Central Electricity Authority

Requirement of Equipment & Material for Development of Power Sector

CHAPTER -3
REQUIREMENT OF ELECTRICAL EQUIPMENTS

In this Chapter, the requirement of electrical and mechanical equipments has been assessed for power generation stations, both hydro and thermal plants, as well as for power substations. This requirement has been worked out corresponding to the tentative capacity addition during the 11th and 12th Plans. Equipment for nuclear stations has not been considered as the same is separately expected to be done by Nuclear Power Corporation. Also the requirement of equipments and materials for nuclear plants is difficult to estimate which in any case is expected to be 3200 MW and 8800 MW in the 11th and 12th Plans respectively and therefore a small fraction of the total tentative capacity addition. 3.1 REQUIREMENT OF ELECTRICAL EQUIPMENTS FOR GENERATION PLANTS (INCLUDING SWITCHYARD EQUIPMENT)

The estimated requirement of electrical equipments for generation plants coming up during the 11th Plan and 12th Plans has been worked out considering tentative capacity addition identified for these Plans, details of which have been furnished in Chapter 2. Thermal projects for commissioning during the 11th and 12th Plan have been categorized in five major groups on the basis of their unit sizes. In case of thermal plants, requirement of major electrical equipment has been worked out for one unit of each of these categories and subsequently depending on the number of units in the respective categories, the total requirement has been assessed for 11th and 12th Plans. In case of hydro units such categorisation is not tenable since each project is site specific and therefore the total requirement of major equipments has been worked out for the 11 th and 12th Plan. Switchyard equipment at the generating stations has also been included. Details of the above assessment are given below. 3.1.1 Thermal Power Plants (Including Switchyard Equipment) The thermal plants have been categorized into five categories based on the unit size i.e. 660/800 MW, 500 MW, 300/250/210 MW class and 125 MW for coal/lignite plants, and gas/LNG modules. In case of Gas/LNG based power projects, numbers of modules( comprising of 2GTs and 1 ST) corresponding to each project have been assessed for 11th & 12th plans separately and as per the norms of equipment required for a typical 360 MW gas module, the total requirement of electrical equipment has been assessed. The requirement of electrical equipments for switchyards at the generating station has also been indicated. i) Item wise requirement of equipment for 660/800 MW category of thermal plants during 11th and 12th Plans is given in Table 3.1.

3.1

REQUIREMENT OF ELECTRICAL EQUIPMENTS

Central Electricity Authority

Requirement of Equipment & Material for Development of Power Sector

Table-3.1 Requirement of Equipments for 660/800 Mw Coal/Lignite Based Units of 11th Plan and 12th Plan Capacity Addition Programme
Requirement for One unit of 660 MW 11th Plan 12 Units (6 Projects) 12th Plan 40 Units (10 Projects) Total 52 Units (16 Projects)

Item GT* 260MVA Gen V/420/3kV Three phase bank


ST 90/45/45 MVA 132/11.5/11.5 kV

3 1 2 4 8 68 84 146 1404 32 350 100 5 7 3 21 24 8 12 233 367 1 42 12 24 6 6 48 96 816 1008 1752 16848 384 4200 1200 60 84 36 252 288 96 144 2796 4404
18

UT 35MVA Gen V/11.5kV ICT 200MVA 400/132kV Misc. Service Transformer 20 MVA 132/34.5kV Aux. Transformer 11/3.45kV 33kV Switchgear 11 kV Switchgear 3.3 kV Switchgear HT Motors LT Motors LT Transformers LT MCC Panels 415 V Switchgear Panel DC Battery Battery Charger 33 kV Single Core Cable (km) 11kV Single Core Cable (km) 11kV Multi Core Cable (km) 3.3 kV Single Core Cable (km) 3.3 kV Multi Core Cable (km) 1.1 kV Power Cable (km) 1.1 kV Control Cable(km) Emergency DG Set 1500KVA*

130 40 80 10 10 160 320 2720 3360 5840 56160 1280 14000 4000 200 280 120 840 960 320 480 9320 14680 50

172 52 104 16 16 208 416 3536 4368 7592 73008 1664 18200 5200 260 364 156 1092 1248 416 624 12116 19084 68

* 1 no. spare GT and 1 no. spare DG is considered for each project ii) Item wise requirement of electrical equipments for 500 MW category of thermal plants during 11th and 12th Plans is given in Table 3.2.

