You are on page 1of 27

PT PEMBANGKITAN JAWA BALI SERVICES

SIAP INTEGRATED MANAGEMENT SYSTEM


ANNUAL INSPECTION UNIT 1
PLTA ASAHAN 1 - 2022
Description RELAY PROTECTION
Equipment GE G60 MULTILIN
INSPECTION SHEET Document Number FU-AS-ELEC-02.017
Issued 11 Agustus 2020
Task No. : Revision : 00 Section : Electric
WO No. : Page :1 Date :

FOTO

No Item Pekerjaan Kondisi Aktual Tindak Lanjut Keterangan

Pengechekan & Hasil Pengujian


1 Pengecekan dan pembersihan Baik Cleaning Terlampir

ACCEPTED / REWORK / REPLACE


RECOMMENDATION
(by Quality Control)
PLTA ASAHAN 1 PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name
Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
ANNUAL INSPECTION UNIT 1
PLTA ASAHAN 1 - 2022
Description RELAY PROTECTION
Equipment GE G60 MULTILIN
MEASUREMENT SHEET Document Number FU-AS-ELEC-02.017
Issued 11 Agustus 2020
Task No. : Revision : 00 Section : Electric
WO No. : Page :2 Date :

STATOR DIFFERENTIAL (PANEL A)


Nama Modul : Modul relay GE-G60 Generator protection
Set Pickup : 0,2 pu SRC 1 SRC 2
Slope 1 : 40% OUTGEN NTRLGEN
Break 1 : 1 pu CT Pri : 5000 5000 A
Slope 2 : 80% CT Sec : 1 1A
Break 1 : 4 pu

Id
IP/I1 IS/I2 Ir
Theo Actual Remarks
(A) (pu) (A) (pu) (pu) (pu) (pu)
2.10 2.10 2.23 2.23 2.23 0.16 0.13
2.15 2.47 2.64 2.64 2.64 0.21 0.17
2.99 2.99 3.22 3.22 3.22 0.28 0.23
Calculation for Id and Ir
3.95 3.95 4.29 4.29 4.29 0.41 0.34
Follow GE Curve
5.22 5.22 5.69 5.69 5.69 0.58 0.47
6.40 6.40 7.01 7.01 7.01 0.74 0.61
7.59 7.59 8.33 8.33 8.33 0.90 0.74

Pickup Value Outgen 0.20 A


Pickup Value Neugen 0.20 A
Trip Time
Injected Current (A) Target (ms)
(ms)
0.25 50 26
0.23 50 19

TRIP TARGET 1. Trip Field Discharge Breaker 1


2. Trip Field Discharge Breaker 2
3. Start Breaker Fail
4. Stop Turbine
5. Trip Generator Breaker 1
6. Trip Generator Breaker 2

Hasil Pengujian Accepted

ACCEPTED / REWORK / REPLACE


RECOMMENDATION
(by Quality Control)

Measuring Tool ISA DRTS 66


PLTA ASAHAN 1 PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name
Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
ANNUAL INSPECTION UNIT 1
PLTA ASAHAN 1 - 2022
Description RELAY PROTECTION
Equipment GE G60 MULTILIN
MEASUREMENT SHEET Document Number FU-AS-ELEC-02.017
Issued 11 Agustus 2020
Task No. : Revision : 00 Section : Electric
WO No. : Page :3 Date :

STATOR DIFFERENTIAL PANEL B


Nama Modul : Modul relay GE-G60 Generator protection
Set Pickup : 0,2 pu SRC 1 SRC 2
Slope 1 : 40% OUTGEN NTRLGEN
Break 1 : 1 pu CT Pri : 5000 5000 A
Slope 2 : 80% CT Sec : 1 1A
Break 1 : 4 pu

Id
IP/I1 IS/I2 Ir
Theo Actual Remarks
(A) (pu) (A) (pu) (pu) (pu) (pu)
2.10 2.10 2.23 2.23 2.23 0.16 0.13
2.15 2.47 2.64 2.64 2.64 0.21 0.17
2.99 2.99 3.22 3.22 3.22 0.28 0.23
Calculation for Id and Ir
3.95 3.95 4.29 4.29 4.29 0.41 0.34
Follow GE Curve
5.22 5.22 5.69 5.69 5.69 0.58 0.47
6.40 6.40 7.01 7.01 7.01 0.74 0.61
7.59 7.59 8.33 8.33 8.33 0.90 0.74

Pickup Value Outgen 0.201 A


Pickup Value Neugen 0.201 A
Trip Time
Injected Current (A) Target (ms)
(ms)
0.25 50 26
0.23 50 20

TRIP TARGET 1. Trip Field Discharge Breaker 1


2. Trip Field Discharge Breaker 2
3. Start Breaker Fail
4. Stop Turbine
5. Trip Generator Breaker 1
6. Trip Generator Breaker 2

Hasil Pengujian Accepted

ACCEPTED / REWORK / REPLACE


RECOMMENDATION
(by Quality Control)

Measuring Tool ISA DRTS 66


PLTA ASAHAN 1 PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name
Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
ANNUAL INSPECTION UNIT 1
PLTA ASAHAN 1 - 2022
Description RELAY PROTECTION
Equipment GE G60 MULTILIN
MEASUREMENT SHEET Document Number FU-AS-ELEC-02.017
Issued 11 Agustus 2020
Task No. : Revision : 00 Section : Electric
WO No. : Page :4 Date :

