1

NO 1 2 3 4 5

WORK SCOPE

SKEC: Loading the Bare Pipe, Transportation to KPI KPI: Unloading at the KPI and perform 3L-HDPE coating SKEC: Loading the pipe (3L-HDPE coated), Transportation to IMCO IMCO: Unloading at the IMCO shop and perform the shop fabrication, Hydrotest SKEC: Loading the Fittings & Flanges, Transportation to IMCO IMCO: Unloading the Fittings & Flanges at the IMCO shop and perform the shop fabrication, Hydrotest IMCO: Loading the Pipe Spool, Transportation to NCC for coating NCC: Unloading at the NCC shop and perform internal and external coating NCC: Loading the coated pipe spool IMCO: Transportation to IMCO warehouse or directly to Work site (each GC), Unloading at IMCO's warehouse or W

cation, Hydrotest

ing at IMCO's warehouse or Work SIte