3.2

REQUIREMENT OF ELECTRICAL EQUIPMENTS

Central Electricity Authority

Requirement of Equipment & Material for Development of Power Sector

Table-3.2 Requirement of Equipment for 500 MW Coal/Lignite Based Units of 11th Plan and 12th Plan Capacity Addition Programme
Requirement for One unit of 500 MW

11th Plan 47 Units (30 Projects)

12th Plan 18 Units (10 Projects)

Total 65 Units (40 Projects)

Item
GT* 200MVA Gen V/420/3kV Three Phase Bank

3 1 1 5 63 66 118 1135 30 287 75 4 6 13 18 12 8 200 375 1

171 47 47 30 235 2961 3102 5546 53345 1410 13489 3525 188 282 611 846 564 376 9400 17625 77

64 18 18 10 90 1134 1188 2124 20430 540 5166 1350 72 108 234 324 216 144 3600 6750 28

235 65 65 40 325 4095 4290 7670 73775 1950 18655 4875 260 390 845 1170 780 520 13000 24375 105

ST 80/40/40MVA 132/11.5/11.5 kV UT 50 MVA Gen V/11.5kV ICT 125 MVA 400/132kV Aux. Transformer 11 kV Switchgear 3.3 kV Switchgear HT Motors LT Motors LT Transformers LT MCC Panels 415 V Switchgear Panel DC Battery Battery Charger 11 V Single Core Cable(km) 11 kV Multi Core Cable( km) 3.3 kV Single Core Cable ( km) 3.3 kV Multi Core Cable (km) 1.1 kV Power Cable( km) 1.1 kV Control Cable (km) Emergency DG Set 1500KVA*

* 1 no. spare GT and 1 no. spare DG have been considered for each project

3.3

REQUIREMENT OF ELECTRICAL EQUIPMENTS

Central Electricity Authority

Requirement of Equipment & Material for Development of Power Sector

iii) Item wise requirement of equipment for 300/250/ 210 MW category of thermal plants during 11th and 12th Plans is given in Table 3.3. Table-3.3 Requirement of Equipment for 300/250/210 MW Class Coal/Lignite Based Units of 11th Plan and 12th Plan Capacity Addition Programme
Requirement for One unit of 300/250/210 MW 1 1 2 1 15 96 93 1041 26 225 75 6 6 2 2 16 16 200 400 1 11th Plan 12th Plan Total 45 Units 14 Units 59 Units (27 Projects) (12 Projects) (31 Projects) 72 45 90 45 675 4320 4185 46845 1170 10125 3375 270 270 90 90 720 720 9000 18000 72 18 14 28 14 210 1344 1302 14574 364 3150 1050 84 84 28 28 224 224 2800 5600 18 90 59 118 59 885 5664 5487 61419 1534 13275 4425 354 354 118 118 944 944 11800 23600 90

Item GT* 315MVA Gen V/237kV Three Phase ST 55/27.5/27.5 MVA 220/6.9/6.9 kV UT 20 MVA Gen V/6.9 kV Misc Service Trans 10MVA 6.6/11.5 11 kV Switchgear 6.6 kV Switchgear HT Motors LT Motors LT Transformers LT MCC Panels 415 V Switchgear Panel DC Battery Battery Charger 11kV Single Core Cable( km) 11kV Multi Core Cable( km) 6.6kV Single Core Cable(km) 6.6kV Multi Core Cable( km) 1.1kV Power Cable (km) 1.1 kV Control Cable(km) Emergency DG Set 1500KVA*

1 no. spare GT and 1 no. spare DG have been considered for each project

iv) Item wise requirement of equipment for 125 MW categories of thermal plants during 11th is given in Table3.4. Requirement of 125 MW sets is nil during the 12th Plan.

