13
0.76
0.76
0.76
0.76
0.76
1.23
1.23
0.77
0.77
0.73
0.67
1.13
0.69
0.65
0.65
0.81
1.08
0.76
0.74
0.78
0.72
1.45
0.76
0.69
0.70
0.75
0.75
0.75
0.75
0.75
0.51
1.03
0.54
0.49
0.50
* The above factors are for Market Yarn. Same Factors to be used also for warp/weft yarns produced in composite mills.
H: Hosiery; HT: High Twist; C: Combed; CH: Combed Hosiery; CHT: Combed High Twist.
16
APPENDIX
Table A (contd.)
Conversion Factors for Calculating Standardised Production in Spinning
Cotton Yarns *
Count
Prodn/
Spdle
Mix &
Bl. Rm.
Cards
Drg
Fly
Frames
Ring
Spg
Total
18s CH
19s
19s H
19s C
20s
0.308
0.411
0.373
0.359
0.415
1.16
0.97
0.97
1.16
0.97
1.13
0.95
0.95
1.13
0.94
0.76
0.76
0.76
0.76
0.75
0.73
0.77
0.77
0.73
0.77
0.60
0.73
0.68
0.67
0.67
0.75
0.79
0.76
0.79
0.75
Tenters
0.62
0.82
0.75
0.72
0.59
20s
20s
20s
20s
21s
H
HT
C
CH
0.368
0.829
0.364
0.338
0.444
0.97
0.97
1.15
1.15
0.97
0.94
0.94
1.12
1.12
0.94
0.75
0.75
0.75
0.75
0.75
0.77
0.77
0.73
0.73
0.77
0.63
1.06
0.62
0.60
0.70
0.73
0.99
0.76
0.74
0.77
0.53
1.18
0.52
0.48
0.63
1.00
1.00
1.00
1.00
1.00
0.42
0.95
0.42
0.39
0.51
21s
21s
22s
22s
22s
H
C
C
CH
0.394
0.391
0.476
0.417
0.388
0.97
1.15
0.97
1.15
1.15
0.94
1.12
0.94
1.12
1.12
0.75
0.75
0.75
0.75
0.75
0.77
0.73
0.77
0.73
0.73
0.65
0.65
0.73
0.67
0.65
0.74
0.77
0.79
0.79
0.77
0.56
0.56
0.68
0.60
0.55
1.00
1.00
1.00
1.00
1.00
0.45
0.45
0.54
0.48
0.44
23s
23s H
23s C
23s CH
24s
0.506
0.449
0.446
0.412
0.523
0.97
0.97
1.15
1.15
0.97
0.94
0.94
1.12
1.12
0.94
0.75
0.75
0.75
0.75
0.80
0.77
0.77
0.73
0.73
0.82
0.76
0.71
0.70
0.67
0.77
0.80
0.77
0.81
0.79
0.82
0.72
0.64
0.64
0.59
0.75
1.00
1.00
1.00
1.00
1.00
0.58
0.51
0.51
0.47
0.60
24s
24s
24s
25s
25s
H
C
CH
0.464
0.458
0.425
0.556
0.493
0.97
1.15
1.15
0.97
0.97
0.94
1.12
1.12
0.94
0.94
0.80
0.74
0.74
0.80
0.80
0.82
0.75
0.75
0.82
0.82
0.72
0.71
0.68
0.81
0.75
0.79
0.82
0.80
0.84
0.80
0.66
0.65
0.61
0.79
0.70
1.00
1.00
1.00
1.00
1.00
0.53
0.52
0.49
0.64
0.56
25s
26s
26s
26s
26s
CH
H
C
CH
0.452
0.586
0.520
0.517
0.477
1.15
1.00
1.00
1.19
1.19
1.12
0.97
0.97
1.16
1.16
0.74
0.80
0.80
0.74
0.74
0.75
0.82
0.82
0.75
0.75
0.71
0.83
0.77
0.77
0.73
0.81
0.86
0.83
0.86
0.83
0.65
0.84
0.74
0.74
0.68
1.00
1.00
1.00
1.00
1.00
0.52
0.67
0.59
0.59
0.55
27s
27s H
27s CH
28s
28s H
0.620
0.550
0.505
0.655
0.581
1.00
1.00
1.19
1.00
1.00
0.97
0.97
1.16
0.97
0.97
0.80
0.80
0.74
0.86
0.86
0.82
0.82
0.75
0.88
0.88
0.82
0.76
0.72
0.85
0.79
0.85
0.82
0.83
0.88
0.84
0.78
0.69
0.63
0.82
0.73
1.00
1.00
1.00
1.00
1.00
0.71
0.63
0.58
0.75
0.66
Ring Spinning
Doffers Others
0.75
0.44
0.75
0.59
0.75
0.53
0.75
0.51
1.00
0.47
* The above factors are for Market Yarn. Same Factors to be used also for warp/weft yarns produced in composite mills.
H: Hosiery; HT: High Twist; C: Combed; CH: Combed Hosiery; CHT: Combed High Twist.
17
28s C
28s CH
29s
30s
30s H
APPENDIX
Table A (contd.)
Conversion Factors for Calculating Standardised Production in Spinning
Cotton Yarns *
Prodn/ Mix & Cards
Drg
Fly
Ring
Total
Ring Spinning
Spdle Bl. Rm.
Frames
Spg
Tenters Doffers Others
0.574
1.19
1.16
0.80
0.81
0.78
0.87
0.72
1.00
0.66
0.533
1.19
1.16
0.80
0.81
0.74
0.85
0.67
1.00
0.61
0.690
1.00
0.97
0.86
0.88
0.88
0.90
0.86
1.00
0.79
0.684
1.00
0.97
0.86
0.88
0.87
0.90
0.85
1.00
0.78
0.586
1.00
0.97
0.86
0.88
0.79
0.85
0.73
1.00
0.67
30s
30s
31s
31s
31s
C
CH
0.601
0.538
0.710
0.616
0.631
1.19
1.19
1.00
1.00
1.19
1.16
1.16
0.97
0.97
1.16
0.80
0.80
0.86
0.86
0.80
0.81
0.81
0.88
0.88
0.81
0.80
0.75
0.90
0.82
0.83
0.89
0.85
0.91
0.86
0.90
0.75
0.67
0.89
0.77
0.79
1.00
1.00
1.00
1.00
1.00
0.69
0.61
0.81
0.70
0.72
31s
32s
32s
32s
32s
CH
0.565
0.741
0.646
0.658
0.593
1.19
1.00
1.00
1.19
1.19
1.16
0.97
0.97
1.16
1.16
0.80
0.94
0.94
0.89
0.89
0.81
0.95
0.95
0.85
0.85
0.77
0.92
0.84
0.85
0.80
0.87
0.94
0.89
0.93
0.89
0.71
0.93
0.81
0.82
0.74
1.00
1.00
1.00
1.00
1.00
0.65
0.85
0.74
0.75
0.68
33s
33s C
34s
34s H
34s C
0.776
0.689
0.811
0.684
0.721
1.00
1.19
1.00
1.00
1.19
0.97
1.16
0.97
0.97
1.16
0.94
0.89
0.94
0.94
0.89
0.95
0.85
0.95
0.95
0.85
0.95
0.88
0.98
0.87
0.91
0.96
0.94
0.98
0.91
0.96
0.97
0.86
1.01
0.86
0.90
1.00
1.00
1.00
1.00
1.00
0.89
0.79
0.93
0.78
0.82
34s CH
35s
35s C
35s CH
36s
0.646
0.847
0.753
0.674
0.884
1.19
1.00
1.19
1.19
1.00
1.16
0.97
1.16
1.16
1.00
0.89
0.94
0.89
0.89
0.94
0.85
0.95
0.85
0.85
0.95
0.84
1.02
0.93
0.87
0.92
0.92
1.00
0.98
0.93
0.94
0.81
1.06
0.94
0.84
0.88
1.00
1.00
1.00
1.00
1.00
0.74
0.97
0.86
0.77
0.88
36s
36s
36s
37s
37s
H
C
CH
0.745
0.785
0.703
0.895
0.754
1.00
1.19
1.19
1.00
1.00
1.00
1.19
1.19
1.00
1.00
0.94
0.89
0.89
0.94
0.94
0.95
0.85
0.85
0.95
0.95
0.82
0.85
0.79
0.92
0.82
0.88
0.93
0.89
0.95
0.88
0.75
0.79
0.70
0.89
0.75
1.00
1.00
1.00
1.00
1.00
0.75
0.79
0.70
0.89
0.75
37s
37s
38s
38s
38s
C
CH
0.795
0.712
0.931
0.785
1.408
1.19
1.19
1.00
1.00
1.00
1.19
1.19
1.00
1.00
1.00
0.89
0.89
1.00
1.00
1.00
0.85
0.85
1.00
1.00
1.00
0.85
0.79
0.95
0.85
1.29
0.93
0.89
0.97
0.91
1.18
0.80
0.71
0.93
0.78
1.41
1.00
1.00
1.00
1.00
1.00
0.80
0.71
0.93
0.78
1.41
Count
H
C
H
C
CH
H
HT
* The above factors are for Market Yarn. Same Factors to be used also for warp/weft yarns produced in composite mills.
H: Hosiery; HT: High Twist; C: Combed; CH: Combed Hosiery; CHT: Combed High Twist.
18
Count
38s
38s
39s
39s
39s
C
CH
39s
40s
40s
40s
40s
CH
APPENDIX
Table A (contd.)
Conversion Factors for Calculating Standardised Production in Spinning
Cotton Yarns *
Prodn/ Mix & Cards
Drg
Fly
Ring
Total
Ring Spinning
Spdle Bl. Rm.
