ESTIMATING

S.No. Name of Items

Nos Length in meter

Width in Meter

Hight in Meter

Earth Work in Exacavation

23.32

13.64

PCC in Bace

22.32

12.64

0.1

RCC Work

a
b

RCC Work in Raft


RCC Work Wall
Long Wall
Short Wall
Trough
Long Wall
Short Wall

22.32

12.64

0.4

21.52
11.64

0.37
0.37

6.55
6.55

21.52
0.52

0.12
0.12

0.72
0.72

22.32
21.52
11.64

12.64

4
12
2
4

21.52
0.52

Total RCC Wrok


Plaster Work
Raft in plaster
long wall
Short Wall
Trough
long wall
Short Wall
Total Plaster Work

2
6

6.55
6.55
0.72
0.72

Fram Work

Rain Water harvesting tank


S.No. Name of Items
1 Earth Work Exacavation
2

PCC Work In Base

RCC Work
a RCC Work in raft
b RCC Work in Wall
1 Long Wall

Nos Linth in Meter

7.25

Width in Meter
3.1

Hight in Meter
4.05

7.25

3.1

0.1

7.25

3.1

0.2

6.65

0.25

3.9

2
3
4
5

Short Wall
Short Wall
Short Wall
Short Wall
Total RCC work

Plaster Work
a Plaster in raft top
b long wall outer face
long wall inner face
c short wall outer face
short wall inner face
short wall inner & outer face
short wall inner & outer face
short wall inner & outer face
Total Plaster Work
form Work

2
1
1
1

2
2
2
2

0.25
0.15
0.12
0.12

5.8
6.65
5.8
2.5
2
2
2
2

2
2
2
2
2
2
2

3.9
3.4
2.4
1.4

3.9
3.9
3.9
3.9
3.4
2.4
1.4

Unit

Quantity

636.1696

28.21248

1 Total PCC Work =28.22 cum


100cum volume
1cum are volume
28.22 cum
cement concrete Ratio

112.84992

cement

104.30744
169.25724

cement

1.859328
0.044928

sand

388.318856
M
M

282.1248
563.824
914.904

stone beads
2 Total RCC Work =388.32cum
1cum volume =1.52
388.32 cum volume
cement concrete Ratio

15.4944
1.4976
1777.8448

cement

sand
concrete

3 12 mm thick palaster 1:4


100 qm = 2 cum volume
2/100
cement
Unit
M

Quantity
91.02375
1777.84 qm x.004

2.2475
Sand

4.495

12.9675

Rain Water harvesting tank


1 Total PCC work = 2.25 cum

M
M
M
M
M

3.9
1.02
0.576
0.336
23.2945

M
M
M
M
M
M
M
M
M

11.6
51.87
45.24
19.5
15.6
13.6
9.6
5.6
172.61

1 cum volume =1.52


cement concrete ratio =1:2:4
1cum volume/cement co. ratio
1.52/7 = .21
cement
Sand

2 Total RCC Work =23.30 Cum


1cum Volume =1.52
1:11/2:3
1.52/5.5 =.27
0.27

3 12 mm thick palaster 1:4


100 qm = 2 cum volume
2/100
cement

172.61qm x.004
Sand

152
1.52
28.22

1.25

35.275 Cum

1:02:04
Total volume of PCC / Cement concrete Ratio
35.27/7

1.52

29

145 Bag

10 cum

20 cum

388.32 590.2464

1:11/2:3
total RCC volume/total cement concrete
590.24/5.5

107.31

29 3111.99 bag

107.31

1.5 160.965 cum

107.31

321.93 cum

0.02
1 qm volume/total ratio
0.02/5 = 0.004
7.12

29

206.48 bag

7.12

28.48 cum

0.21

2.5

0.525

0.52

1.04 Cum

0.52

2.08 Cum

6.3

29

182.7

Bag

6.3

1.5

9.45

Cum

6.3

18.9

Cum

0.69

29

20.01 bag

0.69

2.76 cum

23.3

29 15.2 Bag

0.02
1 qm volume/total ratio
0.02/5 = 0.004

20
182.7
15.2
217.9
say 220
Bag
1.04
9.45
2.76
13.25 Cum

18.9
2.08
20.98 Cum