3.4

REQUIREMENT OF ELECTRICAL EQUIPMENTS

Central Electricity Authority

Requirement of Equipment & Material for Development of Power Sector

Table-3.4 Requirement of Equipment for 125 MW Coal/Lignite Based Units Of 11th Plan Capacity Addition Programme
Requirement for One unit of 125 MW 1 1 2 1 15 96 45 324 25 17 75 6 6 2 2 16 16 200 400 1 11th Plan 7 Unit ( 4 Projects) 11 7 14 7 105 672 315 2268 175 119 525 42 42 14 14 112 112 1400 2800 11

ITEM GT* 160MVA Three Phase ST 55/27.5/27.5 MVA UT 20MVA Misc Service Trans 20 MVA 11 kV Switchgear 6.6 kV Switchgear HT Motors LT Motors LT Transformers LT MCC Panels 415 V Switchgear Panel DC Battery Battery Charger 11kV Single Core Cable (km) 11kV Multi Core Cable (km) 6.6 kV Single Core Cable (km) 6.6 kV Multi Core Cable (km) 1.1kV Power Cable(km) 1.1 kV Control Cable(km) Emergency DG Set 1500KVA*

* 1 no. spare GT and 1 no. spare DG have been considered for each project v) Item wise requirement of equipment for gas based thermal plants during and 12th Plans is given in Table3.5.

11

th

3.5

REQUIREMENT OF ELECTRICAL EQUIPMENTS

Central Electricity Authority

Requirement of Equipment & Material for Development of Power Sector

Table-3.5 Requirement of Equipment for Gas/LNG Based Units of 11th Plan and 12th Plan Capacity Addition Programme
11th Plan Requirement for One module 9 modules (360 MW) (7 projects) 3 2 13 36 10 17 7 11 1 6 31 200 500 34
18 117 324 90 153 63 99 16 54 279 1800 4500

Item Gen. Transformer (2 nos. 114 MVA & 1 nos.146 MVA) Unit Aux Transformer 20 MVA HT Motors LT Motors LT Transformers 415 V Switchgear Panel DC Battery Battery Charger Emergency DG Set Gen. Circuit Breaker 6.6 kV Switchgear HT Power Cable (km) LT Power & Control Cable (km)

) 1 no. spare GT and 1 no. spare DG have been considered for each project vi) Total requirement of equipment (Item wise) for thermal plants during 12 Plans is given in Table 3.6.
th

11and

3.6

REQUIREMENT OF ELECTRICAL EQUIPMENTS

Central Electricity Authority

Requirement of Equipment & Material for Development of Power Sector

Table-3.6 Total Requirement of Equipment for Thermal I.E. Coal, Lignite, Gas/LNG Based Units of 11th Plan and 12th Plan Capacity Addition Programme
Total Requirement for Gas/LNG Based Plants 34 18

Item GT ST UT ICT Misc Service Trans 20MVA Aux. Transformer 33kV Switchgear 11 kVSwitchgear 6.6 kV Switchgear 3.3 kV Breaker HT Motors LT Motors LT Transformers LT MCC Panels 415 V Switchgear Panel DC Battery Battery Charger 33kV Single Core Cable (km) 11kV Single Core Cable (km) 11kV Multi Core Cable (km) 6.6kV Single Core Cable (km) 6.6kv Multi Core CablE (km) 3.3kV Single Core Cable (km) 3.3kV Multi Core Cable (km) HT Power Cable LT Power&Control Cable (km) Gen. Circuit Breaker 1.1kV Power Cable (km) 1.1kV Control Cable (km) Emergency DG Set 1500KVA

Total Requirement for Coal/ Lignite Based Plants 508 183 301 56 82 533 416 8621 6336 8658 21064 210470 5323 50249 15025 916 1150 156 2069 2550 1056 1056 1196 1144

279 117 324 90 153 63 99

1800 4500 54 38316 69859 274

16

Total 542 183 319 56 82 533 416 8621 6615 8658 21181 210794 5413 50249 15178 979 1249 156 2069 2550 1056 1056 1196 1144 1800 4500 54 38316 69859 290