PHASE TOC 1 (GEN UV-OC REM) - 51V (PANEL A)


Nama Modul : Modul relay GE-G60 Generator protection
Pickup Setting : 1.28 pu Source : Neugen (src2)
Curve : Definite Time Ratio CT : 5000/1
Tdm : 0.5

Pick Up Value = 1,280 A


X Fault Current (A) Target Time (s) Time Trip
1.1 1.41 0.5 0.543
1.5 1.92 0.5 0.511
2.0 2.56 0.5 0.521

TRIP TARGET 1. Trip Field Discharge Breaker 1


2. Trip Field Discharge Breaker 2
3. Start Breaker Fail
4. Stop Turbine
5. Trip Generator Breaker 1
6. Trip Generator Breaker 2

PHASE TOC 2 (GEN STAT OL) - 51G (PANEL A)

Pickup Setting : 0.9 pu Source : Neugen (src2)


Curve : Definite Time Ratio CT : 5000/1
Tdm : 9

Pick Up Value = 0.91 A


X Fault Current (A) Target Time (s) Time Trip
1.1 1.0 9 9.0142
1.5 1.37 9 9.0383
2.0 1.82 9 9.0213

TRIP TARGET 1. Trip Field Discharge Breaker 1 : None Of Matrix Output


2. Trip Field Discharge Breaker 2 (Signal Terminal 5X:1 - 5X: 13)
3. Start Breaker Fail
4. Stop Turbine
5. Trip Generator Breaker 1
6. Trip Generator Breaker 2
Hasil Pengujian Accepted
ACCEPTED / REWORK / REPLACE
RECOMMENDATION
(by Quality Control)

Measuring Tool ISA DRTS 66


PLTA ASAHAN 1 PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name
Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
ANNUAL INSPECTION UNIT 1
PLTA ASAHAN 1 - 2022
Description RELAY PROTECTION
Equipment GE G60 MULTILIN
MEASUREMENT SHEET Document Number FU-AS-ELEC-02.017
Issued 11 Agustus 2020
Task No. : Revision : 00 Section : Electric
WO No. : Page :5 Date :

PHASE TOC 1 (GEN UV-OC REM) - 51V (PANEL B)


Nama Modul : Modul relay GE-G60 Generator protection
Pickup Setting : 1.28 pu Source : Neugen (src2)
Curve : Definite Time Ratio CT : 5000/1
Tdm : 0.5

Pick Up Value = 1,282 A


X Fault Current (A) Target Time (s) Time Trip
1.1 1.41 0.5 0.5458
1.5 1.92 0.5 0.5200
2.0 2.56 0.5 0.5256

TRIP TARGET 1. Trip Field Discharge Breaker 1


2. Trip Field Discharge Breaker 2
3. Start Breaker Fail
4. Stop Turbine
5. Trip Generator Breaker 1
6. Trip Generator Breaker 2

PHASE TOC 2 (GEN STAT OL) - 51G (PANEL B)

Pickup Setting : 0.9 pu Source : Neugen (src2)


Curve : Definite Time Ratio CT : 5000/1
Tdm : 9

Pick Up Value = 0.91 A


X Fault Current (A) Target Time (s) Time Trip
1.1 1.0 9 9.1654
1.5 1.37 9 9.0167
2.0 1.82 9 9.0211

TRIP TARGET 1. Trip Field Discharge Breaker 1 : None Of Matrix Output


2. Trip Field Discharge Breaker 2 (Signal Terminal 5X:1 - 5X: 13)
3. Start Breaker Fail
4. Stop Turbine
5. Trip Generator Breaker 1
6. Trip Generator Breaker 2
Hasil Pengujian Accepted
ACCEPTED / REWORK / REPLACE
RECOMMENDATION
(by Quality Control)

Measuring Tool ISA DRTS 66


PLTA ASAHAN 1 PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name
Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
ANNUAL INSPECTION UNIT 1
PLTA ASAHAN 1 - 2022
Description RELAY PROTECTION
Equipment GE G60 MULTILIN
MEASUREMENT SHEET Document Number FU-AS-ELEC-02.017
Issued 11 Agustus 2020
Task No. : Revision : 00 Section : Electric
WO No. : Page :5 Date :

OVERVOLTAGE (59) PANEL A


Nama Modul : Modul relay GE-G60 Generator protection
Pickup Setting : 1.3 pu VT Pri : 13800 V
Time Setting : 0,3 s VT Sec : 110 V

Pick Up Value = 82,5 V


X Fault Voltage (V) Time (s) Actual Time (s) Remark
1.1 90.75 0.3 0.3362 Pass
1.3 107 0.3 0.3298 Pass

TRIP TARGET 1. Trip Field Discharge Breaker 1


2. Trip Field Discharge Breaker 2
3. Start Breaker Fail
4. Stop Turbine
5. Trip Generator Breaker 1
6. Trip Generator Breaker 2

STATOR EARTH FAULT (59N) PANEL A


Nama Modul : Modul relay GE-G60 Generator protection
Pickup Setting : 0.082 pu VT Pri : 13800 V
Time Setting : 5S VT Sec : 110 V

Pick Up Value = 82,5 V


X Fault Voltage (V) Time (s) Actual Time (s) Remark
1.1 9.93 5 5.0256 Pass
1.3 12 5 5.0967 Pass