Frames
Spg
Tenters Doffers Others
0.828
0.741
0.963
0.816
0.856
1.19
1.19
1.00
1.00
1.19
1.19
1.19
1.00
1.00
1.19
0.94
0.94
1.00
1.00
0.94
1.01
1.01
1.00
1.00
1.01
0.88
0.81
0.97
0.87
0.90
0.97
0.93
0.98
0.92
0.98
0.83
0.74
0.96
0.82
0.86
1.00
1.00
1.00
1.00
1.00
0.83
0.74
0.96
0.82
0.86
0.771
1.000
0.847
1.521
0.865
1.19
1.00
1.00
1.00
1.19
1.19
1.00
1.00
1.00
1.19
0.94
1.00
1.00
1.00
0.94
1.01
1.00
1.00
1.00
1.01
0.84
1.00
0.89
1.37
0.90
0.94
1.00
0.93
1.23
0.98
0.77
1.00
0.85
1.52
0.87
1.00
1.00
1.00
1.00
1.00
0.77
1.00
0.85
1.52
0.87
40s CH
40s CHT
41s
41s C
42s
0.756
1.439
1.038
0.898
1.076
1.19
1.19
1.00
1.19
1.00
1.19
1.19
1.00
1.19
1.00
0.94
0.94
1.00
0.94
1.00
1.01
1.01
1.00
1.01
1.00
0.82
1.31
1.03
0.93
1.05
0.93
1.23
1.02
1.00
1.03
0.76
1.44
1.04
0.90
1.08
1.00
1.00
1.00
1.00
1.00
0.76
1.44
1.04
0.90
1.08
42s
42s
42s
43s
43s
H
C
CH
0.907
0.931
0.809
1.114
0.964
1.00
1.19
1.19
1.00
1.19
1.00
1.19
1.19
1.00
1.19
1.00
0.94
0.94
1.00
0.94
1.00
1.01
1.01
1.00
1.01
0.93
0.95
0.86
1.08
0.97
0.96
1.01
0.96
1.05
1.03
0.91
0.93
0.81
1.11
0.96
1.00
1.00
1.00
1.00
1.00
0.91
0.93
0.81
1.11
0.96
43s
43s
44s
44s
44s
CH
CHT
C
CH
0.838
1.603
1.154
0.998
0.867
1.19
1.19
1.00
1.19
1.19
1.19
1.19
1.00
1.19
1.19
0.94
0.94
1.00
0.94
0.94
1.01
1.01
1.11
1.01
1.01
0.88
1.43
1.11
1.00
0.90
0.97
1.30
1.08
1.04
0.98
0.84
1.60
1.15
1.00
0.87
1.00
1.00
1.00
1.00
1.00
0.84
1.60
1.15
1.00
0.87
45s
45s CH
46s
46s C
47s
1.193
0.897
1.233
1.067
1.252
1.00
1.19
1.00
1.19
1.00
1.00
1.19
1.00
1.19
1.00
1.00
0.94
1.00
0.94
1.00
1.11
1.01
1.11
1.01
1.11
1.14
0.93
1.17
1.05
1.18
1.10
1.00
1.11
1.07
1.12
1.19
0.90
1.23
1.07
1.25
1.00
1.00
1.00
1.00
1.00
1.19
0.90
1.23
1.07
1.25
47s
48s
48s
48s
49s
1.102
1.292
1.137
0.988
1.019
1.19
1.00
1.19
1.19
1.19
1.19
1.00
1.19
1.19
1.19
0.94
1.03
0.97
0.97
0.97
1.01
1.17
1.08
1.08
1.08
1.07
1.21
1.10
0.99
1.01
1.09
1.15
1.11
1.05
1.06
1.10
1.29
1.14
0.99
1.02
1.00
1.00
1.00
1.00
1.00
1.10
1.29
1.14
0.99
1.02
H
C
H
HT
C
C
C
CH
CH
* The above factors are for Market Yarn. Same Factors to be used also for warp/weft yarns produced in composite mills.
H: Hosiery; HT: High Twist; C: Combed; CH: Combed Hosiery; CHT: Combed High Twist.
19
Count
50s
50s
50s
50s
51s
APPENDIX
Table A (contd.)
Conversion Factors for Calculating Standardised Production in Spinning
Cotton Yarns *
Prodn/ Mix & Cards
Drg
Fly
Ring
Total
Ring Spinning
Spdle Bl. Rm.
Frames
Spg
Tenters Doffers Others
1.342
1.171
1.022
1.752
1.206
1.04
1.23
1.23
1.23
1.23
1.07
1.27
1.27
1.27
1.27
1.03
0.97
0.97
0.97
0.97
1.17
1.08
1.08
1.08
1.08
1.25
1.12
1.02
1.54
1.15
1.18
1.14
1.07
1.39
1.16
1.34
1.17
1.02
1.75
1.21
1.00
1.00
1.00
1.00
1.00
1.34
1.17
1.02
1.75
1.21
C
CH
CH
1.053
1.424
1.242
1.078
1.109
1.23
1.04
1.23
1.23
1.23
1.27
1.07
1.27
1.27
1.27
0.97
1.03
0.97
0.97
0.97
1.08
1.17
1.08
1.08
1.08
1.04
1.30
1.17
1.06
1.08
1.09
1.22
1.17
1.10
1.11
1.05
1.42
1.24
1.08
1.11
1.00
1.00
1.00
1.00
1.00
1.05
1.42
1.24
1.08
1.11
54s
54s C
54s CH
55s
55s C
1.506
1.314
1.141
1.505
1.351
1.04
1.23
1.23
1.04
1.23
1.07
1.27
1.27
1.07
1.27
1.16
1.10
1.10
1.16
1.10
1.28
1.17
1.17
1.28
1.17
1.36
1.23
1.10
1.36
1.25
1.27
1.22
1.14
1.27
1.23
1.51
1.31
1.14
1.51
1.35
1.00
1.00
1.00
1.00
1.00
1.51
1.31
1.14
1.51
1.35
55s
55s
56s
56s
56s
CH
CHT
1.173
2.010
1.538
1.388
1.205
1.23
1.23
1.04
1.23
1.23
1.27
1.27
1.07
1.27
1.27
1.10
1.10
1.16
1.10
1.10
1.17
1.17
1.28
1.17
1.17
1.12
1.72
1.39
1.28
1.15
1.16
1.52
1.29
1.25
1.17
1.17
2.01
1.54
1.39
1.20
1.00
1.00
1.00
1.00
1.00
1.17
2.01
1.54
1.39
1.20
56s
57s
58s
58s
58s
CHT
C
2.065
1.425
1.622
1.463
1.270
1.23
1.23
1.04
1.23
1.23
1.27
1.27
1.07
1.27
1.27
1.10
1.10
1.16
1.10
1.10
1.17
1.17
1.30
1.24
1.24
1.76
1.31
1.45
1.33
1.19
1.55
1.27
1.33
1.29
1.21
2.06
1.43
1.62
1.46
1.27
1.00
1.00
1.00
1.00
1.00
2.06
1.43
1.62
1.46
1.27
59s
59s
60s
60s
60s
C
CH
1.501
1.303
1.706
1.496
2.417
1.23
1.23
1.04
1.04
1.04
1.27
1.27
1.07
1.07
1.07
1.10
1.10
1.16
1.16
1.16
1.24
1.24
1.30
1.30
1.30
1.36
1.22
1.39
1.25
1.85
1.31
1.22
1.29
1.21
1.57
1.50
1.30
1.42
1.25
2.01
1.00
1.00
1.00
1.00
1.00
1.50
1.30
1.71
1.50
2.42
60s
60s
60s
61s
62s
C
CH
CHT
C
1.539
1.337
2.290
1.578
1.792
1.23
1.23
1.23
1.23
1.04
1.27
1.27
1.27
1.27
1.07
1.10
1.10
1.10
1.10
1.16
1.24
1.24
1.24
1.24
1.30
1.28
1.15
1.76
1.24
1.37
1.26
1.18
1.55
1.23
1.28
1.28
1.11
1.91
1.31
1.49
1.00
1.00
1.00
1.00
1.00
1.54
1.34
2.29
1.35
1.54
51s
52s
52s
52s
53s
C
CH
CHT
C
CH
C
CH
C
CH
H
HT
* The above factors are for Market Yarn. Same Factors to be used also for warp/weft yarns produced in composite mills.
H: Hosiery; HT: High Twist; C: Combed; CH: Combed Hosiery; CHT: Combed High Twist.
20
Count
62s
62s
62s
63s
63s
HT
C
CH
APPENDIX
Table A (contd.)
Conversion Factors for Calculating Standardised Production in Spinning
Cotton Yarns *
Prodn/ Mix & Cards
Drg
Fly
Ring
Total
Ring Spinning
Spdle Bl. Rm.
Frames
Spg
Tenters Doffers Others
2.539
1.617
1.404
1.836
1.656
1.04
1.23
1.23
1.04
1.23
1.07
1.27
1.27
1.07
1.27
1.16
1.10
1.10
1.16
1.10
1.30
1.24
1.24
1.30
1.24
1.82
1.26
1.13
1.39
1.28
1.55
1.25
1.17
1.29
1.26
2.12
1.35
1.17
1.53
1.38
1.00
1.00
1.00
1.00
1.00
2.18
1.39
1.20
1.57
1.42
63s CH
64s
64s C
64s CH
65s
1.438
1.879
1.696
1.472
1.924
1.23
1.04
1.23
1.23
1.04
1.27
1.07
1.27
1.27
1.07
1.10
1.21
1.10
1.10
1.21
1.24
1.45
1.27
1.27
1.45
1.15
1.42
1.31
1.17
1.45
1.18
1.33
1.28
1.20
1.35
1.20
1.57
1.41
1.23
1.60
1.00
1.00
1.00
1.00
1.00
1.23
1.61
1.45
1.26
1.65
66s
66s
66s
67s
67s
1.968
1.776
1.542
1.816
1.577
1.04
1.23
1.23
1.23
1.23
1.07
1.27
1.27
1.27
1.27
1.21
1.10
1.10
1.10
1.10
1.45
1.27
1.27
1.27
1.27
1.47
1.36
1.22
1.38
1.24
1.36
1.31
1.22
1.33
1.24
1.64
1.48
1.28
1.51
1.31
1.00
1.00
1.00
1.00
1.00
1.69
1.52
1.32
1.56
1.35
1.857
1.613
2.150
1.929
1.675
1.23
1.23
1.04
1.23
1.23
1.27
1.27
1.07
1.27
1.27
1.10
1.10
1.21
1.10
1.10
1.27
1.27
1.50
1.35
1.35
1.41
1.26
1.58
1.45
1.30
1.34
1.25
1.44
1.38
1.28
1.55
1.34
1.79
1.61
1.40
1.00
1.00
1.00
1.00
1.00
1.59
1.38
1.84
1.65
1.44
C
C
CH
1.711
2.243
2.012
2.055
1.784
1.23
1.08
1.28
1.28
1.28
1.27
1.17
1.40
1.40
1.40
1.10
1.21
1.10
1.10
1.10
1.35
1.50
1.35
1.35
1.35
1.32
1.64
1.50
1.53
1.36
1.30
1.49
1.43
1.44
1.34
1.43
1.87
1.68
1.71
1.49
1.00
1.00
1.00
1.00
1.00
1.47
1.92
1.72
1.76
1.53
74s
74s C
74s CH
75s
75s CH
2.337
2.097
1.821
2.384
1.857
1.08
1.28
1.28
1.08
1.28
1.17
1.40
1.40
1.17
1.40
1.21
1.10
1.10
1.21
1.10
1.50
1.35
1.35
1.50
1.35
1.70
1.55
1.38
1.72
1.41
1.52
1.46
1.36
1.54
1.37
1.95
1.75
1.52
1.99
1.55
1.00
1.00
1.00
1.00
1.00
2.00
1.80
1.56
2.04
1.59
76s
76s
77s
77s
78s
2.432
2.182
2.226
1.932
2.269
1.08
1.28
1.28
1.28
1.28
1.17
1.40
1.40
1.40
1.40
1.21
1.10
1.10
1.10
1.10
1.50
1.35
1.35
1.35
1.35
1.75
1.60
1.63
1.45
1.66
1.56
1.49
1.51
1.40
1.52
2.03
1.82
1.85
1.61
1.89
1.00
1.00
1.00
1.00
1.00
2.08
1.87
1.91
1.66
1.95
C
CH
C
CH
68s
68s
70s
70s
70s
C
CH
71s
72s
72s
73s
73s
CH
C
CH
C
C
CH
C
* The above factors are for Market Yarn. Same Factors to be used also for warp/weft yarns produced in composite mills.