1 no. spare GT and 1 no. spare DG have been considered for each project

3.7

REQUIREMENT OF ELECTRICAL EQUIPMENTS

Central Electricity Authority

Requirement of Equipment & Material for Development of Power Sector

vii) Requirement of Switchyard equipments for different voltage levels corresponding to the unit size of each generation project have been assessed. For projects having unit size of 800 MW, switchyard equipments at voltage levels 765 kV and 132 kV have been considered. Similarly, for projects having unit size of 660 MW and 500 MW, switchyard equipments at voltage levels 400kV and 132 kV have been considered. For projects having unit size of 300/250/210 MW & Gas modules having unit size of 360 MW, switchyard equipments at voltage levels 220 kV have been considered. For projects having unit size of 125 MW requirement of switchyard equipment has not been considered since it would normally be at a voltage level of lesser than 132 kV. For assessment of electrical equipments for switchyard of generating stations, 6 bays have been considered for each coal/Lignite based project, and 8 bays for each module of gas project. The layout of the substations has been considered according to the prevailing practice for respective voltage levels. A Breaker and a half scheme has been assumed at 765 kV & 400 kV levels. For 220 kV level, Double main and transfer bus scheme has been assumed. Main and transfer bus scheme has been assumed at 132 kV. Requirement of electrical equipment (Item wise) for switchyard associated with thermal plants during 11th and 12th Plans is given in Table3.7 Table-3.7 Requirement of Electrical Equipments for Switchyards associated with Thermal Stations A. 765 kV Switchyard Equipment-Breaker and a half scheme (For projects having unit size of 800 MW) 11th Plan 12th Plan Requirement for Item (2 Projects) (9 Projects) one Bay (12 Bays ) (54 Bays ) Circuit beaker 3 nos. per 2 bays 18 81 Isolators 4 isolators per bay 48 216 Current 2 sets per bay Transformer 24 108 1 set per line bay CVT/PT & 1 set per bus bar 16 72 Lightning arrestor 1 set per bay 12 54 Wave Trap 2 nos. per bay 24 108 400 kV Switchyard Equipments- Breaker and a half scheme (For projects having unit size of 660 MW & 500 MW) 12th Plan 11th Plan Requirement for (11 Item (34 Projects) one Bay Projects) (204 Bays ) (96 Bays ) Circuit beaker 3 nos. per 2 bays 306 99 Isolators 4 isolators per bay 816 264 Current 2 sets per bay 408 132
3.8

Total (11Projects) (66 Bays )


99 264 132 88 66 132

a. b. c. d. e. f. B.

Total
(53 Projects)

(318 Bays )
405 1080 540

a. b. c.

REQUIREMENT OF ELECTRICAL EQUIPMENTS

Central Electricity Authority

Requirement of Equipment & Material for Development of Power Sector

Transformer d. e. f. C. CVT/PT Gapless lightning arrestor Wave Trap 1 set per line bay & 1 set per bus bar 1 set per bay 2 nos. per bay 272 204 88 66
360 270 540

a. b. c. d. e. f. D.

408 132 132 KV Equipments- Main and transfer Scheme (For projects having unit size of 800 MW, 660 MW & 500 MW) 11th Plan 12th Plan Requirement for Item (36 Projects) (20Projects) one Bay (216 Bays ) (120 Bays ) Circuit beaker 1 no. per bay 216 120 Isolators 3 isolators per bay 648 360 Current 1 sets per bay Transformer 216 120 1 set per line bay CVT/PT & 1 set per bus bar 324 180 Gapless lightning 1 set per bay arrestor 216 120 Wave Trap 2 nos. per bay 432 240

Total
(66 Projects)

(336 Bays)
336 1008 336 504 336 672

a. b. c. d. e. f.

220 kV Switchyard equipment-Double main and transfer (For projects having unit size of 300/250 MW & Gas modules having unit size of 360 MW) ) Total 11th Plan 12th Plan Requirement for (46 Item (34 Projects) (4 Projects) one Bay Projects) (218 Bays) (24 Bays) (290 Bays) Circuit beaker 1 nos. per bays 218 24 242 Isolators 3 isolators per bay 654 72 726 Current 1 sets per bay Transformer 218 24 242 1 set per line bay CVT/PT & 1 set per bus bar 320 36 356 Gapless lightning 1 set per bay arrestor 218 24 242 Wave Trap 2 nos. per bay 436 48 484 Note: 1 set = 3 single phase units

3.1.2

Hydro Power Plants( including switchyard equipment)