TRIP TARGET 1. Trip Field Discharge Breaker 1


2. Trip Field Discharge Breaker 2
3. Start Breaker Fail
4. Stop Turbine
5. Trip Generator Breaker 1
6. Trip Generator Breaker 2
Hasil Pengujian Accepted
ACCEPTED / REWORK / REPLACE
RECOMMENDATION
(by Quality Control)

Measuring Tool ISA DRTS 66


PLTA ASAHAN 1 PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name
Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
ANNUAL INSPECTION UNIT 1
PLTA ASAHAN 1 - 2022
Description RELAY PROTECTION
Equipment GE G60 MULTILIN
MEASUREMENT SHEET Document Number FU-AS-ELEC-02.017
Issued 11 Agustus 2020
Task No. : Revision : 00 Section : Electric
WO No. : Page :5 Date :

OVERVOLTAGE (59) PANEL B


Nama Modul : Modul relay GE-G60 Generator protection
Pickup Setting : 1.3 pu VT Pri : 13800 V
Time Setting : 0,3 s VT Sec : 110 V

Pick Up Value = 82,5 V


X Fault Voltage (V) Time (s) Actual Time (s) Remark
1.1 90.75 0.3 0.335 Pass
1.3 107 0.3 0.3358 Pass

TRIP TARGET 1. Trip Field Discharge Breaker 1


2. Trip Field Discharge Breaker 2
3. Start Breaker Fail
4. Stop Turbine
5. Trip Generator Breaker 1
6. Trip Generator Breaker 2

STATOR EARTH FAULT (59N) PANEL B


Nama Modul : Modul relay GE-G60 Generator protection
Pickup Setting : 0.082 pu VT Pri : 13800 V
Time Setting : 5S VT Sec : 110 V

Pick Up Value = 82,5 V


X Fault Voltage (V) Time (s) Actual Time (s) Remark
1.1 9.93 5 5.0465 Pass
1.3 12 5 5.0142 Pass

TRIP TARGET 1. Trip Field Discharge Breaker 1 : None Of Matrix Output


2. Trip Field Discharge Breaker 2 (Signal Terminal 5X:1 - 5X: 13)
3. Start Breaker Fail
4. Stop Turbine
5. Trip Generator Breaker 1
6. Trip Generator Breaker 2
Hasil Pengujian Accepted
ACCEPTED / REWORK / REPLACE
RECOMMENDATION
(by Quality Control)

Measuring Tool ISA DRTS 66


PLTA ASAHAN 1 PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name
Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
ANNUAL INSPECTION UNIT 1
PLTA ASAHAN 1 - 2022
Description RELAY PROTECTION
Equipment GE G60 MULTILIN
MEASUREMENT SHEET Document Number FU-AS-ELEC-02.017
Issued 11 Agustus 2020
Task No. : Revision : 00 Section : Electric
WO No. : Page :5 Date :

LOSS OF EXCITATION (40) PANEL A


Nama Modul : Modul relay GE-G60 Generator protection
VT Pri : 13800 V CT Pri : 5000 A
VT Sec : 110 V CT Sec : 1A
UV Supervision : 0,8 pu

Circle 1 Circle 2
Center : 48 Ω Center : 48 Ω
Radius : 48 Ω Radius : 48 Ω
Delay : 0,5s Delay : 0,5s

Voltage (V) Current (A) Time (s) Actual (s) Remark

45 <00 0,5 <900

45 <1200 0,5 <2100 0.5 0.5414 Pass

45 <2400 0,5 <3300

TRIP TARGET 1. Trip Field Discharge Breaker 1


2. Trip Field Discharge Breaker 2
3. Start Breaker Fail
4. Stop Turbine
5. Trip Generator Breaker 1
6. Trip Generator Breaker 2

Hasil Pengujian Accepted


ACCEPTED / REWORK / REPLACE
RECOMMENDATION
(by Quality Control)

Measuring Tool ISA DRTS 66


PLTA ASAHAN 1 PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name
Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
ANNUAL INSPECTION UNIT 1
PLTA ASAHAN 1 - 2022
Description RELAY PROTECTION
Equipment GE G60 MULTILIN
MEASUREMENT SHEET Document Number FU-AS-ELEC-02.017
Issued 11 Agustus 2020
Task No. : Revision : 00 Section : Electric
WO No. : Page :5 Date :

LOSS OF EXCITATION (40) PANEL B


Nama Modul : Modul relay GE-G60 Generator protection
VT Pri : 13800 V CT Pri : 5000 A
VT Sec : 110 V CT Sec : 1A
UV Supervision : 0,8 pu

Circle 1 Circle 2
Center : 48 Ω Center : 48 Ω
Radius : 48 Ω Radius : 48 Ω
Delay : 0,5s Delay : 0,5s

Voltage (V) Current (A) Time (s) Actual (s) Remark

45 <00 0,5 <900

45 <1200 0,5 <2100 0.5 0.512 Pass

45 <2400 0,5 <3300

TRIP TARGET 1. Trip Field Discharge Breaker 1


2. Trip Field Discharge Breaker 2
3. Start Breaker Fail
4. Stop Turbine
5. Trip Generator Breaker 1
6. Trip Generator Breaker 2

Hasil Pengujian Accepted


ACCEPTED / REWORK / REPLACE
RECOMMENDATION
(by Quality Control)