H: Hosiery; HT: High Twist; C: Combed; CH: Combed Hosiery; CHT: Combed High Twist.
21
APPENDIX
Table A (contd.)
Conversion Factors for Calculating Standardised Production in Spinning
Cotton Yarns *
Count
Prodn/
Spdle
Mix &
Bl. Rm.
Cards
Drg
Fly
Frames
Ring
Spg
Total
Ring Spinning
1.970
2.313
2.008
2.416
2.239
1.28
1.28
1.28
1.08
1.28
1.40
1.40
1.40
1.17
1.40
1.10
1.10
1.10
1.24
1.13
1.35
1.35
1.35
1.66
1.57
1.47
1.68
1.50
1.74
1.64
1.41
1.54
1.43
1.57
1.54
Tenters
1.64
1.93
1.67
2.01
1.87
1.942
2.281
1.978
2.507
2.324
1.28
1.28
1.28
1.08
1.28
1.40
1.40
1.40
1.17
1.40
1.13
1.13
1.13
1.24
1.13
1.57
1.57
1.57
1.66
1.57
1.46
1.66
1.48
1.80
1.69
1.43
1.56
1.44
1.61
1.57
1.62
1.90
1.65
2.09
1.94
1.00
1.00
1.00
1.00
1.00
1.66
1.96
1.70
2.15
1.99
C
CH
CH
2.015
2.600
2.409
2.089
2.127
1.28
1.08
1.28
1.28
1.28
1.40
1.17
1.40
1.40
1.40
1.13
1.24
1.13
1.13
1.13
1.57
1.66
1.57
1.57
1.57
1.50
1.86
1.74
1.55
1.57
1.46
1.64
1.60
1.48
1.50
1.68
2.17
2.01
1.74
1.77
1.00
1.00
1.00
1.00
1.00
1.73
2.23
2.06
1.79
1.82
86s
86s
87s
88s
88s
C
CH
CH
C
CH
2.495
2.164
2.202
2.583
2.240
1.28
1.28
1.28
1.28
1.28
1.40
1.40
1.40
1.40
1.40
1.13
1.13
1.13
1.13
1.13
1.66
1.66
1.66
1.66
1.66
1.79
1.59
1.61
1.85
1.64
1.64
1.52
1.54
1.68
1.55
2.08
1.80
1.83
2.15
1.87
1.00
1.00
1.00
1.00
1.00
2.14
1.85
1.89
2.21
1.92
89s
89s
90s
90s
90s
C
CH
C
CH
2.628
2.279
2.883
2.672
2.317
1.28
1.28
1.08
1.28
1.28
1.40
1.40
1.35
1.61
1.61
1.13
1.13
1.30
1.13
1.13
1.66
1.66
1.81
1.66
1.66
1.87
1.66
2.03
1.90
1.68
1.69
1.57
1.79
1.74
1.61
2.19
1.90
2.40
2.23
1.93
1.00
1.00
1.00
1.00
1.00
2.25
1.95
2.47
2.29
1.99
91s
91s
92s
92s
92s
C
CH
C
CH
CHT
2.717
2.355
2.762
2.394
4.106
1.28
1.28
1.28
1.28
1.28
1.61
1.61
1.61
1.61
1.61
1.13
1.13
1.13
1.13
1.13
1.66
1.66
1.66
1.66
1.66
1.93
1.71
1.95
1.73
2.77
1.75
1.62
1.77
1.64
2.26
2.26
1.96
2.30
2.00
3.42
1.00
1.00
1.00
1.00
1.00
2.33
2.02
2.37
2.05
3.52
93s
93s
94s
94s
94s
C
CH
2.806
2.434
3.077
2.852
2.473
1.28
1.28
1.08
1.28
1.28
1.61
1.61
1.35
1.61
1.61
1.13
1.13
1.30
1.13
1.13
1.66
1.66
1.81
1.66
1.66
1.98
1.75
2.14
2.01
1.78
1.79
1.65
1.86
1.80
1.66
2.34
2.03
2.56
2.38
2.06
1.00
1.00
1.00
1.00
1.00
2.41
2.09
2.64
2.44
2.12
78s
79s
79s
80s
80s
CH
C
CH
80s
81s
81s
82s
82s
CH
C
CH
82s
84s
84s
84s
85s
CH
C
CH
Doffers Others
1.00
1.69
1.00
1.98
1.00
1.72
1.00
2.07
1.00
1.92
* The above factors are for Market Yarn. Same Factors to be used also for warp/weft yarns produced in composite mills.
H: Hosiery; HT: High Twist; C: Combed; CH: Combed Hosiery; CHT: Combed High Twist.
22
APPENDIX
Table A (contd.)
Conversion Factors for Calculating Standardised Production in Spinning
Cotton Yarns *
Count
Prodn/
Spdle
Mix &
Bl. Rm.
Cards
Drg
Fly
Frames
Ring
Spg
Total
Ring Spinning
Tenters
95s
95s
95s
96s
96s
C
CH
C
CH
Doffers Others
3.126
2.898
2.513
2.943
2.552
1.08
1.28
1.28
1.28
1.28
1.35
1.61
1.61
1.61
1.61
1.30
1.13
1.13
1.14
1.14
1.81
1.66
1.66
1.77
1.77
2.17
2.04
1.80
2.06
1.83
1.88
1.82
1.68
1.85
1.71
2.61
2.41
2.09
2.45
2.13
1.00
1.00
1.00
1.00
1.00
2.68
2.48
2.15
2.52
2.19
4.377
2.990
2.593
3.276
3.036
1.28
1.28
1.28
1.08
1.28
1.61
1.61
1.61
1.35
1.61
1.14
1.14
1.14
1.31
1.14
1.77
1.77
1.77
1.93
1.77
2.93
2.09
1.85
2.26
2.12
2.38
1.87
1.72
1.95
1.88
3.65
2.49
2.16
2.73
2.53
1.00
1.00
1.00
1.00
1.00
3.75
2.56
2.22
2.81
2.60
1.28
1.28
1.08
1.28
1.28
1.61
1.61
1.35
1.61
1.61
1.14
1.14
1.31
1.14
1.14
1.77
1.77
1.93
1.77
1.77
1.88
1.90
2.32
2.18
1.92
1.74
1.75
1.98
1.92
1.77
2.19
2.23
2.81
2.61
2.26
1.00
1.00
1.00
1.00
1.00
2.26
2.29
2.89
2.68
2.33
96s
97s
97s
98s
98s
CHT
C
CH
98s
99s
100s
100s
100s
CH
CH
C
CH
2.633
2.673
3.376
3.129
2.714
100s
102s
102s
103s
104s
CHT
C
CH
C
C
4.653
3.224
2.796
3.272
3.319
1.28
1.28
1.28
1.28
1.28
1.61
1.61
1.61
1.61
1.61
1.14
1.14
1.14
1.14
1.14
1.77
1.77
1.77
1.77
1.77
3.10
2.23
1.97
2.26
2.29
2.48
1.95
1.80
1.97
1.99
3.88
2.69
2.33
2.73
2.77
1.00
1.00
1.00
1.00
1.00
3.99
2.76
2.40
2.80
2.84
105s
105s
107s
108s
110s
C
CHT
C
C
C
3.367
5.007
3.464
3.512
3.610
1.28
1.28
1.28
1.28
1.28
1.61
1.61
1.61
1.61
1.85
1.14
1.14
1.14
1.14
1.20
1.77
1.77
1.77
1.77
1.85
2.32
3.31
2.38
2.41
2.47
2.01
2.61
2.04
2.06
2.14
2.81
4.17
2.89
2.93
3.01
1.00
1.00
1.00
1.00
1.00
2.89
4.29
2.97
3.01
3.09
112s
114s
115s
120s
120s
C
C
C
C
CH
3.709
3.809
3.860
4.114
3.568
1.28
1.28
1.28
1.28
1.28
1.85
1.85
1.85
1.85
1.85
1.20
1.20
1.20
1.20
1.20
1.85
1.85
1.85
1.85
1.85
2.53
2.59
2.62
2.77
2.44
2.17
2.21
2.23
2.32
2.12
3.09
3.17
3.22
3.43
2.97
1.00
1.00
1.00
1.00
1.00
3.18
3.26
3.31
3.53
3.06
124s
130s
132s
140s
160s
C
C
C
C
C
4.321
5.479
5.606
6.123
8.550
1.28
1.28
1.28
1.28
1.28
1.85
1.85
1.85
1.85
1.85
1.20
1.20
1.20
1.20
1.20
1.85
1.85
1.85
1.85
1.85
2.90
3.60
3.67
3.99
5.45
2.40
2.82
2.87
3.06
3.95
3.60
4.57
4.67
5.10
7.13
1.00
1.00
1.00
1.00
1.00
3.70
4.70
4.80
5.25
7.33
* The above factors are for Market Yarn. Same Factors to be used also for warp/weft yarns produced in composite mills.
H: Hosiery; HT: High Twist; C: Combed; CH: Combed Hosiery; CHT: Combed High Twist.
23
APPENDIX
Table A (contd.)
Conversion Factors for Calculating Standardised Production in Spinning
Viscose Staple Fibre Yarns
Count
Prodn/
Spdle
Mix &
Bl. Rm.
