Silane Process Safety Project

WE ARE MARSHALL
Silane Process Safety Project
Purpose:
To create a safer work environment on the Monosil
lines and reduce hazards created with
vinyltrimethoxysilane (silane).
Scope: (Focus areas)
1. Safety in the Plant
2. Safety in the Storage Building
3. Safety in the Empty Tote Storage Building

WE ARE MARSHALL
What is Vinyltrimethoxysilane?
WE ARE MARSHALL
Preliminary Summer Schedule
5/19/14 5/26/14 6/2/14 6/9/14 6/16/14 6/23/14 6/30/14 7/7/14 7/14/14 7/21/14 7/28/14 8/4/14
Property Insurance Audit
Investigation
Create List of Improvements
Check Budget
Find Contractor(s)
Award Bids
Executive Summary
Financial Justification
Performance Specs
EHS Design Review
Launch CER
Submit Purchase Orders
Date
T
a
s
k

Preliminary Gantt Chart-Silane Process Safety Project
WE ARE MARSHALL
Process Flow Diagram
WE ARE MARSHALL
Official Scope of Silane Process Safety Project
Add ventilation and repair the berms inside the silane
storage building
Renovate an old building for the empty tote storage by
adding berms, repairing garage doors, and adding a
ventilation system
Move the silane system to the ground level from the
mezzanine and fabricate a safer system setup
Add pressure switches and gauges inside silane piping to
detect leaks
Add alarms to indicate possible silane leaks
Change out the feed throats from 65 extruders to match
64
Buy new respirators to protect operators

WE ARE MARSHALL
Silane Storage Building
WE ARE MARSHALL
Silane Storage Building

WE ARE MARSHALL
Empty Tote Storage
WE ARE MARSHALL
Inside the Plant
WE ARE MARSHALL
Items Accomplished
Looked at the chemical MSDS and evaluated the most
important possible changes necessary for the safety of
the plant
Had environmental studies done on the air in the silane
work areas
Received 13 overall quotes for the silane process safety
project and am still awaiting 2 quotes
Wrote the CER and as much of the Financial Summary as
possible without all of the quotes present
Completely cleaned and recalibrated 65A Canister and
hopper from past silane leaks

WE ARE MARSHALL
What I Have Learned
How to approach a safety problem
How to solve problems
How to perform cost-benefit analysis
How to define a project scope
How to work one-on-one with contractors
How to reach out for help
WE ARE MARSHALL
Thank you for this opportunity to
co-op with General Cable!