Measuring Tool ISA DRTS 66


PLTA ASAHAN 1 PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name
Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
ANNUAL INSPECTION UNIT 1
PLTA ASAHAN 1 - 2022
Description RELAY PROTECTION
Equipment GE G60 MULTILIN
MEASUREMENT SHEET Document Number FU-AS-ELEC-02.017
Issued 11 Agustus 2020
Task No. : Revision : 00 Section : Electric
WO No. : Page :5 Date :

VOLTS/ HERTZ (24) STAGE 1 PANEL A


Nama Modul : Modul relay GE-G60 Generator protection
Pickup Setting : 1.21 pu VT Pri : 13800 V
Time Setting : 5S VT Sec : 110 V

Pick Up Value = 76,76 V


X Fault Voltage (V) Time (s) Actual Time (s) Remark
1.1 84.44 5 5.1884 Pass
1.3 99.79 5 5.1676 Pass

TRIP TARGET 1. Trip Field Discharge Breaker 1


2. Trip Field Discharge Breaker 2
3. Start Breaker Fail
4. Trip Generator Breaker 1
5. Trip Generator Breaker 2

VOLTS/ HERTZ (24) STAGE 2 PANEL A


Nama Modul : Modul relay GE-G60 Generator protection
Pickup Setting : 1.32 pu VT Pri : 13800 V
Time Setting : 3S VT Sec : 110 V

Pick Up Value = 83,83 V


X Fault Voltage (V) Time (s) Actual Time (s) Remark
1.1 92.21 3 3.1738 Pass
1.3 108.98 3 3.1936 Pass

TRIP TARGET 1. Trip Field Discharge Breaker 1


2. Trip Field Discharge Breaker 2
3. Start Breaker Fail
4. Trip Generator Breaker 1
5. Trip Generator Breaker 2

Hasil Pengujian Accepted


ACCEPTED / REWORK / REPLACE
RECOMMENDATION
(by Quality Control)

Measuring Tool ISA DRTS 66


PLTA ASAHAN 1 PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name
Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
ANNUAL INSPECTION UNIT 1
PLTA ASAHAN 1 - 2022
Description RELAY PROTECTION
Equipment GE G60 MULTILIN
MEASUREMENT SHEET Document Number FU-AS-ELEC-02.017
Issued 11 Agustus 2020
Task No. : Revision : 00 Section : Electric
WO No. : Page :5 Date :

VOLTS/ HERTZ (24) STAGE 1 PANEL B


Nama Modul : Modul relay GE-G60 Generator protection
Pickup Setting : 1.21 pu VT Pri : 13800 V
Time Setting : 5S VT Sec : 110 V

Pick Up Value = 76,76 V


X Fault Voltage (V) Time (s) Actual Time (s) Remark
1.1 84.44 5 5.1454 Pass
1.3 99.79 5 5.1678 Pass

TRIP TARGET 1. Trip Field Discharge Breaker 1


2. Trip Field Discharge Breaker 2
3. Start Breaker Fail
4. Trip Generator Breaker 1
5. Trip Generator Breaker 2

VOLTS/ HERTZ (24) STAGE 2 PANEL B


Nama Modul : Modul relay GE-G60 Generator protection
Pickup Setting : 1.32 pu VT Pri : 13800 V
Time Setting : 3S VT Sec : 110 V

Pick Up Value = 83,83 V


X Fault Voltage (V) Time (s) Actual Time (s) Remark
1.1 92.21 3 3.1648 Pass
1.3 108.98 3 3.165 Pass

TRIP TARGET 1. Trip Field Discharge Breaker 1


2. Trip Field Discharge Breaker 2
3. Start Breaker Fail
4. Trip Generator Breaker 1
5. Trip Generator Breaker 2

Hasil Pengujian Accepted


ACCEPTED / REWORK / REPLACE
RECOMMENDATION
(by Quality Control)

Measuring Tool ISA DRTS 66


PLTA ASAHAN 1 PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name
Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
ANNUAL INSPECTION UNIT 1
PLTA ASAHAN 1 - 2022
Description RELAY PROTECTION
Equipment GE G60 MULTILIN
MEASUREMENT SHEET Document Number FU-AS-ELEC-02.017
Issued 11 Agustus 2020
Task No. : Revision : 00 Section : Electric
WO No. : Page :5 Date :

GENERATOR UNBALANCE (46) PANEL A


Nama Modul : Modul relay GE-G60 Generator protection
Stage 1 Pickup : 95,58% CT Pri : 5000 A
Stage 1 time : 1,5 s CT Sec : 1A
Stage 2 Pickup : 95,58 %
Stage 2 time : 1,5 s

Pickup 0,817 A
Current (A) Fault Time (S) Actual (S) Remarks

1,0 <00

1,0 <1200 99% 1.5 1.5416 Pass

1,0 <2400

1,5 <00

1,5 <1200 149% 1.5 1.5258 Pass

1,5 <2400

TRIP TARGET 1. Trip Field Discharge Breaker 1


2. Trip Field Discharge Breaker 2
3. Start Breaker Fail
4. Trip Generator Breaker 1
5. Trip Generator Breaker 2

Hasil Pengujian Accepted


ACCEPTED / REWORK / REPLACE
RECOMMENDATION
(by Quality Control)