Cards
Drg
Fly
Frames
Ring
Spg
Total
Ring Spinning
Tenters
10s
12s
15s
16s
18s
0.150
0.193
0.244
0.268
0.318
1.54
1.54
1.54
1.54
1.54
0.91
0.91
0.91
0.94
0.94
0.83
0.83
0.83
0.83
0.83
0.72
0.72
0.72
0.72
0.75
0.32
0.36
0.40
0.42
0.47
0.59
0.61
0.64
0.65
0.68
0.15
0.19
0.24
0.27
0.32
0.70
0.70
0.70
0.70
0.70
0.21
0.28
0.35
0.38
0.45
20s
24s
26s
28s
30s
0.322
0.419
0.470
0.525
0.560
1.54
1.54
1.54
1.54
1.54
0.94
0.94
0.97
0.97
0.97
0.83
0.88
0.88
0.95
0.95
0.70
0.70
0.68
0.68
0.68
0.51
0.58
0.62
0.66
0.66
0.70
0.75
0.77
0.80
0.80
0.32
0.42
0.47
0.53
0.51
0.92
0.92
0.92
0.92
0.92
0.37
0.48
0.54
0.60
0.64
31s
32s
34s
35s
36s
0.588
0.617
0.674
0.704
0.730
1.54
1.54
1.54
1.54
1.54
0.97
0.97
0.97
0.97
1.00
0.95
1.04
1.04
1.04
1.04
0.68
0.68
0.68
0.68
0.68
0.69
0.71
0.75
0.77
0.76
0.82
0.83
0.86
0.87
0.87
0.53
0.56
0.61
0.64
0.66
0.92
0.92
0.92
0.92
0.92
0.67
0.70
0.77
0.80
0.73
39s
40s
42s
45s
50s
0.824
0.829
0.892
0.984
1.152
1.54
1.54
1.54
1.54
1.54
1.00
1.00
1.00
1.00
1.06
1.10
1.10
1.10
1.10
1.14
0.77
0.77
0.77
0.90
0.94
0.82
0.82
0.87
0.90
1.01
0.92
0.92
0.95
0.98
1.06
0.75
0.75
0.81
0.82
0.96
0.92
0.92
0.92
0.92
0.92
0.82
0.83
0.89
0.98
1.15
50s HT
53s HT
60s
60s HT
62s
1.848
2.017
1.514
2.415
1.582
1.54
1.54
1.54
1.54
1.54
1.06
1.06
1.06
1.06
1.06
1.14
1.14
1.15
1.15
1.15
0.94
0.94
1.09
1.09
1.09
1.46
1.57
1.24
1.82
1.22
1.34
1.40
1.22
1.58
1.21
1.54
1.68
1.26
2.01
1.32
0.92
0.92
0.92
0.92
0.92
1.85
2.02
1.51
2.42
1.36
65s HT
70s HT
76s HT
80s
2.723
3.043
3.443
2.319
1.54
1.54
1.54
1.54
1.06
1.06
1.17
1.17
1.21
1.21
1.21
1.23
1.22
1.31
1.31
1.52
1.91
2.10
2.34
1.66
1.64
1.77
1.93
1.55
2.27
2.54
2.87
1.93
0.92
0.92
0.92
0.92
2.33
2.61
2.95
1.99
24
Doffers Others
APPENDIX
Table A (contd.)
Conversion Factors for Calculating Standardised Production in Spinning
100% Polyester Yarns
Count
Prodn/
Spdle
Mix &
Bl. Rm.
Cards
Drg
Fly
Frames
Ring
Spg
Total
Ring Spinning
4s
6s
8s
10s
12s
0.062
0.084
0.123
0.166
0.188
1.18
1.18
1.18
1.18
1.18
0.90
0.90
0.90
0.90
0.90
0.92
0.92
0.92
0.92
0.92
0.83
0.83
0.83
0.83
0.83
0.26
0.28
0.32
0.35
0.37
0.53
0.54
0.56
0.59
0.60
Tenters
0.06
0.08
0.12
0.17
0.19
14s
15s
16s
18s
18s HT
0.233
0.257
0.252
0.297
0.483
1.18
1.18
1.18
1.18
1.18
0.90
0.90
0.93
0.93
0.93
0.92
0.92
0.92
0.92
0.92
0.83
0.83
0.83
0.69
0.69
0.41
0.43
0.42
0.46
0.62
0.62
0.63
0.63
0.64
0.74
0.23
0.26
0.25
0.30
0.48
0.75
0.75
0.75
0.75
0.75
0.33
0.37
0.36
0.42
0.69
19s
20s
20s H
21s
21s HT
0.321
0.315
0.306
0.337
0.565
1.18
1.18
1.18
1.18
1.18
0.93
0.93
0.93
0.93
0.93
0.92
0.92
0.92
0.92
0.92
0.69
0.69
0.69
0.69
0.69
0.48
0.52
0.51
0.54
0.71
0.65
0.68
0.67
0.69
0.79
0.32
0.31
0.31
0.34
0.57
0.75
1.00
1.00
1.00
1.00
0.46
0.36
0.35
0.39
0.65
22s
24s
24s H
26s
28s
0.361
0.410
0.397
0.459
0.510
1.18
1.18
1.18
1.18
1.18
0.93
0.93
0.93
0.95
0.95
0.92
0.98
0.98
0.98
1.05
0.69
0.74
0.74
0.74
0.79
0.56
0.59
0.58
0.63
0.67
0.70
0.73
0.72
0.75
0.79
0.36
0.41
0.40
0.46
0.51
1.00
1.00
1.00
1.00
1.00
0.41
0.47
0.45
0.53
0.58
29s
30s
30s H
30s HT
31s
0.538
0.529
0.511
0.891
0.555
1.18
1.18
1.18
1.18
1.18
0.95
0.95
0.95
0.95
0.95
1.05
1.05
1.05
1.05
1.05
0.79
0.79
0.79
0.79
0.79
0.69
0.66
0.65
0.92
0.68
0.80
0.78
0.78
0.94
0.80
0.54
0.48
0.46
0.81
0.50
1.00
1.00
1.00
1.00
1.00
0.61
0.60
0.58
1.02
0.63
32s
36s
38s H
39s
40s
0.582
0.691
0.725
0.775
0.734
1.18
1.18
1.18
1.18
1.18
0.95
0.98
0.98
0.98
0.98
1.16
1.16
1.23
1.23
1.23
0.85
0.85
0.90
0.90
0.90
0.70
0.75
0.78
0.81
0.78
0.82
0.85
0.88
0.90
0.88
0.53
0.63
0.66
0.70
0.67
1.00
1.00
1.00
1.00
1.00
0.67
0.69
0.73
0.78
0.73
40s
40s
42s
42s
42s
0.708
1.278
0.786
0.757
1.375
1.18
1.18
1.18
1.18
1.18
0.98
0.98
0.98
0.98
0.98
1.23
1.23
1.23
1.23
1.23
0.90
0.90
0.90
0.90
0.90
0.76
1.15
0.82
0.80
1.22
0.87
1.10
0.90
0.89
1.14
0.64
1.16
0.71
0.69
1.25
1.00
1.00
1.00
1.00
1.00
0.71
1.28
0.79
0.76
1.38
H
HT
H
HT
Doffers Others
0.75
0.09
0.75
0.12
0.75
0.18
0.75
0.24
0.75
0.27
25
APPENDIX
Table A (contd.)
Conversion Factors for Calculating Standardised Production in Spinning
100% Polyester Yarns
Count
Prodn/
Spdle
Cards
Drg
Fly
Frames
Ring
Spg
Total
Ring Spinning
44s
44s HT
45s
45s H
46s
0.843
1.475
0.871
0.840
0.901
1.18
1.18
1.18
1.18
1.18
0.98
0.98
0.98
0.98
0.98
1.23
1.23
1.23
1.23
1.23
1.03
1.03
1.03
1.03
1.03
0.85
1.28
0.85
0.83
0.87
0.94
1.20
0.94
0.92
0.95
Tenters
0.77
1.34
0.73
0.70
0.75
46s HT
47s
48s
49s
50s
1.576
0.930
0.960
0.985
1.015
1.18
1.18
1.18
1.18
1.18
0.98
0.98
0.98
0.98
1.05
1.23
1.23
1.26
1.26
1.26
1.03
1.03
1.16
1.16
1.16
1.30
0.88
0.90
0.92
0.94
1.21
0.96
0.99
1.00
1.02
1.31
0.78
0.80
0.82
0.85
1.00
1.00
1.00
1.00
1.00
1.58
0.93
0.96
0.99
1.02
50s HT
51s
51s HT
54s
54s HT
1.787
1.046
1.830
1.140
1.994
1.18
1.18
1.18
1.18
1.18
1.05
1.05
1.05
1.05
1.05
1.26
1.26
1.26
1.27
1.27
1.16
1.16
1.16
1.26
1.26
1.44
0.96
1.47
1.02
1.57
1.32
1.03
1.34
1.08
1.41
1.49
0.87
1.53
0.95
1.66
1.00
1.00
1.00
1.00
1.00
1.79
1.05
1.83
1.14
1.99
55s
56s
56s HT
60s
60s HT
1.172
1.204
2.106
1.335
2.335
1.18
1.18
1.18
1.18
1.18
1.05
1.05
1.05
1.05
1.05
1.27
1.27
1.27
1.27
1.27
1.26
1.26
1.26
1.33
1.33
1.04
1.06
1.64
1.15
1.79
1.09
1.10
1.46
1.16
1.56
0.98
1.00
1.75
1.11
1.95
1.00
1.00
1.00
1.00
1.00
1.17
1.20
2.11
1.33
2.34
61s
62s
62s HT
63s
64s
1.368
1.402
2.453
1.436
1.463
1.18
1.18
1.18
1.18
1.18
1.05
1.05
1.05
1.05
1.05
1.27
1.27
1.27
1.27
1.34
1.33
1.33
1.33
1.33
1.41
1.11
1.13
1.77
1.15
1.17
1.14
1.16
1.54
1.17
1.19
1.14
1.17
2.04
1.20
1.22
1.00
1.00
1.00
1.00
1.00
1.17
1.20
2.10
1.23
1.25
65s
70s
71s
72s
76s
1.497
1.673
1.709
1.746
1.893
1.18
1.18
1.18
1.18
1.18
1.05
1.05
1.05
1.15
1.15
1.34
1.34
1.34
1.34
1.34
1.41
1.55
1.55
1.55
1.55
1.19
1.29
1.32
1.34
1.43
1.20
1.28
1.30
1.32
1.38
1.25
1.39
1.42
1.45
1.58
1.00
1.00
1.00
1.00
1.00
1.28
1.43
1.47
1.50
1.62
80s
80s HT
2.044
3.595
1.18
1.18
1.15
1.15
1.37
1.37
1.75
1.75
1.52
2.46
1.46
2.03
1.70
3.00
1.00
1.00
1.75
3.08
26
Mix &
Bl. Rm.
