You are on page 1of 5

Email ID: virgotraja@yahoo.

com
Phone NO: +971 564524335
PAINTING, COATING & INSULATION (QA/QC) INSPECTOR

Personal Data Citizenship/


PASS PORT NO. Date of birth CDC NO.
Gender
Z3736836 13th May 1986 Indian /Male MUM 451781

Professional Good work experience as a QA/QC INSPECTOR in PAINTING


Summary COATING & INSULATION. A result oriented professional with
“14 Years” experience as Seeking a challenging position in
the area that encourages growth and leadership
opportunities while utilizing technical expertise, innovative
abilities & interpersonal skills.
Job Objective To share skills & knowledge in the field of assets preservation
whether Marine and onshore facilities, petrochemical &industrial
plants construction and maintenance for the effective control of
corrosion through proper use of protective coatings.

Academia Diploma in Marine Engineering State Board of Technical


Education, Tamilnadu. Year of Passing -2007.

Certifications National Association of Corrosion Engineers (NACE)


NACE Level-2
Certificate no: 38486
Year of Exam: JUNE 2013
Date of Expires: JUNE 2025
Experience “14 Years” experience as QA / QC Painting, Coating & Insulation
Inspector. (“11 Years” experience in Gulf Countries).

Skill Set  Handling EPC Project


 Third Party Inspection 3.2, 2.2
 Pipe line and spool Painting (Internal and External)
 Insulation (hot, cold and Personal Protective Equipment’s)
 Tanks & vessels Painting (Internal and External)
 Pipe line 3LPP, FBE, Internal FBE Coating
 High build polyurethan Coatings (Shop and Field Joint)
 MS Office
Language  English – Professional working proficiency
 Hindi - Professional working proficiency
Proficiency  Tamil - Native / bilingual Proficiency
 Malayalam- Working proficiency
DUITES AND • Familiar with different type of coating systems like
RESPONSIBILI High build polyurethan, Zinc Silicate, Tank internal and
TIES external painting, Wrapping Coating, Polyurethane, Fusion
Bonded Epoxy (FBE) 3LPP, 3LPE, Internal FBE Coating and
Insulation
• Carry out assigned work progress in accordance to
the technical specification and working procedures
• Ensuring that the ITP’s of coatings, Painting &
insulation activities are carried out and reviewing the
reports
• Providing technical support to the project on blasting,
coating and insulation activities.
• Raising Non-conformance report (NCR) and
observation if any violation in quality procedure that
affecting quality such as defect is resulted by painting,
coating, insulation and materials deficiencies and
application malfunctioning.
• Review coating, Painting and Insulation specification
and identify omissions and clarifications
• Coating, Painting and Insulation inspection as per
Based on Shell Project Variation and Shell Design and
Engineering Practice.
• Monitoring the storage conditions of FBE, Adhesive
and Polypropylene as per manufacturing recommendation.
Coating Pre-Qualification witnessed for the FBE coating &
3Layer Polypropylene.
• Fusion Bond Epoxy material lab test witnessed for the
moister content test, Gel time at 205⁰c, Density check and
Thermal Analysis (DSC) test.
• Carry out the inspection for steel shot, grit,
Phosphoric acid, okait, chromide solution, FBE power,
adhesive material, Polypropylene and repair material
randomly checking for material identification of batch
number, manufacturing standard, date of manufacturing
• Adhesive material lab test witnessed for the Density
check, Melt flow rate.
• 3Layer Polypropylene coating lab test witnessed for
Impact Testing, Indentation Resistance (Penetration) Test,
Elongation at break, Cathodic Disbonding Test, Hot Water
Resistance test and Flexibility (Bend) test.
• Polypropylene material lab test witnessed for the
Density check, Melt flow rate.
• Ambient condition checked for the pipe line before
blasting like Relative humidity and Surface temperature,
Cleanliness of the blast cleaned surface check performed.
Basting profile check done for the line pipe, Chloride test
after blasting performed, DFT thickness inspection done
after coating. Witness of Holiday detection done for 3LPP
coated pipe line.
• Check the cleanliness and roughness of blasted
surface as per the specification by Check the Chloride,
Cleanliness and Roughness of blasted surface as per the
specification and using replica tape.
• Witness of Holiday test (Low & High Voltage), Dolly,
Cross cut (adhesion).
• Maintain Calibration certificates of all Painting related
equipment and Paint and insulation material Batch
certificates.
• Punch Clear & Dossier submission.
• Review the isometric drawing piping for temperature
in insulation of the thermal HOT and Cold insulation.
• Surveillance the gab fault of insulation staggers line.
Measuring the standards of length of band or belt inside and
outside alignment of Insulation/Cladding weather jacketing.
• Inspection for flange and valve (Hot and Cold
Insulation Box).
• TML points installation as per specification review by
TML Drawing.
Career Recital Korean Techno Inspection Middle East Co LLC
OCT 2021- Position : Coating inspector (Factory
STIL NOW 3LPP coating TPI 3.2)
Project Undertaken
• EPC for the Provision and Installation of New Bypass
System at MP-21 and Removal of Redundant Lines at Old
MP-21 Station. (Client: GALFAR ENGINEERING &
CONTRACTING L L C, Vendor: NPCC, End user: ADNOC
onshore)
• EPC for BAB Miscellaneous Modifications and
Enhancements Project. (Client: PEG ENGINEERING &
CONTRACTING, Vendor: HILONG PETROLIUM PIPE CO,
End user: ADNOC onshore)
• EPC FOR BU HASA INTEGRATED FIELD DEVELOPMENT
PROJECT. (Client: PERMA PIPE, Vendor: PERMA PIPE,
End user: ADNOC onshore)
• EPC FOR BAB 485 MBD SUSTAINABLE FACILITIES
PROJECT. (Client: ARCHIRODON, Vendor: NPCC, End
user: ADNOC onshore)