Measuring Tool ISA DRTS 66


PLTA ASAHAN 1 PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name
Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
ANNUAL INSPECTION UNIT 1
PLTA ASAHAN 1 - 2022
Description RELAY PROTECTION
Equipment GE G60 MULTILIN
MEASUREMENT SHEET Document Number FU-AS-ELEC-02.017
Issued 11 Agustus 2020
Task No. : Revision : 00 Section : Electric
WO No. : Page :5 Date :

GENERATOR UNBALANCE (46) PANEL B


Nama Modul : Modul relay GE-G60 Generator protection
Stage 1 Pickup : 95,58% CT Pri : 5000 A
Stage 1 time : 1,5 s CT Sec : 1A
Stage 2 Pickup : 95,58 %
Stage 2 time : 1,5 s

Pickup 0,817 A
Current (A) Fault Time (S) Actual (S) Remarks

1,0 <00

1,0 <1200 99% 1.5 1.5311 Pass

1,0 <2400

1,5 <00

1,5 <1200 149% 1.5 1.5244 Pass

1,5 <2400

TRIP TARGET 1. Trip Field Discharge Breaker 1


2. Trip Field Discharge Breaker 2
3. Start Breaker Fail
4. Trip Generator Breaker 1
5. Trip Generator Breaker 2

Hasil Pengujian Accepted


ACCEPTED / REWORK / REPLACE
RECOMMENDATION
(by Quality Control)

Measuring Tool ISA DRTS 66


PLTA ASAHAN 1 PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name
Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
ANNUAL INSPECTION UNIT 1
PLTA ASAHAN 1 - 2022
Description RELAY PROTECTION
Equipment GE G60 MULTILIN
MEASUREMENT SHEET Document Number FU-AS-ELEC-02.017
Issued 11 Agustus 2020
Task No. : Revision : 00 Section : Electric
WO No. : Page :5 Date :

UNDER FREQUENCY (81U) PANEL A


Nama Modul : Modul relay GE-G60 Generator protection
Pickup Setting : 1.3 pu VT Pri : 13800 V
Time Setting : 0,3 s VT Sec : 110 V

Pick Up Value = 82,5 V


Frequency Delay Time (s) Actual Time (s) Remark
47.3 1.5 1.5 1.6824 Pass
47 1.5 1.5 1.6842 Pass

TRIP TARGET 1. Trip Field Discharge Breaker 1


2. Trip Field Discharge Breaker 2
3. Start Breaker Fail
4. Stop Turbine
5. Trip Generator Breaker 1
6. Trip Generator Breaker 2

OVER FREQUENCY (810) PANEL A


Nama Modul : Modul relay GE-G60 Generator protection
Pickup Setting : 0.082 pu VT Pri : 13800 V
Time Setting : 5S VT Sec : 110 V

Pick Up Value = 82,5 V


Frequency Delay Time (s) Actual Time (s) Remark
52 1.5 1.5 No trip Pass

TRIP TARGET 1. Trip Field Discharge Breaker 1 None of Matrix Output


2. Trip Field Discharge Breaker 2
3. Start Breaker Fail
4. Stop Turbine
5. Trip Generator Breaker 1
6. Trip Generator Breaker 2
Hasil Pengujian Accepted
ACCEPTED / REWORK / REPLACE
RECOMMENDATION
(by Quality Control)

Measuring Tool ISA DRTS 66


PLTA ASAHAN 1 PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name
Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
ANNUAL INSPECTION UNIT 1
PLTA ASAHAN 1 - 2022
Description RELAY PROTECTION
Equipment GE G60 MULTILIN
MEASUREMENT SHEET Document Number FU-AS-ELEC-02.017
Issued 11 Agustus 2020
Task No. : Revision : 00 Section : Electric
WO No. : Page :5 Date :

UNDER FREQUENCY (81U) PANEL B


Nama Modul : Modul relay GE-G60 Generator protection
Pickup Setting : 1.3 pu VT Pri : 13800 V
Time Setting : 0,3 s VT Sec : 110 V

Pick Up Value = 82,5 V


Frequency Delay Time (s) Actual Time (s) Remark
47.3 1.5 1.5 1.6854 Pass
47 1.5 1.5 1.6904 Pass

TRIP TARGET 1. Trip Field Discharge Breaker 1


2. Trip Field Discharge Breaker 2
3. Start Breaker Fail
4. Stop Turbine
5. Trip Generator Breaker 1
6. Trip Generator Breaker 2

OVER FREQUENCY (810) PANEL B


Nama Modul : Modul relay GE-G60 Generator protection
Pickup Setting : 0.082 pu VT Pri : 13800 V
Time Setting : 5S VT Sec : 110 V

Pick Up Value = 82,5 V


Frequency Delay Time (s) Actual Time (s) Remark
52 1.5 1.5 No trip Pass

TRIP TARGET 1. Trip Field Discharge Breaker 1 None of Matrix Output


2. Trip Field Discharge Breaker 2
3. Start Breaker Fail
4. Stop Turbine
5. Trip Generator Breaker 1
6. Trip Generator Breaker 2
Hasil Pengujian Accepted
ACCEPTED / REWORK / REPLACE
RECOMMENDATION
(by Quality Control)

Measuring Tool ISA DRTS 66


PLTA ASAHAN 1 PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name
Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
ANNUAL INSPECTION UNIT 1
PLTA ASAHAN 1 - 2022
Description RELAY PROTECTION
Equipment GE G60 MULTILIN
MEASUREMENT SHEET Document Number FU-AS-ELEC-02.017
Issued 11 Agustus 2020
Task No. : Revision : 00 Section : Electric
WO No. : Page :5 Date :