For hydro plants, requirement of equipment has been assessed corresponding to a capacity addition of 17,189 MW during 11th Plan and a capacity addition of about 30,000 MW during 12th Plan. Since each hydro -plant is site specific; there is no set rule or norms for estimation. The broad basis followed in the estimation of the other components of hydro projects for 11th & 12th Plan is as under.
3.9
REQUIREMENT OF ELECTRICAL EQUIPMENTS

Central Electricity Authority

Requirement of Equipment & Material for Development of Power Sector

i)

Gates & Hoists: The number of radial gates roughly varies between 3 & 14 numbers depending on type of hydro scheme. Number of Gates depends on length of dam and type of scheme i.e. storage scheme or Run-of-River schemes. The number of spillway radial gates is more for storage scheme compared with ROR Scheme. Vertical Lift Gates: Vertical gift gates are normally installed for overflow spillway, intake structures, desilting chamber outlets, surge shaft outlets, draft tube, tail race outfall etc. Depending on type of scheme it may vary between 5 & 20. For ROR scheme with HRT, the number of vertical lift gates is more compared with storage scheme. Hydro Turbine and Auxiliaries (Motors plus Control Centres): One set of Turbine and auxiliaries have been considered for each unit. The MW output rating of turbine shall match unit rating. Main Inlet Valve (MIV): Generally, One MIVS in each unit is provided in penstock except for low head HE schemes/Dam Toe HE Schemes. Digital Governor: One set of Digital Governor with accessories is provided for each Generating Unit. Synchronous Generator and Associated Auxiliaries: The MVA capacity of synchronous generator has been estimated considering power factor of 0.9. Static Excitation System: One set of Excitation Equipment with accessories is considered for each Generating Unit. Dynamic Braking Equipment: Dynamic braking equipment is generally provided with large hydro generating units with high speed machines. The number has been estimated accordingly. Unit Control Board (UCB): One set of UCB is considered with each generating unit. Isolated Phase Bus Duct and terminal / tap-off of equipments: The length of IPBD depends on layout of power house and varies from scheme to scheme. The estimation is based on experience. 11kV/13.8kV/24kV CTs: Number of CTs depends on protection and metering scheme of particular plant, however, for estimation purposes 10 to 19 CT' per phase per unit has been considered depending on unit size. Neutral Grounding Cubicle: One set of Neutral grounding cubicle is considered for each generating unit. 132kV/220kV/400kV Generator Transformers: The MVA Generator transformer rating is normally taken as 110% of generator rating, the same has been considered in estimation.

ii)

iii)

iv) v) vi) vii) viii)

ix) x)

xi)

xii) xiii)

3.10

REQUIREMENT OF ELECTRICAL EQUIPMENTS

Central Electricity Authority

Requirement of Equipment & Material for Development of Power Sector

xiv)

Unit and Line Protection Panels: One set of protection panels are considered each for Generating Units, Bus-bar, outgoing feeder, EHV cable / bus-duct, Reactors etc. Computerized Control System (CCS): One set of CCS equipment has been considered for each hydro station. Air Insulated Switchgear and Gas Insulated Switchgear: GIS has been considered for under-ground 220kV / 400kV switchyard, while conventional outdoor switchyard for surface / semi underground schemes. EOT Cranes: The total installed tonnage capacity of EOT cranes is based on broad estimation of stator and rotor weights, though these weights may vary drastically even for machines of similar rating.

xv) xvi)

xvii)

xviii) EHV, XLPE cables, EHV Bus Duct: The cable requirement depends on layout of power house and varies from scheme to scheme. The estimation is based on experience. xix) Unit Auxiliary and Station Service Transformers: The total capacity of unit and station auxiliary transformers has been considered as 1.2% of installed capacity. 11kV Switchgear Board: The 11kV switchgear boards vary from station to station depending on 11kV scheme. However for estimation purposes two LT boards per unit has been considered. Power and Control Cables: There is no set rule for estimating power and control cable lengths as it depends on layout and control philosophy. The estimation is based on experience. 110V/220V DC System (Batteries, Charger and DCDB): The battery capacity varies between 400AH to 1800AH, and battery chargers from 2 to 4 numbers depending on number of units and total installed capacity.

xx)

xxi)

xxii)

xxiii) Grounding System: The total tonnage of grounding material vary from station to station depending on layout of power plant, fault level, soil resistivity etc. xxiv) DG Sets: The MVA capacity on DG sets for HE plants vary between 500KVA to 2000KVA depending on requirements worked out during detailed engineering. xxv) Illumination System, Fire Protection System, Service Water System, Oil Handling and Purification System, Ventilation System, Air Conditioning System, Lifts, Communication System and Miscellaneous items like Video Camera, Silt Monitoring System, GPS System, Special Cables like OPGW etc.: These systems are provided in power plant as per requirement.