Doffers Others
1.00
0.84
1.00
1.47
1.00
0.87
1.00
0.84
1.00
0.90
APPENDIX
Table A (contd.)
Conversion Factors for Calculating Standardised Production in Spinning
Polyester Cotton (P/C) Blended Yarns
Count
Prodn/
Spdle
Mix &
Bl. Rm.
Cards
Drg
Fly
Frames
Ring
Spg
Total
Ring Spinning
Tenters
Doffers Others
6s
7s
10s
12s
14s
0.076
0.093
0.149
0.179
0.221
1.55
1.55
1.55
1.55
1.55
1.27
1.27
1.27
1.27
1.27
0.94
0.94
0.94
0.94
0.94
0.86
0.86
0.86
0.86
0.86
0.28
0.29
0.34
0.36
0.40
0.63
0.64
0.67
0.68
0.70
0.08
0.09
0.15
0.18
0.22
0.75
0.75
0.75
0.75
0.75
0.11
0.13
0.21
0.26
0.32
15s
16s
16s H
18s
20s
0.244
0.251
0.245
0.298
0.327
1.55
1.55
1.55
1.55
1.55
1.27
1.30
1.30
1.30
1.30
0.94
0.94
0.94
0.94
0.94
0.86
0.86
0.86
0.69
0.69
0.42
0.42
0.42
0.46
0.53
0.71
0.72
0.72
0.73
0.77
0.24
0.25
0.25
0.30
0.33
0.75
0.75
0.75
0.75
1.00
0.35
0.36
0.35
0.43
0.37
20s H
21s
22s
24s
24s H
0.319
0.352
0.375
0.425
0.415
1.55
1.55
1.55
1.55
1.55
1.30
1.30
1.30
1.30
1.30
0.94
0.94
0.94
1.00
1.00
0.69
0.69
0.69
0.76
0.76
0.52
0.55
0.57
0.61
0.60
0.76
0.78
0.79
0.82
0.82
0.32
0.35
0.38
0.43
0.41
1.00
1.00
1.00
1.00
1.00
0.36
0.40
0.43
0.49
0.47
26s
26s H
28s
30s
30s H
0.477
0.465
0.533
0.588
0.573
1.55
1.55
1.55
1.55
1.55
1.34
1.34
1.34
1.34
1.34
1.00
1.00
1.07
1.07
1.07
0.76
0.76
0.82
0.82
0.82
0.64
0.64
0.69
0.71
0.70
0.85
0.85
0.89
0.90
0.89
0.48
0.47
0.53
0.53
0.52
1.00
1.00
1.00
1.00
1.00
0.55
0.53
0.61
0.67
0.66
31s
32s
34s
34s H
35s
0.617
0.648
0.684
0.667
0.715
1.55
1.55
1.55
1.55
1.55
1.34
1.34
1.34
1.34
1.34
1.07
1.18
1.18
1.18
1.18
0.82
0.83
0.83
0.83
0.83
0.73
0.75
0.78
0.76
0.80
0.91
0.93
0.95
0.94
0.96
0.56
0.59
0.62
0.61
0.65
1.00
1.00
1.00
1.00
1.00
0.71
0.74
0.78
0.76
0.82
36s
36s H
38s
40s
40s H
0.745
0.726
0.808
0.823
0.796
1.55
1.55
1.55
1.55
1.55
1.38
1.38
1.38
1.38
1.38
1.18
1.18
1.25
1.25
1.25
0.83
0.83
0.92
0.92
0.92
0.79
0.78
0.83
0.84
0.82
0.96
0.95
1.00
1.01
1.00
0.68
0.66
0.73
0.75
0.72
1.00
1.00
1.00
1.00
1.00
0.75
0.73
0.81
0.82
0.80
42s
44s
45s
46s
48s
0.881
0.945
0.977
1.010
1.076
1.55
1.55
1.55
1.55
1.55
1.38
1.38
1.38
1.38
1.38
1.25
1.25
1.25
1.25
1.28
0.92
1.05
1.05
1.05
1.11
0.88
0.92
0.91
0.94
0.98
1.03
1.07
1.07
1.08
1.12
0.80
0.86
0.81
0.84
0.90
1.00
1.00
1.00
1.00
1.00
0.88
0.94
0.98
1.01
1.08
27
APPENDIX
Table A (contd.)
Conversion Factors for Calculating Standardised Production in Spinning
Polyester Cotton (P/C) Blended Yarns
Count
Prodn/
Spdle
Mix &
Bl. Rm.
Cards
Drg
Fly
Frames
Ring
Spg
Total
Ring Spinning
Tenters
50s
50s HT
51s
52s
54s
1.113
1.652
1.146
1.180
1.242
1.55
1.55
1.55
1.55
1.55
1.47
1.47
1.47
1.47
1.47
1.28
1.28
1.28
1.28
1.30
1.11
1.11
1.11
1.11
1.28
1.00
1.35
1.02
1.05
1.09
1.14
1.35
1.16
1.17
1.21
0.93
1.38
0.95
0.98
1.03
1.00
1.00
1.00
1.00
1.00
1.11
1.65
1.15
1.18
1.24
55s
55s HT
56s
58s
60s
1.277
1.906
1.311
1.382
1.378
1.55
1.55
1.55
1.55
1.55
1.47
1.47
1.47
1.47
1.47
1.30
1.30
1.30
1.30
1.30
1.28
1.28
1.28
1.28
1.28
1.11
1.52
1.13
1.18
1.17
1.23
1.47
1.24
1.27
1.27
1.06
1.59
1.09
1.15
1.15
1.00
1.00
1.00
1.00
1.00
1.28
1.91
1.31
1.38
1.38
60s H
60s HT
61s
62s
62s HT
1.337
2.057
1.413
1.447
2.161
1.55
1.55
1.55
1.55
1.55
1.47
1.47
1.47
1.47
1.47
1.30
1.30
1.30
1.30
1.30
1.28
1.28
1.28
1.28
1.28
1.15
1.61
1.14
1.16
1.59
1.25
1.53
1.25
1.26
1.52
1.11
1.71
1.18
1.21
1.80
1.00
1.00
1.00
1.00
1.00
1.34
2.06
1.21
1.24
1.85
63s
64s
64s HT
65s
66s
1.482
1.518
2.267
1.553
1.590
1.55
1.55
1.55
1.55
1.55
1.47
1.47
1.47
1.47
1.47
1.30
1.37
1.37
1.37
1.37
1.28
1.43
1.43
1.43
1.43
1.18
1.20
1.65
1.22
1.24
1.27
1.31
1.58
1.32
1.33
1.24
1.26
1.89
1.29
1.32
1.00
1.00
1.00
1.00
1.00
1.27
1.30
1.94
1.33
1.36
66s HT
67s
70s
72s
75s
2.360
1.626
1.736
1.811
1.926
1.55
1.55
1.55
1.55
1.55
1.47
1.47
1.47
1.62
1.62
1.37
1.37
1.37
1.37
1.37
1.43
1.43
1.58
1.58
1.58
1.71
1.27
1.33
1.38
1.45
1.61
1.34
1.40
1.45
1.49
1.97
1.36
1.45
1.51
1.60
1.00
1.00
1.00
1.00
1.00
2.02
1.39
1.49
1.55
1.65
76s
80s
80s H
84s
84s HT
1.964
2.110
2.047
2.270
3.389
1.55
1.55
1.55
1.55
1.55
1.62
1.62
1.62
1.62
1.62
1.37
1.40
1.40
1.40
1.40
1.58
1.69
1.69
1.69
1.69
1.47
1.56
1.52
1.66
2.33
1.51
1.57
1.55
1.63
2.04
1.64
1.76
1.71
1.89
2.82
1.00
1.00
1.00
1.00
1.00
1.68
1.81
1.75
1.95
2.90
2.518
2.949
1.55
1.55
1.87
1.87
1.46
1.47
1.94
1.94
1.81
2.07
1.79
1.95
2.10
2.46
1.00
1.00
2.16
2.53
90s
100s
28
Doffers Others
APPENDIX
Table A (contd.)
Conversion Factors for Calculating Standardised Production in Spinning
Polyester Viscose (P/V) Blended Yarns
Count
Prodn/
Spdle
Mix &
Bl. Rm.
