Professional Documents
Culture Documents
2.4 m
of Node 8 & 9
Footing Ra
Rb
qu
2
TYPE KN
KN KN/m
CF2
559.7
783.7
100
X1
X2
X3
1.20
1.68
Moments at points
Size of Pillar
1.20
0.30
0.30
4.68
2.40
0.978
287.28
-51.08
344.22
M1
-129.28
M2
M3
X from
inface of column A
816.48
0.178
811.94
M4
1018.17
116.35
R
KN/m2
Rb
287 KN
560
400
1.68
1
1.2
3
qu
100 KN/m
Combined Footing(CF1)
1.20
Bending Moment
Diagrams
0
0
KN/m2
2.7
4.376
4.676
300
-51.079
344.224
-129.278
344.224
1000
800
200
-100 1
-51.079
-200
811.943
600
100
02.700
0.178 811.9
2.700 816.5
4.376 1018 1018.168
816.484
4.676
116.4
4.676
0
1200
400
4.376
4.676
3
-129.278
Distance (m)
200
116.350
0.000
0.000
0
Ra 784
Distance (m)
q0 = 100
Cover(mm) 75
fck= 20
fy= 500
Dia of
Footing Ra Rb qu
Overall
Xu,max/d sy1
Eff. Depth
Check for Punching Shear for Column A
Reinft along
Dia of Bars Spacing
Spacing
Bars
length of
K length Width 0.0035/( fy/1.15
Overall
Assume Eff. Peri. Shear
Longer
of bars
of bars
TYPE KN KN
mm
Result
Longer
Footing
N/
m
m 0.0035+ Es +
Dpth
Dia of
Dept of Force
Span Top
(mm)
(mm)
Span
m
sy1)
0.002
h 2*(B+D+2d')
d' Col.
P. Load-Soil
KN
Asty(+)
ly
lx
D mm Bar
mm D-cover-
pr.
Bottom
CF1
784 559.7 120
4.676
2.40
0.46
0.0042
399
400
12 313 1253 ###### Safe in Shear
5786.88
20
50
16
50
400mm
16
125
Top/Bot Bar Comb. along short span
Top Bar Comb. along long span2536.128
16
75
16
50 1690.752
16
125
16
75
Bot. Bar Comb. along long span
16
75
16
125