Details of the various equipments are as follows:

3.11

REQUIREMENT OF ELECTRICAL EQUIPMENTS

Central Electricity Authority

Requirement of Equipment & Material for Development of Power Sector

Table-3.8 Total Requirement of Equipment for Hydro Projects of 11th Plan and 12th Plan Capacity Addition Programme
No. 1. Equipment 11th Plan
(17,189 MW)

12th Plan
(30,000 MW)

Total

2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

21 22 23 24

Hydro-Mechanical Gates & Hoist (sets) (i) Radial spillway Gates 276 (ii) Vertical Lift Gates 403 Butterfly Valve (Sets) 31 Main Inlet Valve (Sets) 115 Electro-Mechanical Turbine (MW) 17189 Turbine (No.) 199 Digital Governors (Nos.) 199 Syn. Generator (MVA) 18908 Syn. Generator(No.) 199 Unit Control Board (sets) 199 Motor & Motor Control Centres (Units) 1366 Transformers (UAT & SST) (MVA) 228 Static Excitation System (Sets) 199 Dynamic Braking Isolators (Sets) 60 NG cubicle incl. Transformer (Set) 199 11/13.8 kV/24kV Isolated Phase Bus Ducts (IPBD) (metres) 38367 11/13.8/24 kV CTs ( 1-Phase Units) 9208 SAVT Cubicle (Sets) 199 132kV/220kV/400 kV Generator Transformer (MVA) 21026 11kV Switchgear Boards (Units) 207 132kV/220kV/400 kV Outdoor switchgear (Units) Circuit breaker 476 Capacitor voltage 323 transformer(CVT) EHV Voltage Transformers 161 Lighting Arresters(LA) 967 Isolators 497 EHV Current Transformers 1128 415 V Switchgear Board Units 555 220/400 kV GIS (Bays) 134 EHV XLPE Cable (Km) 42 EHV Bus Duct (Km) 18

482 704 54 200 30000

757 1107 85 315 47,189 549 549 51,907 549 549 3,750 627 549 165 549 105,328 25,280 549 57,723 568

350 350
32999

350 350
2384 398

350
105

350
66962 16072

350
36697 361 831 565 281 1687 868 1968 968 234 73 32

1307 888 443 2654 1365 3096 1523 368 115 51

3.12

REQUIREMENT OF ELECTRICAL EQUIPMENTS

Central Electricity Authority

Requirement of Equipment & Material for Development of Power Sector

3.2

REQUIREMENT OF ELECTRICAL EQUIPMENTS FOR POWER SYSTEM

The requirement of electrical requirement for power system has been estimated based on the transmission expansion plans corresponding to tentative capacity addition during the 11th Plan. In case of 12th Plan, the transmission expansion has been assumed to be same as for the 11th Plan. The transmission expansion plans include the circuit length of transmission lines at respective voltage levels and details of substation requirement for the entire transmission system. Based on the number of substations and the voltage levels at each substation, the total number of bays at each voltage level has been estimated as shown below in the table 3.9. Table 3.9 Total Number of Bays at each Voltage Level

S.N o. 1. 2. 3. 4.

Voltage Level 765 kV 400kV 220kV 132kV

No. of Bays 11 Plan 12th Plan 62 62 774 774 3060 3060 7280 7280
th

Total 124 1548 6120 14560

The layout of the substations has been considered according to the prevailing practice for respective voltage levels. Breaker and half scheme has been assumed at 765 kV & 400 kV level. For 220 kV level, Double main and transfer bus scheme has been assumed. Main and transfer bus scheme has been assumed at 132 kV Based on the substation layout schemes for each voltage level as detailed above, the normative requirement of substation equipment for each bay corresponding to each voltage level have been evolved. The total requirement of substation equipment has been assessed based on these norms. Details of the same are as furnished in the following paras.