SK ENGINEERING & CONSTRUCTION (KUWAIT)


Career Recital
(EPC-Contractor)
SEP 2016-APR
2020 Position : Painting & Insulation
Inspector
Handled sub-contractor: KAEFER, JCC, SBC, NBTC
(Green/Brown field and yard).
Project Undertaken
•Kuwait National Petroleum Company (KNPC) Clean Fuels
Project (CFP)

Career Recital M/S INTEGRATED SPECIALIZED GENERAL


CONTRACTING COMPANY (ABUDHABI)
May 2014 to
Position : QC Painting Inspector
May 2016
Project Undertaken
• Major Refurbishment and Inspection of Cryogenic Storage
Tanks (LPG) in GASCO RUWAIS PLANT
DIVISION(ONSHORE) at Abu Dhabi, UAE.
• Train -2 Major Shutdown in GASCO RUWAIS PLANT
DIVISION at Abu Dhabi, UAE.
• Propane & Butane Refurbishment Storage Tanks Including
Re-Insulation works in GASCO RUWAIS PLANT DIVISION at
Abu Dhabi, UAE.
• Refurbishment of C3, C5, FW Lines, BOG lines &
equipment (ULCS) – at GASCO RUWAIS PLANT DIVISION at
Abu Dhabi, UAE.
Career Recital AL-KUBRA INTERNATIONAL Trading &Contracting Co.
(KUWAIT)
DEC 2010-
MAR 2014 Position : QC Painting Inspector
Project Undertaken
•Effluent Water Injection Phase 1 & Seawater injection
Phase 2- Internal & External painting.
•Petrofac International Ltd.- For KUWAIT OIL COMPANY
Installation of fuel Gas & Gas Oil Pipelines & Pumping
Stations from MAA to Azzor & Shuiba Power Stations-
Internal & External coating of pipes.
•40” Gas Pipeline from BS – 131to LPG Plant at MAA
Internal & External coating of pipes.
•F & K Ibrahim-For Joint Operation JO/HC092/FE09 –
WAFRA TRUNKLINES REPLACEMENT-Internal & External
Painting.
•Hyundai-For KOC Pipeline Project Part A Insulation LSFO,
FG and Gas Oil Pipeline from MAA to Sabiya and Doha
Power Stations-HBP Application for Field Joints 5D Bends.

M/s S. THARTIUS ENGINEERING CONTRACTORS


Career Recital
(INDIA)
JUN 2007-NOV Position : QC Coating Inspector
2010 Project Undertaken
• Indian Oil Corporation (IOC) Fire water tank External
coating & Internal coating.
• Bharat Petroleum Company Limited (BPCL) Fire water tank
External coating & Internal coating, Oil tank External
coating, Fire water pipe line.
• Indo Burma Petroleum Company (IBP)
Fire water tank External coating &internal coating, Oil tank
External coating.
Competent, sincere and hardworking individual. Excellent health. Good team
player, willing to relocate.

Yours faithfully,
(VIRGO THADEU RAJA P.)

You might also like