SAIC NUMBER
DATE APPROVED
QR NUMBER
SAIC-A-2013
WBS / BI / JO NUMBER
25-May-05
MECH.
CONTRACTOR / SUBCONTRACTOR
EQUIPMENT ID NUMBER(S) LAYOUT DRAWING NUMBER SCHEDULED INSPECTION DATE & TIME SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO INSPECTION LEVEL
EQPT CODE
SYSTEM ID.
PLANT NO.
ACTUAL INSPECTION DATE & TIME SAUDI ARAMCO ACTIVITY NUMBER CONTRACTOR INSPECTION LEVEL
ACCEPTANCE CRITERIA
REFERENCE
PASS
FAIL
N/A
RE-INSP DATE
Pressure Test Procedure addressed safety precautions in GI-0002.102. All in-line valves (if not test isolation) are in PARTIAL open position. (NOTE: It is a "Best Practice" that valves are in partial open position to ensure that all valve cavities are subjected to the system test pressure and to ensure that packings have not leaks. ) When required by the Test procedure, injection of oxygen scavenger, biocide and other treatment chemicals are done using proportion pump and feed continuously at a rate that will provide the specified concentration while filling the system for the hydrostatic test. Chemical injection rates are monitored using displacement gauges. (NOTE: Chemicals shall not be mixed prior to injection. ) Filling & pressurization is done upstream of check valves and at the lowest point of the system being tested. Remove air during filling by providing vents at all high points or by the use of scrapers when provided. (NOTE: Venting may be done by means of vent valves or blinded flanges .) After venting, valves used for venting are placed at partial open position and plugged or blinded. (NOTE: Trapped air are displaced when solid flow of stream of water is observed coming out of the vent. ) In plant areas and shops the test area are marked and warning signs posted to alert approaching personnel. Preliminary check for leaks at 50% of the strength test pressure.
A2
A3
A4 A5
A6
A7
SAES-A-004 Para 8.1.3 GI-002.102, Para. 5.11 GI-002.102, Para. 5.16 GI-002.102, Para. 5.16
A8 A9
The pressure is increased in steps no greater than one-fifth of the strength test pressure after the preliminary check at 50 percent of the A10 strength test pressure. Each step in pressurization is held at minimum of 10 minutes. After test pressure is reached (before inspection), the isolation valve A11 between manifold & the piping system under pressure test is closed & test pump disconnected.
Page 1 of 2
SAIC NUMBER
DATE APPROVED
QR NUMBER
SAIC-A-2013
WBS / BI / JO NUMBER
25-May-05
MECH.
CONTRACTOR / SUBCONTRACTOR
ACCEPTANCE CRITERIA
REFERENCE
PASS
FAIL
N/A
RE-INSP DATE
REFERENCE DOCUMENTS: 1. SA General Instruction Manual GI-002.102, Pressure Testing Safely, (July 22, 2001) 2. SAES-A-004, General Requirements for Pressure Testing, (30 June, 2003) 3. SAES-A-007, Hydrostatic Testing Fluids and Lay-Up Procedures, (28 January, 2004) 4. 32-SAMSS-004, Manufacture of Pressure Vessels, (29 May, 2002)
Contractor / Third-Party
Construction Representative*
Work is Complete and Ready for Inspection: Name, Initials and Date: Name, Initials and Date:
Saudi Aramco
PMT Representative
T&I Witnessed QC Record Reviewed Work Verified
QC Inspector
Performed Inspection Name, Initials and Date: Work / Rework May Proceed
PID Representative
T&I Witnessed Name, Initials and Date: QC Record Reviewed Work Verified
QC Supervisor
Quality Record Approved: Name, Sign and Date: *Person Responsible for Completion of Quality Work / Test
Y = YES
N = NO F = FAILED
Page 2 of 2