Cards
Drg
Fly
Frames
Ring
Spg
Total
Ring Spinning
8s
10s
12s
14s
15s
0.095
0.127
0.152
0.189
0.208
1.24
1.24
1.24
1.24
1.24
0.90
0.90
0.90
0.90
0.90
0.92
0.92
0.92
0.92
0.92
0.85
0.85
0.85
0.85
0.85
0.29
0.32
0.34
0.37
0.39
0.56
0.57
0.59
0.61
0.62
Tenters
0.09
0.13
0.15
0.19
0.21
Doffers Others
0.75
0.14
0.75
0.18
0.75
0.22
0.75
0.27
0.75
0.30
16s
18s
20s
24s
26s
0.213
0.251
0.277
0.360
0.404
1.24
1.24
1.24
1.24
1.24
0.93
0.93
0.93
0.93
0.95
0.92
0.92
0.92
0.98
0.98
0.85
0.70
0.70
0.75
0.75
0.39
0.42
0.49
0.56
0.59
0.62
0.62
0.67
0.71
0.74
0.21
0.25
0.28
0.36
0.40
0.75
0.75
1.00
1.00
1.00
0.30
0.36
0.32
0.41
0.46
28s
29s
30s
31s
32s
0.449
0.473
0.495
0.520
0.546
1.24
1.24
1.24
1.24
1.24
0.95
0.95
0.95
0.95
0.95
1.05
1.05
1.05
1.05
1.16
0.79
0.79
0.79
0.79
0.85
0.62
0.64
0.64
0.66
0.68
0.77
0.78
0.78
0.79
0.81
0.45
0.47
0.45
0.47
0.50
1.00
1.00
1.00
1.00
1.00
0.51
0.54
0.57
0.59
0.62
34s
36s
38s
40s
40s H
0.580
0.628
0.681
0.714
0.665
1.24
1.24
1.24
1.24
1.24
0.95
0.98
0.98
0.98
0.98
1.16
1.16
1.23
1.23
1.23
0.85
0.85
0.91
0.91
0.91
0.70
0.71
0.75
0.77
0.73
0.82
0.83
0.87
0.88
0.86
0.53
0.57
0.62
0.65
0.60
1.00
1.00
1.00
1.00
1.00
0.66
0.63
0.68
0.71
0.66
42s
44s
45s
45s HT
46s
0.764
0.819
0.848
1.435
0.876
1.24
1.24
1.24
1.24
1.24
0.98
0.98
0.98
0.98
0.98
1.23
1.23
1.23
1.23
1.23
0.91
1.03
1.03
1.03
1.03
0.80
0.84
0.83
1.21
0.85
0.90
0.94
0.93
1.16
0.94
0.69
0.74
0.71
1.20
0.73
1.00
1.00
1.00
1.00
1.00
0.76
0.82
0.85
1.44
0.88
47s
48s
50s
50s HT
51s
0.905
0.934
0.988
1.682
1.017
1.24
1.24
1.24
1.24
1.24
0.98
0.98
1.05
1.05
1.05
1.23
1.26
1.26
1.26
1.26
1.03
1.16
1.16
1.16
1.16
0.87
0.89
0.92
1.37
0.94
0.95
0.98
1.01
1.28
1.02
0.75
0.78
0.82
1.40
0.85
1.00
1.00
1.00
1.00
1.00
0.90
0.93
0.99
1.68
1.02
52s
60s
60s HT
62s
64s
1.047
1.298
2.198
1.364
1.430
1.24
1.24
1.24
1.24
1.24
1.05
1.05
1.05
1.05
1.05
1.26
1.27
1.27
1.27
1.34
1.16
1.33
1.33
1.33
1.41
0.96
1.12
1.70
1.11
1.15
1.04
1.16
1.51
1.15
1.18
0.87
1.08
1.83
1.14
1.19
1.00
1.00
1.00
1.00
1.00
1.05
1.30
2.20
1.17
1.23
29
APPENDIX
Table A (contd.)
Conversion Factors for Calculating Standardised Production in Spinning
Polyester Viscose (P/V) Blended Yarns
Count
Prodn/
Spdle
Mix &
Bl. Rm.
Cards
Drg
Fly
Frames
Ring
Spg
Total
Ring Spinning
Tenters
65s
70s
76s
80s
90s
1.464
1.537
1.739
1.878
2.241
30
1.24
1.24
1.24
1.24
1.24
1.05
1.05
1.15
1.15
1.33
1.34
1.34
1.34
1.37
1.43
1.41
1.55
1.55
1.75
1.92
1.17
1.21
1.33
1.42
1.64
1.20
1.24
1.33
1.40
1.58
1.22
1.28
1.45
1.56
1.87
Doffers Others
1.00
1.00
1.00
1.00
1.00
1.25
1.32
1.49
1.61
1.92
APPENDIX
Table B
Number of Doffs and Production per Reeler in SHPR, DHCR and DHPR Systems and
the Conversion Factors for Cotton, 100% Polyester and Blended Yarns
SHPR
DHCR
DHPR
Count
6s
2/ 6s
7s
8s
2/ 8s
No. of
Doffs
33
27
34
36
31
Prodn. per
Reeler (Kg)
99.8
163.3
88.1
81.6
140.6
No. of
Doffs
21
17
22
24
20
Prodn per
Reeler (Kg)
127.0
205.6
114.0
108.9
181.4
No. of
Doffs
21
17
22
23
20
10s
2/ 10s
12s
2/ 12s
14s
38
34
42
36
44
68.9
123.4
63.5
108.9
57.0
27
23
29
25
30
98.0
166.9
87.7
151.2
77.8
27
22
29
24
30
98.0
159.7
87.7
145.2
77.8
0.314
0.193
0.351
0.212
0.396
2/ 14s
15s
16s
2/ 16s
17s
37
45
45
39
46
95.9
54.4
51.0
88.5
49.1
26
31
32
27
32
134.8
75.0
72.6
122.5
68.3
26
31
31
27
31
134.8
75.0
70.3
122.5
66.2
0.228
0.411
0.438
0.251
0.465
2/ 17s
18s
2/ 18s
20s
2/ 20s
41
46
40
45
41
87.5
46.4
80.6
40.8
74.4
27
33
29
31
30
119.5
66.5
116.9
56.2
108.9
27
32
28
31
29
115.3
64.5
112.9
56.2
105.2
0.267
0.478
0.273
0.548
0.293
21s
2/ 21s
22s
2/ 22s
23s
45
43
45
44
46
38.9
74.3
37.1
72.6
36.3
32
30
32
30
32
55.3
103.7
52.8
99.0
50.5
31
29
31
30
32
53.6
100.2
51.1
99.0
50.5
0.575
0.307
0.603
0.311
0.610
2/ 23s
24s
2/ 24s
25s
2/ 25s
44
46
45
46
45
69.4
34.8
68.0
33.4
65.3
31
33
31
33
32
97.8
49.9
93.7
47.9
92.9
30
32
31
32
31
94.7
48.4
93.7
46.4
90.0
0.325
0.636
0.329
0.664
0.342
26s
2/ 26s
27s
28s
2/ 28s
47
45
47
47
46
32.8
62.8
31.6
30.5
59.6
33
32
33
34
32
46.1
89.3
44.4
44.1
82.9
32
31
33
33
32
44.7
86.5
44.4
42.8
82.9
0.689
0.356
0.694
0.720
0.372
Conversion Factors for Carded Counts Apply to the Corresponding Combed Counts Also.
31
APPENDIX
Table B (Contd.)
Number of Doffs and Production per Reeler in SHPR, DHCR and DHPR Systems and
the Conversion Factors for Cotton, 100% Polyester and Blended Yarns
SHPR
Count
DHCR
DHPR
30s
2/ 30s
31s
2/ 31s
32s
No. of
Doffs
48
46
48
47
48
Prodn. per
Reeler (Kg)
29.0
55.6
28.1
55.0
27.2
No. of
Doffs
34
33
34
33
35
Prodn per
Reeler (Kg)
41.1
79.8
39.8
77.3
39.7
No. of
Doffs
33
32
34
32
34
2/ 32s
33s
34s
2/ 34s
35s
47
48
48
47
49
53.3
26.4
25.6
50.2
25.4
34
35
35
34
35
77.1
38.5
37.4
72.6
36.3
32
34
34
33
34
72.6
37.4
36.3
70.3
35.3
0.424
0.824
0.848
0.438
0.873
36s
2/ 36s
37s
38s
2/ 38s
49
48
49
49
48
24.7
48.4
24.0
23.4
45.8
35
34
35
36
35
35.3
68.5
34.3
34.4
66.8
35
33
35
35
34
35.3
66.5
34.3
33.4
64.8
0.873
0.463
0.898
0.922
0.475
39s
40s
2/ 40s
41s
2/ 41s
49
47
45
46
46
22.8
21.3
40.8
20.4
40.7
36
36
35
36
36
33.5
32.7
63.5
31.9
63.7
35
34
33
34
34
32.6
30.8
59.9
30.1
60.2
0.945
1.000
0.514
1.023
0.512
42s
2/ 42s
43s
44s
2/ 44s
47
46
47
47
46
20.3
39.7
19.8
19.4
37.9
36
36
37
36
37
31.1
62.2
31.2
29.7
61.0
34
33
34
34
35
29.4
57.0
28.7
28.0
57.7
1.048
0.540
1.073
1.100
0.534
45s
2/ 45s
46s
2/ 46s
47s
47
46
47
46
47
19.0
37.1
18.5
36.3
18.1
37
37
37
37
37
29.8
59.7
29.2
58.4
28.6
34
35
34
35
34
27.4
56.4
26.8
55.2
26.3
1.124
0.546
1.149
0.558
1.171
2/ 47s
48s
2/ 48s
49s
50s
46
47
46
47
47
35.5
17.8
34.8
17.4
17.1
37
37
37
37
37
57.1
28.0
55.9
27.4
26.9
34
35
34
35
35
52.5
26.5
51.4
25.9
25.4
0.587
1.162
0.599
1.189
1.213
Conversion Factors for Carded Counts Apply to the Corresponding Combed Counts Also.
32
APPENDIX
Table B (Contd.)
Number of Doffs and Production per Reeler in SHPR, DHCR and DHPR Systems and
the Conversion Factors for Cotton, 100% Polyester and Blended Yarns
SHPR
DHCR
DHPR
Count
No. of
Prodn. per
No. of
Prodn per
No. of
Prodn. per Conversion
Doffs
Reeler (Kg)
Doffs
Reeler (Kg)
Doffs
Reeler (Kg)
Factor
2/ 50s
47
34.1
37
53.7
35
50.8
0.606
52s
47
16.4
37
25.8
35
24.4
1.262
2/ 52s
47
32.8
38
53.0
35
48.8
0.631
54s
48
16.1
37
24.9
35
23.5
1.311
2/ 54s
47
31.6
38
51.1
36
48.4
0.636
55s
2/ 55s
56s
2/ 56s
58s
48
47
48
47
48
15.8
31.0
15.6
30.5
15.0
38
38
38
38
38
25.1
50.1
24.6
49.2
23.7
35
36
35
36
35
23.1
47.5
22.7
46.7
21.9
1.333
0.648
1.357
0.660
1.406
2/ 58s
60s
2/ 60s
61s
2/ 61s
47
49
48
49
49
29.4
14.8
29.0
14.6
29.1
38
39
38
39
39
47.5
23.6
46.0
23.2
46.4
35
36
36
36
36
43.8
21.8
43.5
21.4
42.8
0.703
1.413
0.708
1.439
0.720
62s
2/ 62s
63s
64s
2/ 64s
49
49
49
49
49
14.3
28.7
14.1
13.9
27.8
39
39
39
39
39
22.8
45.7
22.5
22.1
44.2
37
36
37
37
36
21.7
42.1
21.3
21.0
40.8
1.419
0.732
1.446
1.467
0.755
65s
2/ 65s
66s
2/ 66s
70s
49
49
50
49
50
13.7
27.4
13.7
26.9
13.0
39
39
39
39
40
21.8
43.5
21.4
42.9
20.7
37
36
37
37
37
20.7
40.2
20.3
40.7
19.2
1.488
0.766
1.517
0.757
1.604
2/ 70s
72s
2/ 72s
73s
74s
49
50
49
50
50
25.4
12.6
24.7
12.4
12.3
39
40
39
40
40
40.4
20.2
39.3
19.9
19.6
37
37
37
37
37
38.4
18.6
37.3
18.4
18.1
0.802
1.656
0.826
1.674
1.702
2/ 74s
75s
2/ 75s
76s
2/ 76s
49
50
49
50
49
24.0
12.1
23.7
11.9
23.4
39
40
39
40
40
38.2
19.4
37.7
19.1
38.2
37
37
37
37
37
36.3
17.9
35.8
17.7
35.3
0.848
1.721
0.860
1.740
0.873
Conversion Factors for Carded Counts Apply to the Corresponding Combed Counts Also.