REVERSE POWER (32) PANEL A


Nama Modul : Modul relay GE-G60 Generator protection
CT Pri : 5000 A VT Pri : 13800 V
CT Sec : 1A VT Sec : 110 V
32 Stage 1 : 0,09 pu 32 Stage 2 : 0,087 pu
Delay : 1,5S Delay : 1,5S

Pickup 0,099A
Voltage (V) Current (A) Time (s) Actual (s) Remark

63,5 <00 0,21 <00

63,5 <1200 0,21 <1200 1.5 1.5432 Pass

63,5 <2400 0,21 <2400

TRIP TARGET 1. Trip Field Discharge Breaker 1


2. Trip Field Discharge Breaker 2
3. Start Breaker Fail
4. Trip Generator Breaker 1
5. Trip Generator Breaker 2

Hasil Pengujian Accepted


ACCEPTED / REWORK / REPLACE
RECOMMENDATION
(by Quality Control)

Measuring Tool ISA DRTS 66


PLTA ASAHAN 1 PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name
Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
ANNUAL INSPECTION UNIT 1
PLTA ASAHAN 1 - 2022
Description RELAY PROTECTION
Equipment GE G60 MULTILIN
MEASUREMENT SHEET Document Number FU-AS-ELEC-02.017
Issued 11 Agustus 2020
Task No. : Revision : 00 Section : Electric
WO No. : Page :5 Date :

REVERSE POWER (32) PANEL B


Nama Modul : Modul relay GE-G60 Generator protection
CT Pri : 5000 A VT Pri : 13800 V
CT Sec : 1A VT Sec : 110 V
32 Stage 1 : 0,09 pu 32 Stage 2 : 0,087 pu
Delay : 1,5S Delay : 1,5S

Pickup 0,099A
Voltage (V) Current (A) Time (s) Actual (s) Remark

63,5 <00 0,2 <00

63,5 <1200 0,2 <1200 1.5 1.5673 Pass

63,5 <2400 0,22 <2400

TRIP TARGET 1. Trip Field Discharge Breaker 1


2. Trip Field Discharge Breaker 2
3. Start Breaker Fail
4. Trip Generator Breaker 1
5. Trip Generator Breaker 2

Hasil Pengujian Accepted


ACCEPTED / REWORK / REPLACE
RECOMMENDATION
(by Quality Control)

Measuring Tool ISA DRTS 66


PLTA ASAHAN 1 PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name
Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
ANNUAL INSPECTION UNIT 1
PLTA ASAHAN 1 - 2022
Description RELAY PROTECTION
Equipment GE G60 MULTILIN
MEASUREMENT SHEET Document Number FU-AS-ELEC-02.017
Issued 11 Agustus 2020
Task No. : Revision : 00 Section : Electric
WO No. : Page :5 Date :

OUT OF STEP (78) PANEL A


Nama Modul : Modul relay GE-G60 Generator protection
Shape : Quad Inner Limit Angle : 900
Mode : 2 Step Quad Rev Out : 36,58 Ω
Supv : 0,6 pu Outer Right Bld : 40,31 Ω
Fwd Reach : 9,96 Ω Outer Left Bld : 40,31 Ω
Fwd RCA : 900 Inner Right Bld : 13,40 Ω
Rev Reach : 36,58 Ω Inner Left Bld : 13,40 Ω
Rev RCA : 900 Delay : 0,023 S
Outer Limit Angle : 900

Mode Outer
Pickup 1,594A
Voltage (V) Current (A) Time (s) Actual (s) Remark

63,5 <00 1,7 <1800

63,5 <1200 1,7 <3000 0.023 0.03 Pass

63,5 <2400 1,7 <600

Mode Inner
Pickup 4,753A
Voltage (V) Current (A) Time (s) Actual (s) Remark

57,7 <00 4,8 <1800

57,7 <1200 4,8 <3000 0.023 0.03 Pass

57,7 <2400 4,8 <600

TRIP TARGET 1. Trip Field Discharge Breaker 1


2. Trip Field Discharge Breaker 2
3. Start Breaker Fail
4. Trip Generator Breaker 1
5. Trip Generator Breaker 2

Hasil Pengujian Accepted


ACCEPTED / REWORK / REPLACE
RECOMMENDATION
(by Quality Control)

Measuring Tool ISA DRTS 66


PLTA ASAHAN 1 PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name
Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
ANNUAL INSPECTION UNIT 1
PLTA ASAHAN 1 - 2022
Description RELAY PROTECTION
Equipment GE G60 MULTILIN
MEASUREMENT SHEET Document Number FU-AS-ELEC-02.017
Issued 11 Agustus 2020
Task No. : Revision : 00 Section : Electric
WO No. : Page :5 Date :

OUT OF STEP (78) PANEL B


Nama Modul : Modul relay GE-G60 Generator protection
Shape : Quad Inner Limit Angle : 900
Mode : 2 Step Quad Rev Out : 36,58 Ω
Supv : 0,6 pu Outer Right Bld : 40,31 Ω
Fwd Reach : 9,96 Ω Outer Left Bld : 40,31 Ω
Fwd RCA : 900 Inner Right Bld : 13,40 Ω
Rev Reach : 36,58 Ω Inner Left Bld : 13,40 Ω
Rev RCA : 900 Delay : 0,023 S
Outer Limit Angle : 900

