(CIVIL BILLS AUDITING)

AIR COOLED STREAM CONDTIONSER - 2 UPTO R/A. BILL -9


ABSTRACT
UNIT

UNIT
RATE (Rs.)

BILLED
QTY AS PER
CONTRACTOR

CHECKED AND
APPROVED
QTY

EXCESS
QTY

BILL
AMOUNT

CHECKED
AMOUNT

EARTH WORK IN EXCAVATION


Upto a depth of 6.00m

CUM

132.000

3248.091

1772.890

1475.201

428748.012

234021.480

A-3
b)

BACK FILLING
Plinth filling in layers of 150mm

CUM

86.000

3010.401

1559.730

1450.671

258894.486

134136.780

B
B-1

PLAIN& REINFORCED CEMENT CONCRETE


PCC M5B as defined by IS:456

CUM

2400.000

43.812

43.590

0.222

105148.800

104616.000

B-3
a)

RCC
For M20C grade concrete

CUM

2950.000

202.879

202.901

-0.022

598493.050

598557.950

B-8

Grouting

CUM

36000.000

0.139

0.139

0.000

5004.000

5004.000

C
a)

STEEL REINFORECEMENTS
With MS Round of all Diameters

TON

6500.000

16.427

16.063

0.364

106775.500

104409.500

D
D-1

INSERT & JIGS


Foundation bolts, Anchors bolts, Nuts, Curb
Angles

TON

24000.000

0.382

0.240

0.142

9168.000

5760.000

E-1

FORM WORK (SHUTTERING)

1)
2)

at and all heights above plinth level


at all heights below plinth level

SQM
SQM

400.000
325.000

249.773
439.362

228.864
438.471

20.909
0.891

99909.200
142792.650

91545.600
142503.075

CODE.
NO.
A-1
a)

DESCRIPTION OF ITEM

Rs. 1,754,933.698 Rs. 1,420,554.385

EXCESS
AMOUNT
194726.532

124757.706

532.800

-64.900
0.000

2366.000

3408.000

8363.600
289.575

Rs. 334,379.313