33
APPENDIX
Table B (Contd.)
Number of Doffs and Production per Reeler in SHPR, DHCR and DHPR Systems and
the Conversion Factors for Cotton, 100% Polyester and Blended Yarns
SHPR
DHCR
DHPR
Count
No. of
Prodn. per
No. of
Prodn per
No. of
Prodn. per Conversion
Doffs
Reeler (Kg)
Doffs
Reeler (Kg)
Doffs
Reeler (Kg)
Factor
80s
50
11.3
40
18.1
37
16.8
1.833
2/ 80s
50
22.7
40
36.3
37
33.6
0.917
81s
50
11.2
40
17.9
37
16.6
1.855
82s
50
11.1
40
17.7
37
16.4
1.878
2/ 82s
50
22.1
40
35.4
37
32.7
0.942
84s
2/ 84s
86s
2/ 86s
2/ 88s
50
50
50
50
50
10.8
21.6
10.5
21.1
20.6
40
40
40
40
40
17.3
34.6
16.9
33.8
33.0
38
38
38
38
38
16.4
32.8
16.0
32.1
31.3
1.878
0.939
1.925
0.960
0.984
89s
2/ 89s
90s
2/ 90s
91s
50
50
50
50
50
10.2
20.4
10.1
20.2
10.0
41
40
41
40
41
16.7
32.6
16.5
32.3
16.3
38
38
38
38
38
15.5
31.0
15.3
30.6
15.2
1.987
0.994
2.013
1.007
2.026
92s
2/ 92s
93s
2/ 93s
94s
50
50
50
50
50
9.9
19.7
9.8
19.5
9.7
41
40
41
40
41
16.2
31.6
16.0
31.2
15.8
38
37
38
37
38
15.0
29.2
14.8
28.9
14.7
2.053
1.055
2.081
1.066
2.095
2/ 94s
96s
98s
2/ 98s
100s
50
50
51
50
51
19.3
9.6
9.4
18.5
9.3
40
41
41
41
41
30.9
15.5
15.2
30.4
14.9
37
38
38
37
38
28.6
14.4
14.1
27.4
13.8
1.077
2.139
2.184
1.124
2.232
2/100s
108s
2/108s
110s
2/110s
50
51
50
51
50
18.1
8.6
16.8
8.4
16.5
41
41
41
41
41
29.8
13.8
27.6
13.5
27.1
38
38
38
38
39
27.6
12.8
25.5
12.5
25.7
1.116
2.406
1.208
2.464
1.198
120s
2/120s
132s
51
51
52
7.7
15.4
7.1
42
41
42
12.7
24.8
11.5
38
38
39
11.5
23.0
10.7
2.678
1.339
2.879
Conversion Factors for Carded Counts Apply to the Corresponding Combed Counts Also.
34
Number of
Count
APPENDIX
Table B (Contd.)
Doffs and Production per Reeler in SHPR, DHCR and DHPR Systems and
the Conversion Factors for Viscose Staple Fibre Yarns
SHPR
DHCR
DHPR
No. of
Prodn. per
No. of
Prodn per
No. of
Prodn. per Conversion
Doffs
Reeler (Kg)
Doffs
Reeler (Kg)
Doffs
Reeler (Kg)
Factor
37
87.3
24
113.2
23
108.5
0.284
29
136.8
19
179.3
19
179.3
0.172
41
60.4
28
82.6
27
79.6
0.387
33
97.3
23
135.6
23
135.6
0.227
42
55.0
29
76.0
28
73.4
0.420
10s
2/ 10s
16s
2/ 16s
18s
SF
SF
SF
SF
SF
2/ 18s
20s
2/ 20s
24s
2/ 24s
SF
SF
SF
SF
SF
34
41
36
42
37
89.1
48.4
84.9
41.3
72.7
24
28
25
29
27
125.8
66.0
117.9
57.0
106.1
24
27
25
28
26
125.8
63.7
117.9
55.0
102.2
0.245
0.484
0.261
0.560
0.301
26s
2/ 26s
28s
2/ 28s
30s
SF
SF
SF
SF
SF
43
38
43
38
44
39.0
68.9
36.2
64.0
34.6
29
27
30
28
30
52.6
98.0
50.5
94.3
47.2
29
27
29
27
30
52.6
98.0
48.9
91.0
47.2
0.586
0.314
0.630
0.338
0.653
2/ 30s
31s
2/ 31s
32s
2/ 32s
SF
SF
SF
SF
SF
39
44
39
44
39
61.3
33.5
59.3
32.4
57.5
28
31
29
31
29
88.1
47.2
88.3
45.7
85.5
28
30
28
30
28
88.1
45.7
85.2
44.2
82.6
0.350
0.674
0.362
0.697
0.373
34s
2/ 34s
35s
2/ 35s
36s
SF
SF
SF
SF
SF
44
40
45
40
45
30.5
55.5
30.3
53.9
29.5
31
29
31
29
31
43.0
80.5
41.8
78.2
40.6
30
29
31
29
31
41.6
80.5
41.8
78.2
40.6
0.740
0.383
0.737
0.394
0.759
2/ 36s
39s
2/ 39s
40s
2/ 40s
SF
SF
SF
SF
SF
40
45
40
43
41
52.4
27.2
51.0
25.4
48.4
30
32
30
32
30
78.6
38.7
76.5
37.7
70.8
29
31
29
30
30
76.0
37.5
73.9
35.4
70.8
0.405
0.821
0.417
0.870
0.435
42s
2/ 42s
50s
2/ 50s
60s
SF
SF
SF
SF
SF
43
41
44
42
46
24.1
46.1
20.8
39.6
18.1
32
31
33
32
35
35.9
69.6
31.1
60.4
27.5
30
30
31
31
33
33.7
67.4
29.2
58.5
25.9
0.914
0.457
1.055
0.526
1.189
35
APPENDIX
Table B (Contd.)
Number of Doffs and Production per Reeler in SHPR, DHCR and DHPR Systems and
the Conversion Factors for Viscose Staple Fibre Yarns
SHPR
DHCR
DHPR
Count
No. of
Prodn. per
No. of
Prodn per
No. of
Prodn. per Conversion
Doffs
Reeler (Kg)
Doffs
Reeler (Kg)
Doffs
Reeler (Kg)
Factor
2/ 60s SF
62s SF
2/ 62s SF
36
43
46
43
33.8
17.5
32.7
33
35
33
51.9
26.6
50.2
32
33
32
50.3
25.1
48.7
0.612
1.227
0.632
APPENDIX
Table C
Number of Drums, Efficiency, Prodn. per Winder and Conversion Factors For Conventional
Cone Winders for Cotton, Viscose Staple Fibre, 100% Polyester and Blended Yarns
Count
No.of EfficiProdn/
Conversion
Drums ency (%) Winder(Kg)
Factor
Count
No.of EfficiProdn/
Conversion
Drums ency(%) Winder(Kg)
Factor
6s
2/ 6s
7s
8s
2/ 8s
10
8
10
10
8
60.5
50.0
69.0
74.5
66.0
157.2
207.9
153.7
145.2
205.8
0.618
0.467
0.632
0.669
0.472
30s
2/ 30s
31s
2/ 31s
32s
24
20
24
20
24
81.0
81.5
81.5
82.5
82.0
101.0
169.4
98.4
166.0
95.9
0.961
0.573
0.987
0.585
1.013
10s
2/ 10s
12s
2/ 12s
14s
12
8
12
8
15
77.0
75.0
80.5
79.5
79.0
144.1
187.1
125.5
165.3
132.0
0.674
0.519
0.774
0.587
0.736
2/ 32s
33s
34s
2/ 34s
35s
24
24
24
24
24
73.5
82.5
83.0
77.5
83.0
171.9
93.6
91.4
170.6
88.7
0.565
1.037
1.062
0.569
1.095
2/ 14s
15s
16s
2/ 16s
17s
12
15
15
12
15
73.0
80.5
81.5
78.5
82.5
195.1
125.5
119.1
183.6
113.5
0.498
0.774
0.815
0.529
0.856
36s
2/ 36s
37s
38s
2/ 38s
24
24
24
30
24
83.5
81.0
84.0
76.0
84.0
86.8
168.4
85.0
93.6
165.4
1.119
0.577
1.142
1.037
0.587
2/ 17s
18s
2/ 18s
20s
2/ 20s
12
20
15
24
15
80.0
73.0
72.5
59.5
79.5
176.1
126.5
188.4
111.3
185.9
0.551
0.768
0.515
0.872
0.522
39s
40s
2/ 40s
41s
2/ 41s
30
30
30
30
30
77.5
83.0
75.0
83.5
76.5
93.0
97.1
175.4
95.3
174.6
1.044
1.000
0.554
1.019
0.556
21s
2/ 21s
22s
2/ 22s
23s
24
15
24
15
24
62.0
80.5
64.5
81.5
66.5
110.5
179.3
109.7
173.3
108.2
0.879
0.542
0.885
0.560
0.897
42s
2/ 42s
43s
44s
2/ 44s
30
30
30
30
30
83.5
78.5
84.0
84.0
81.5
93.0
174.9
91.4
89.3
173.3
1.044
0.555
1.062
1.087
0.560
2/ 23s
24s
2/ 24s
25s
2/ 25s
15
24
15
24
15
81.5
69.0
83.0
71.5
83.5
165.8
107.6
161.8
107.0
156.2
0.586
0.902
0.600
0.907
0.622
45s
2/ 45s
46s
2/ 46s
47s
30
30
30
30
30
84.5
82.0
84.5
82.5
85.0
87.8
170.5
85.9
167.8
84.6
1.106
0.570
1.130
0.579
1.148
26s
2/ 26s
27s
28s
2/ 28s
24
20
24
24
20
73.5
75.5
76.0
78.0
80.0
105.8
181.1
105.3
104.2
178.2
0.918
0.536
0.922
0.932
0.545
2/ 47s
48s
2/ 48s
49s
50s
30
30
30
30
40
83.0
85.0
83.0
85.5
73.5
165.2
82.8
161.8
81.6
91.7
0.588
1.173
0.600
1.190
1.059
Conversion factors for Carded counts apply to the corresponding Combed counts also.