3.13

REQUIREMENT OF ELECTRICAL EQUIPMENTS

Central Electricity Authority

Requirement of Equipment & Material for Development of Power Sector

3.2.1

Estimated Requirement of Electrical Equipment for Voltage Level 765 kV & 400 kV

The estimated requirement of electrical equipments for the transmission expansion planned for voltage levels 765 kV & 400 kV for 11th and 12th Plan is given below in the Table 3.10. Table-3.10 Estimated Requirement of Electrical Equipment for Voltage Level 765 kV & 400 kV
765 kV 11th 12th Plan Plan (2007- (2012NORMS 2012) 2017) Total Nos. Total No. of Bays Circuit Breaker Isolator CT PT/CVT Lightening Arrestor Wave Trap 3 nos. per 2 bays 4 isolators per bay 2 sets per/ bay 1 set per line bay & 1 set per bus bar 1 set per bay 2 nos. per bay 62 93 248 124 71 62 124 62 93 248 124 71 62 124 3 nos. per 2 bays 4 isolators per bay 2 sets per bay 1 set per line bay & 1 set per bus bar 1 set per bay 2 nos. per bay 400 kV 11th 12th Plan Plan (2007(20122012) 2017) Total Nos. 774 1161 3096 1548 890 774 1548 774 1161 3096 1548 890 0 774 1548

NORMS

Note: 1 set = 3 single phase units

3.14

REQUIREMENT OF ELECTRICAL EQUIPMENTS

Central Electricity Authority

Requirement of Equipment & Material for Development of Power Sector

3.2.2

Estimated Requirement of Electrical Equipment for Voltage Level 220 kV & 132 kV

The estimated requirement of electrical equipments for the transmission expansion planned for voltage levels 220 kV & 132 kV for 11 th and 12th Plan is given below in the following table 3.11 . Table-3.11 Estimated Requirement of Electrical Equipment for Voltage Level 220 kV & 132 kV for 11th and 12th Plan
220 kV Nos. 132 kV Nos.

11th Plan (20072012)

12th Plan (20122017)

11th Plan (20072012)

Total Nos. Total No. of Bays CB Isolator CT PT/CVT LA Wave Trap 1no. per bay 4 isolators per bay 1 set per bay 1 set per line bay & 1 set per bus bar 1 set per bay 2 nos. per bay 3060 3060 12240 3060 3060 3060 6120 3060 3060 12240 3060 3060 3060 6120 1no. per bay 3 isolators per bay 1 set per bay 1 set per line bay & 1 set per bus bar 1 set per bay 2 nos. per bay

12th Plan (20122017) Total Nos. 7280 7280 21840 7280 7280 7280 14560

7280 7280 21840 7280 7280 7280 14560

Note: 1 set = 3 single phase units 3.2.3 Summary of Requirement of Electrical Equipment for all Voltage Levels (765 kV, 400 kV, 220 Kv & 132 kV) The total requirement of various substation equipments like circuit breaker, isolators etc. as per the transmission expansion plan during 11th & 12th Plan is summarized in Table 3.12.

3.15

REQUIREMENT OF ELECTRICAL EQUIPMENTS

Central Electricity Authority

Requirement of Equipment & Material for Development of Power Sector

Table 3.12 Total Electrical Equipment for Power System S.No. 1. 2. 3. 4. 5. 6. Item Circuit Breaker Isolator CT PT/CVT Lightening Arrestor Wave Trap 11th Plan 11594 37424 12012 11301 11176 22352 12th Plan 11594 37424 12012 11301 11176 22352 Total 23188 74848 24024 22602 22352 44704

While assessing the above requirement, Breaker and Half scheme has been considered for 765 kV & 400 kV level. For 220 kV level, Double Main and Transfer bus scheme has been considered and for 132 kV, Main and Transfer Bus scheme has been considered. SUMMARY In this Chapter, requirement of electrical equipments for hydro and thermal power projects, along with the corresponding switchyard equipments for different voltage levels, coming up during the 11th & 12th Plan have been assessed based on certain norms. The substation equipments have also been estimated as per the transmission expansion plan for 11th and 12th Plan.

3.16

REQUIREMENT OF ELECTRICAL EQUIPMENTS