Mode Outer
Pickup 1,594A
Voltage (V) Current (A) Time (s) Actual (s) Remark

63,5 <00 1,7 <1800

63,5 <1200 1,7 <3000 0.023 0.03 Pass

63,5 <2400 1,7 <600

Mode Inner
Pickup 4,753A
Voltage (V) Current (A) Time (s) Actual (s) Remark

57,7 <00 4,8 <1800

57,7 <1200 4,8 <3000 0.023 0.03 Pass

57,7 <2400 4,8 <600

TRIP TARGET 1. Trip Field Discharge Breaker 1


2. Trip Field Discharge Breaker 2
3. Start Breaker Fail
4. Trip Generator Breaker 1
5. Trip Generator Breaker 2

Hasil Pengujian Accepted


ACCEPTED / REWORK / REPLACE
RECOMMENDATION
(by Quality Control)

Measuring Tool ISA DRTS 66


PLTA ASAHAN 1 PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name
Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
ANNUAL INSPECTION UNIT 1
PLTA ASAHAN 1 - 2022
Description RELAY PROTECTION
Equipment GE G60 MULTILIN
MEASUREMENT SHEET Document Number FU-AS-ELEC-02.017
Issued 11 Agustus 2020
Task No. : Revision : 00 Section : Electric
WO No. : Page :5 Date :

ROTOR EARTH FAULT (64) PANEL A


Nama Modul : Modul relay GE-G60 Generator protection
Field Ground Injection Frequency : 1 Hz
Field Ground Connection Type : Single Point
Field Ground Stage 1 Pickup : 20 kΩ
Field Ground Stage 1 Delay : 10 S
Field Ground Stage 2 Pickup : 10 kΩ
Field Ground Stage 2 Delay : 9S

Stage 1
Pickup (kΩ) Resistance (kΩ) Time (s) Actual Time (s) Remark

19.99 19.5 10 10.03 Pass

Stage 2
Pickup (kΩ) Resistance (kΩ) Time (s) Actual Time (s) Remark

9.99 9.5 9 10.03 Pass

None Of Matrix Output


(Signal Terminal 5X:1 - 5X: 13)

Hasil Pengujian Accepted


ACCEPTED / REWORK / REPLACE
RECOMMENDATION
(by Quality Control)

Measuring Tool ISA DRTS 66

PLTA ASAHAN 1 PT. PJB SERVICES


Description
Reviewed & Approved by Checked by Inspected by

Signature

Name
Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
ANNUAL INSPECTION UNIT 1
PLTA ASAHAN 1 - 2022
Description RELAY PROTECTION
Equipment GE G60 MULTILIN
MEASUREMENT SHEET Document Number FU-AS-ELEC-02.017
Issued 11 Agustus 2020
Task No. : Revision : 00 Section : Electric
WO No. : Page :5 Date :

ROTOR EARTH FAULT (64) PANEL B


Nama Modul : Modul relay GE-G60 Generator protection
Field Ground Injection Frequency : 1 Hz
Field Ground Connection Type : Single Point
Field Ground Stage 1 Pickup : 20 kΩ
Field Ground Stage 1 Delay : 10 S
Field Ground Stage 2 Pickup : 10 kΩ
Field Ground Stage 2 Delay : 9S

Stage 1
Pickup (kΩ) Resistance (kΩ) Time (s) Actual Time (s) Remark

19.99 19.5 10 10.03 Pass

Stage 2
Pickup (kΩ) Resistance (kΩ) Time (s) Actual Time (s) Remark

9.99 9.5 9 10.03 Pass

None Of Matrix Output


(Signal Terminal 5X:1 - 5X: 13)

Hasil Pengujian Accepted


ACCEPTED / REWORK / REPLACE
RECOMMENDATION
(by Quality Control)

Measuring Tool ISA DRTS 66

PLTA ASAHAN 1 PT. PJB SERVICES


Description
Reviewed & Approved by Checked by Inspected by

Signature

Name
Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
ANNUAL INSPECTION UNIT 1
PLTA ASAHAN 1 - 2022
Description RELAY PROTECTION
Equipment GE G60 MULTILIN
MEASUREMENT SHEET Document Number FU-AS-ELEC-02.017
Issued 11 Agustus 2020
Task No. : Revision : 00 Section : Electric
WO No. : Page :5 Date :

VT FUSE FAILURE PANEL A


Nama Modul : Modul relay GE-G60 Generator protection

SRC 1 VT - FF : Enable
SRC 2 VT - FF : Enable

Source Voltage (V) Indication Remarks

57,7 < 00

Phase 57,7 < 2400 VT - FF Operate Pass

57,7 < 1200

57,7 < 00

Neutral 57,7 < 2400 VT - FF Operate Pass

57,7 < 1200

TRIP TARGET 1. VT - FF Operate

Hasil Pengujian Accepted


ACCEPTED / REWORK / REPLACE
RECOMMENDATION
(by Quality Control)

Measuring Tool ISA DRTS 66


PLTA ASAHAN 1 PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name
Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
ANNUAL INSPECTION UNIT 1
PLTA ASAHAN 1 - 2022
Description RELAY PROTECTION
Equipment GE G60 MULTILIN
MEASUREMENT SHEET Document Number FU-AS-ELEC-02.017
Issued 11 Agustus 2020
Task No. : Revision : 00 Section : Electric
WO No. : Page :5 Date :