37
APPENDIX
Table C (Contd.)
Number of Drums, Efficiency, Prodn. per Winder and Conversion Factors For Conventional
Cone Winders for Cotton, Viscose Staple Fibre, 100% Polyester and Blended Yarns
Count
No.of EfficiProdn/
Conversion
Drums ency(%) Winder(Kg)
Factor
Count
No.of EfficiProdn/
Conversion
Drums ency(%) Winder(Kg)
Factor
2/ 50s
52s
2/ 52s
54s
2/ 54s
30
40
30
40
30
83.5
75.5
84.0
77.0
84.5
156.2
90.6
151.1
88.9
146.4
0.622
1.072
0.643
1.092
0.663
80s
2/ 80s
81s
82s
2/ 82s
60
40
60
60
40
66.0
86.0
66.5
67.0
86.0
77.2
134.1
76.8
76.4
130.8
1.258
0.724
1.264
1.271
0.742
55s
2/ 55s
56s
2/ 56s
58s
40
30
40
30
40
78.0
85.0
79.0
85.0
81.0
88.5
144.6
88.0
142.0
87.1
1.097
0.672
1.103
0.684
1.115
84s
2/ 84s
86s
2/ 86s
2/ 88s
60
40
60
40
40
68.0
86.5
69.0
86.5
86.5
75.7
128.5
75.1
125.5
122.6
1.283
0.756
1.293
0.774
0.792
2/ 58s
60s
2/ 60s
61s
2/ 61s
30
40
30
40
30
85.0
83.5
85.5
83.5
85.5
137.1
86.8
133.3
85.4
131.1
0.708
1.119
0.728
1.137
0.741
89s
2/ 89s
90s
2/ 90s
91s
60
40
60
40
60
70.0
87.0
70.5
87.0
71.0
73.6
121.9
73.3
120.6
73.0
1.319
0.797
1.325
0.805
1.330
62s
2/ 62s
63s
64s
2/ 64s
40
30
40
40
30
84.0
86.0
84.0
84.0
86.0
84.5
129.8
83.2
81.9
125.7
1.149
0.748
1.167
1.186
0.772
92s
2/ 92s
93s
2/ 93s
94s
60
40
60
40
60
71.5
87.5
72.0
87.5
72.5
72.7
118.6
72.4
117.4
72.2
1.336
0.819
1.341
0.827
1.345
65s
2/ 65s
66s
2/ 66s
70s
40
30
40
30
40
84.5
86.0
84.5
86.5
85.0
81.0
123.8
79.9
122.6
75.7
1.199
0.784
1.215
0.792
1.283
2/ 94s
96s
98s
2/ 98s
100s
40
60
60
40
60
87.5
72.5
74.0
88.0
80.0
116.1
71.6
70.6
112.0
74.8
0.836
1.356
1.375
0.867
1.298
2/ 70s
72s
2/ 72s
73s
74s
40
40
40
40
40
82.0
85.5
83.0
85.5
85.5
146.1
74.1
143.8
73.0
72.1
0.665
1.310
0.675
1.330
1.347
2/100s
108s
2/108s
110s
2/110s
40
60
40
60
40
88.0
82.0
88.0
82.0
88.0
109.8
71.0
101.6
69.7
99.8
0.884
1.368
0.956
1.393
0.973
2/ 74s
75s
2/ 75s
76s
2/ 76s
40
40
40
40
40
83.5
85.5
83.5
85.5
83.5
140.8
71.1
138.9
70.2
137.0
0.690
1.366
0.699
1.383
0.709
120s
2/120s
132s
60
40
60
82.5
88.5
83.0
64.3
92.0
58.8
1.510
1.055
1.651
Conversion factors for Carded counts apply to the corresponding Combed counts also.
38
APPENDIX
Table D
Number of Drums, Efficiency, Prodn. per Winder and Conversion Factors for Automatic
Cone Winders for Cotton, Viscose Staple Fibre, 100% Polyester and Blended Yarns
Count
No.of EfficiProdn/
Conversion
Drums ency(%) Winder(Kg) Factor
Count
No.of EfficiProdn/
Conversion
Drums ency(%) Winder(Kg) Factor
6s
2/ 6s
7s
8s
2/ 8s
15
10
15
15
10
52.0
49.0
60.5
69.5
65.0
442
556
441
443
553
0.751
0.597
0.753
0.749
0.600
28s
2/ 28s
30s
2/ 30s
31s
30
24
40
30
40
82.5
86.0
73.0
81.5
75.5
301
502
331
555
331
1.103
0.661
1.003
0.598
1.003
9s
10s
2/ 10s
12s
2/ 12s
15
15
10
20
15
76.0
77.0
75.5
77.5
65.0
431
393
514
439
553
0.770
0.845
0.646
0.756
0.600
2/ 31s
32s
2/ 32s
33s
34s
30
40
30
40
40
84.0
78.0
87.0
80.5
83.0
553
332
555
332
332
0.600
1.000
0.598
1.000
1.000
13s
14s
2/ 14s
15s
16s
20
24
15
24
30
79.0
75.5
76.0
80.0
69.0
413
440
554
435
440
0.804
0.755
0.599
0.763
0.755
2/ 34s
35s
36s
2/ 36s
37s
30
40
40
30
40
87.0
84.5
84.5
87.5
84.5
522
329
319
496
311
0.636
1.009
1.041
0.669
1.068
2/ 16s
17s
2/ 17s
18s
2/ 18s
15
30
15
30
20
81.0
74.0
81.5
78.0
73.0
517
444
489
442
552
0.642
0.748
0.679
0.751
0.601
38s
2/ 38s
39s
40s
2/ 40s
50
40
50
50
40
74.0
77.5
76.0
78.0
81.5
331
555
331
332
555
1.003
0.598
1.003
1.000
0.598
20s
2/ 20s
21s
2/ 21s
22s
30
20
30
20
30
65.0
81.0
68.5
83.5
71.5
332
551
333
541
332
1.000
0.603
0.997
0.614
1.000
41s
2/ 41s
42s
2/ 42s
44s
50
40
50
40
50
80.0
83.5
82.0
85.5
86.0
332
554
332
554
332
1.000
0.599
1.000
0.599
1.000
2/ 22s
23s
2/ 23s
24s
2/ 24s
20
30
20
30
20
84.0
75.0
84.5
78.0
84.5
520
333
500
332
479
0.638
0.997
0.664
1.000
0.693
2/ 44s
45s
2/ 45s
46s
2/ 46s
40
50
40
60
40
88.5
87.0
88.5
75.0
88.5
547
329
535
333
524
0.607
1.009
0.621
0.997
0.634
25s
2/ 25s
26s
2/ 26s
27s
30
24
30
24
30
81.5
84.5
82.0
85.5
82.5
333
552
322
537
312
0.997
0.601
1.031
0.618
1.064
47s
2/ 47s
48s
2/ 48s
49s
60
40
60
50
60
76.5
89.0
78.0
78.0
80.0
332
515
332
553
333
1.000
0.645
1.000
0.600
0.997
Conversion factors for Carded counts apply to the corresponding Combed counts also.
39
APPENDIX
Table D (Contd.)
Number of Drums, Efficiency, Prodn. per Winder and Conversion Factors for Automatic
Cone Winders for Cotton, Viscose Staple Fibre, 100% Polyester and Blended Yarns
Count
No.of EfficiProdn/
Conversion
Drums ency(%) Winder(Kg) Factor
Count
No.of EfficiProdn/
Conversion
Drums ency(%) Winder(Kg) Factor
50s
2/ 50s
52s
2/ 52s
54s
60
50
60
50
60
81.0
81.5
84.5
84.5
87.5
331
555
332
553
331
1.003
0.598
1.000
0.600
1.003
76s
2/ 76s
80s
2/ 80s
82s
90
60
90
60
90
82.5
90.5
86.5
92.0
89.0
332
486
331
469
332
1.000
0.683
1.003
0.708
1.000
2/ 54s
55s
2/ 55s
56s
2/ 56s
50
60
50
60
50
88.0
87.5
89.5
87.5
89.5
554
325
554
319
544
0.599
1.022
0.599
1.041
0.610
2/ 82s
84s
2/ 84s
86s
2/ 86s
90
90
90
90
90
74.0
90.0
76.0
90.5
78.0
553
328
554
322
555
0.600
1.012
0.599
1.031
0.598
57s
58s
2/ 58s
59s
60s
60
60
50
60
60
87.5
87.5
89.5
87.5
88.5
313
308
525
303
301
1.061
1.078
0.632
1.096
1.103
89s
2/ 89s
90s
2/ 90s
91s
90
90
90
90
90
90.5
80.5
90.5
81.5
90.5
311
554
308
555
304
1.068
0.599
1.078
0.598
1.092
2/ 60s
61s
2/ 61s
62s
2/ 62s
60
60
60
60
60
81.5
89.0
82.5
89.0
84.0
555
298
552
293
553
0.598
1.114
0.601
1.133
0.600
92s
2/ 92s
93s
2/ 93s
94s
90
90
90
90
90
90.5
83.0
90.5
84.0
90.5
301
552
298
553
295
1.103
0.601
1.114
0.600
1.125
63s
64s
2/ 64s
65s
2/ 65s
60
60
60
60
60
89.0
89.0
86.5
89.0
88.0
288
284
552
279
553
1.153
1.169
0.601
1.190
0.600
2/ 94s
96s
98s
2/ 98s
100s
90
90
120
90
120
85.0
90.5
80.0
88.5
81.5
554
289
333
553
333
0.599
1.149
0.997
0.600
0.997
66s
2/ 66s
70s
2/ 70s
72s
90
60
90
60
90
71.5
89.5
76.0
90.5
78.0
332
554
332
528
332
1.000
0.599
1.000
0.629
1.000
2/100s
108s
2/108s
110s
2/110s
90
120
90
120
90
90.5
88.0
92.5
89.5
92.5
554
333
524
332
515
0.599
0.997
0.634
1.000
0.645
2/ 72s
74s
2/ 74s
75s
2/ 75s
60
90
60
90
60
90.5
80.5
90.5
81.5
90.5
513
333
499
333
493
0.647
0.997
0.665
0.997
0.673
112s
115s
120s
2/120s
132s
120
120
120
90
120
90.5
90.5
90.5
92.5
91.0
330
321
308
477
281
1.006
1.034
1.078
0.696
1.182
Conversion factors for Carded counts apply to the corresponding Combed counts also.