Professional Documents
Culture Documents
Rep Cu 03 001
Rep Cu 03 001
Unit
New Cracker Unit (Note 1) New Substations New Substation 33kV New Lab Area PE3 / PPI / PP2 Areas New Pelletising Area adjacent to Outfall New Effluent Area New Utility Areas OCU New Seawater Basin New Storage Area Quay Area New Silo farms New Product Warehouse
The above geotechnical information for preliminary soil loading is provided by M/S. BOROUGE. 3.0 SITE DESCRIPTION The site lies at Ruwais Refinery, about 250km away from Abu Dhabi City. The existing ground levels at the borehole locations vary from 2.689m to 14.291m relative to Jabel Dhanna Datum. A topographic survey of the site was carried out and reported separately via Report No. T05074. A general site plan showing the boreholes, test pits and other field testing activities locations within project site area is enclosed in Appendix A.
S05000279
Page 3/45