CUSTOMER: MAADEN K.S.A EQUIPMENT TAG NO.: BI/JO NO.: REF. DRAWINGS & DOCUMENTS: TEST COMPLETION DATE:
MAKE TYPE MODEL NO. VL 800 SIEMENS
PROJECT: SUBSTATION-1 DESCRIPTION: L V MCC CIRCUIT BREAKER PLANT NO. / LOCATION: /08/2010
VOLTAGE RATING CURRENT RATING PLUG RATING 480 Volt A
Ite m 1 2 3 4 5 6 7 8 9
Description Inspect for physical damage/defects. Check quality of paintwork. Check nameplate information for correctness. Check tightness of all bolted connections (torque wrench method). Check racking mechanism for alignment and smoothness of operation. Check operation of all mechanical interlocks. Check for correct breaker position indication. Check the arc chutes for damage and correct positioning above the interrupter contacts. Check that all control wiring is correct according to the approved drawings and terminal connections are secure.
TESTING ENGINEER
Name Signature Date
NOUR QC
MAADEN WITNESS
CUSTOMER: MAADEN K.S.A EQUIPMENT TAG NO.: BI/JO NO.: REF. DRAWINGS & DOCUMENTS: TEST COMPLETION DATE:
Item 1 2 3 Contact Resistance Insulation resistance TRIP TEST
PROJECT: SUBSTATION-1 DESCRIPTION: L V MCC CIRCUIT BREAKER PLANT NO. / LOCATION: /08/2010
Remarks OK OK OK
Description
B to ( A+C+G)
B TO C
TESTING ENGINEER
Name Signature Date
NOUR QC
MAADEN WITNESS
CUSTOMER: MAADEN K.S.A EQUIPMENT TAG NO.: BI/JO NO.: REF. DRAWINGS & DOCUMENTS: TEST COMPLETION DATE:
C to (A+B+G)
PROJECT: SUBSTATION-1 DESCRIPTION: L V MCC CIRCUIT BREAKER PLANT NO. / LOCATION: /08/2010
C TO A
2. CONTACT RESISTANCE TEST (VALUES IN MICRO OHMS) : (TEST CURRENT A) PHASE CONTACT RESISTANCE
A
B C
3. TRIP TEST
PHASES
L1
L2
L3
TESTING ENGINEER
Name Signature Date
NOUR QC
MAADEN WITNESS
CUSTOMER: MAADEN K.S.A EQUIPMENT TAG NO.: BI/JO NO.: REF. DRAWINGS & DOCUMENTS: TEST COMPLETION DATE:
PROJECT: SUBSTATION-1 DESCRIPTION: L V MCC CIRCUIT BREAKER PLANT NO. / LOCATION: /08/2010
MAKE
CALIBRATION DATE
CALIBRATION EXP.
TESTING ENGINEER
Name Signature Date
NOUR QC
MAADEN WITNESS
CUSTOMER: MAADEN K.S.A EQUIPMENT TAG NO.: BI/JO NO.: REF. DRAWINGS & DOCUMENTS: TEST COMPLETION DATE:
Micro Ohm meter TRIP CHECK
PROJECT: SUBSTATION-1 DESCRIPTION: L V MCC CIRCUIT BREAKER PLANT NO. / LOCATION: /08/2010
TESTING ENGINEER
Name Signature Date
NOUR QC
MAADEN WITNESS