VT FUSE FAILURE PANEL B


Nama Modul : Modul relay GE-G60 Generator protection

SRC 1 VT - FF : Enable
SRC 2 VT - FF : Enable

Source Voltage (V) Indication Remarks

57,7 < 00

Phase 57,7 < 2400 VT - FF Operate Pass

57,7 < 1200

57,7 < 00

Neutral 57,7 < 2400 VT - FF Operate Pass

57,7 < 1200

TRIP TARGET 1. VT - FF Operate

Hasil Pengujian Accepted


ACCEPTED / REWORK / REPLACE
RECOMMENDATION
(by Quality Control)

Measuring Tool ISA DRTS 66


PLTA ASAHAN 1 PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name
Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
ANNUAL INSPECTION UNIT 1
PLTA ASAHAN 1 - 2022
Description RELAY PROTECTION
Equipment GE G60 MULTILIN
MEASUREMENT SHEET Document Number FU-AS-ELEC-02.017
Issued 11 Agustus 2020
Task No. : Revision : 00 Section : Electric
WO No. : Page :5 Date :

GROUND OVERCURRENT TOC 1 (60G) PANEL A


Nama Modul : Modul relay GE-G60 Generator protection

Pickup Setting : 0,667 pu Source : SRC 2 (Neutral)


Curve : Definite Time CT ratio : 100/1
Tdm : 0,1

X Fault Current (A) Time (s) Actual (s) Remarks

1.1 0.73 0.1 0.1432 Pass

1.5 1 0.1 0.1852 Pass

2 1.34 0.1 0.1123 Pass

TRIP TARGET 1. Trip Field Discharge Breaker 1


2. Trip Field Discharge Breaker 2
3. Start Breaker Fail
4. Stop Turbine
5. Trip Generator Breaker 1
6. Trip Generator Breaker 2

Hasil Pengujian Accepted


ACCEPTED / REWORK / REPLACE
RECOMMENDATION
(by Quality Control)

Measuring Tool ISA DRTS 66


PLTA ASAHAN 1 PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name
Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
ANNUAL INSPECTION UNIT 1
PLTA ASAHAN 1 - 2022
Description RELAY PROTECTION
Equipment GE G60 MULTILIN
MEASUREMENT SHEET Document Number FU-AS-ELEC-02.017
Issued 11 Agustus 2020
Task No. : Revision : 00 Section : Electric
WO No. : Page :5 Date :

GROUND OVERCURRENT TOC 1 (60G) PANEL B


Nama Modul : Modul relay GE-G60 Generator protection

Pickup Setting : 0,667 pu Source : SRC 2 (Neutral)


Curve : Definite Time CT ratio : 100/1
Tdm : 0,1

X Fault Current (A) Time (s) Actual (s) Remarks

1.1 0.73 0.1 0.1354 Pass

1.5 1 0.1 0.1254 Pass

2 1.34 0.1 0.1132 Pass

TRIP TARGET 1. Trip Field Discharge Breaker 1


2. Trip Field Discharge Breaker 2
3. Start Breaker Fail
4. Stop Turbine
5. Trip Generator Breaker 1
6. Trip Generator Breaker 2

Hasil Pengujian Accepted


ACCEPTED / REWORK / REPLACE
RECOMMENDATION
(by Quality Control)

Measuring Tool ISA DRTS 66


PLTA ASAHAN 1 PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name
Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
ANNUAL INSPECTION UNIT 1
PLTA ASAHAN 1 - 2022
Description RELAY PROTECTION
Equipment GE G60 MULTILIN
MEASUREMENT SHEET Document Number FU-AS-ELEC-02.017
Issued 11 Agustus 2020
Task No. : Revision : 00 Section : Electric
WO No. : Page :5 Date :

Nama Modul : Modul relay GE-G60 Generator protection

TRIP TARGET 1. Trip Field Discharge Breaker 1 : None Of Matrix Output


2. Trip Field Discharge Breaker 2 (Signal Terminal 5X:1 - 5X: 13)
3. Start Breaker Fail
4. Stop Turbine
5. Trip Generator Breaker 1
6. Trip Generator Breaker 2
Hasil Pengujian Accepted
ACCEPTED / REWORK / REPLACE
RECOMMENDATION
(by Quality Control)

Measuring Tool ISA DRTS 66


PLTA ASAHAN 1 PT. PJB SERVICES
Description
Reviewed & Approved by Checked by Inspected by

Signature

Name
Position
Approval Date
PT PEMBANGKITAN JAWA BALI SERVICES
SIAP INTEGRATED MANAGEMENT SYSTEM
ANNUAL INSPECTION UNIT 1
PLTA ASAHAN 1 - 2022
Description RELAY PROTECTION
Equipment GE G60 MULTILIN
DOCUMENTATION SHEET Document Number FU-AS-ELEC-02.017
Issued 11 Agustus 2020
Task No. : Revision : 00 Section : Electric
WO No. : Page :6 Date :

DOC DOC

Foto diambil satu angle Foto diambil satu angle

Pengujian Relay Generator Pengujian Relay Generator

DOC DOC

Foto diambil satu angle Foto diambil satu angle

Pengujian Relay Generator Pengujian Relay Generator

Note :

Tool Camera