My Second Summer Co-op Kaitlyn Drew WE ARE MARSHALL
From Coppell, Texas Studies at Texas A&M Bachelors in Chemical Engineering Business & Chemistry Minor Safety Certificate
WE ARE MARSHALL Co-op Learning Experience Silane Process Safety Project
WE ARE MARSHALL Silane Process Safety Project Purpose: To create a safer work environment on the Monosil lines and reduce hazards created with vinyltrimethoxysilane (silane). Scope: (Focus areas) 1. Safety in the Plant 2. Safety in the Storage Building 3. Safety in the Empty Tote Storage Building
WE ARE MARSHALL What is Vinyltrimethoxysilane? WE ARE MARSHALL Preliminary Summer Schedule 5/19/14 5/26/14 6/2/14 6/9/14 6/16/14 6/23/14 6/30/14 7/7/14 7/14/14 7/21/14 7/28/14 8/4/14 Property Insurance Audit Investigation Create List of Improvements Check Budget Find Contractor(s) Award Bids Executive Summary Financial Justification Performance Specs EHS Design Review Launch CER Submit Purchase Orders Date T a s k
Preliminary Gantt Chart-Silane Process Safety Project WE ARE MARSHALL Process Flow Diagram WE ARE MARSHALL Official Scope of Silane Process Safety Project Add ventilation and repair the berms inside the silane storage building Renovate an old building for the empty tote storage by adding berms, repairing garage doors, and adding a ventilation system Move the silane system to the ground level from the mezzanine and fabricate a safer system setup Add pressure switches and gauges inside silane piping to detect leaks Add alarms to indicate possible silane leaks Change out the feed throats from 65 extruders to match 64 Buy new respirators to protect operators
WE ARE MARSHALL Silane Storage Building WE ARE MARSHALL Silane Storage Building
WE ARE MARSHALL Empty Tote Storage WE ARE MARSHALL Inside the Plant WE ARE MARSHALL Items Accomplished Looked at the chemical MSDS and evaluated the most important possible changes necessary for the safety of the plant Had environmental studies done on the air in the silane work areas Received 13 overall quotes for the silane process safety project and am still awaiting 2 quotes Wrote the CER and as much of the Financial Summary as possible without all of the quotes present Completely cleaned and recalibrated 65A Canister and hopper from past silane leaks
WE ARE MARSHALL What I Have Learned How to approach a safety problem How to solve problems How to perform cost-benefit analysis How to define a project scope How to work one-on-one with contractors How to reach out for help WE ARE MARSHALL Thank you for this opportunity to co-op with General Cable!