You are on page 1of 29

Portfolio

Nikita D. Mhaisekar
Sir J.J. College Of Architecture
CONTENTS
- Know your Mohollo.
CONTENTS
- fashion designer's office
Thesis - Center for Children with Autism.
- Transit oriented development.
Interior Design - 2 BHK Apartment
Biennale at Gateway of India.
International Hostel at Kalina Campus.
WorKing drawing
Building construction and building services
Resume
Garbage disposal - Faculty Medal 2012 and IGBC Competition
Redevelopment of Administrative services at Nagaon , Alibaug.
Cultural center for Youth at Byculla.
Town Planning - Township at Khandala.
SITE: ZAOBA WADI ROAD GIRGAUM MUMBAI
SPACES BETWEEN BUILDINGS
BACKGROUND STATEMENT : DEFINING THE PROBLEM
garden
residential
residential
residential
residential
residential
residential residential
residential
main road main road
main road
residential
residential
SITE PLAN
1) the site when visited was unhealthy and filthy as it was stagnated with
food scraps along with waste water from houses as flies and mosquitoes
accumulated on it.
2) this 2.8 to 3m gully was not amenable for public purpose on account of
being dirty even though it was direct connection to the main road.
3) as the windows opened in the gulley the resident of the buildings had
easy accessibility for throwing the waste and water.
OBSERVATIONS
CONCLUSION
1) utilizing the spaces in between the buildings so as to achieve connectivity to the main road.
2) improvisation of the poor hygiene.
3) to increase the green belt zone in the space to achieve ecological balance.
4) composting the food waste into manure.
5) channelisation of the rainwater and household water which can be beneficial for the green belt in the space.
-0.4m
0.0m
12.00m
13.00m
a a'
b b'
plantation at the
edge of the building
facade
g.l
composting bins
gate for allowing discharge of waste to the composting bin which is in use
pipe for emission of methane gas
pipe for discharging rain water in the composting bin
pipe for discharging food waste in the composting bin
gates allowing discharge
of the ready compost
pipe for discharge of water with a faucet to water the plants when required
rainwater down take pipe from chajja also connected to food waste discharge pipe
creepers attached to the window cill with nylon threads
parapet wall
EXISTING BUILDING G+4
composting bins
pipe for discharge of water with
a faucet to water the plants
when required
pipe for emission of methane gas
c
c'
ROAD
EXISTING BUILDING G+3
PLANTATION AT THE END OF
BUILDING FACADE.
PLAN AA' AT 0.85M FROM GRND LEVEL(sc 1:25)
elevation(sc 1:25)
GARBAGE DISPOSAL (MEDIUM SCALE) - Faculty medal 2012 and IGBC competition
SITE: ZAOBA WADI ROAD GIRGAUM MUMBAI
the food scraps and waste water from kitchen are discharged
into the pipe attached to the window cill.
rain water down take pipes from terraces as well as chajja are
connected to the food waste pipe.
the food waste and water from all windows of house are channelized
through a single pipe into the composting bins placed
on the ground level.
the idea of having two composting bins is to allow one bin to undergo the
process of composting and other bin to store the waste until the
compost is ready.
simultaneously the bin which is full of waste later undergoes composting and waste is accumulated in the first bin.
water being accumulated on the top surface inside the composting bins is discharged through the pipe which is used for watering the plantation
on the edge of the building facade.
a vent pipe is provided on the upper level of the bin for emission of toxic gases produced during the process of composting.
an opening is provided on the side surface of the bin to remove the manure when it is ready.
the formed manure is now spread on the plantation.
the creepers from the ground level are grown on the nylon threads attached to the cill of the windows in
the residence.
composting significantly reduces the need for chemical fertilizers,discourages plants,pests,disease,produces
greater crop yields, and purifies contaminated soil.
in essence, composting recycle these basic elements and transforms them into materials that can be
reintroduced into the gardens lifecycle.
wasting nothing in the process.
pipes discharging food waste and
rainwater into the composting bins
plantation at the edge
of the building facade
gates allowing discharge
of the ready compost
pipe for discharge of water
with a faucet to water the
plants when required
gate for allowing discharge
of waste to the composting
bin which is in use
inspection lid
composting bin
composting bin
VIEW OF THE COMPOSTING BINS
WORKING PROCESS
section cc'
3000MM
500MM 500MM
2000MM
(sc 1:100)
700MM
900MM
1000MM
1100MM
conclusion after implementation :
1) the designed space between the buildings is
energy efficient as it is mainly dependent on
the organic resources present in the
surrounding.
2) the rain water as well as the waste water from
household is utilized for watering the plants.
3) the solid food waste stagnated at the surface
of the site is used in preparation of manure by
composting.
4) by implementation of composting and rain
water harvesting gave boost for the
development of green zone in the space.
5) these modifications have made the space
healthy,clean and approachable for public
use.
c
c'
plantation at the edge of the
building facade
rain water down take pipe from
the chajja
chajja
pipe to discharge food waste in
composting bins
rain water down take pipe from
terrace also connected to the
food waste pipe
EXISTING BUILDING G+4
EXISTING BUILDING G+3
ROAD
parapet wall
GARBAGE DISPOSAL (MEDIUM SCALE) - Faculty medal 2012 and IGBC competition
program
Gram Panchayat Office
Talathi office
Multi purpose hall
Office for NGO (Fields -medical, Educational,Women
Empowerment)
Health centre
Education Centre
Commercial Center
Business centre
Facilities for tourists
Out door space for commercial promotion activities
Canteen
Kitchen+ store
Public Toilets as required
Out door sitting spaces
Meeting spaces
Parking spaces- cars, ambulance, two wheelers
mahila
udyog
50
sq.m
business
center
20sq.m
office
20sq.m
multipurpose
hall
100
sq.m
library
and
reading
hall
65sq.m
store
room
6.5sq.m
talathi
office
15sq.m
record
room
6sq.m
his her
her
his
green
room
10sq.m
atm
canteen
27
sq.m
green
room
10sq.m
kitchen
12sq.m
counsellling
room
25sq.m
study
centre
28sq.m
office
16sq.m
meeting
room
18sq.m
upasarpanch
9sq.m
toi
sarpanch
office
15sq.m
record
room
9sq.m
vaccination
room
20sq.m
consulting
room
20sq.m
social
workers
office
16sq.m
waiting
area
25sq.m
up
up
up up
up
up up
up
0.0m
0.6m
0.6m
0.6m
0.6m
0.6m
0.6m
0.6m
0.6m
0.6m
0.6m
0.6m
0.6m
0.75m
0.6m
0.6m
0.6m
0.6m
0.6m
0.6m
0.6m
0.6m
0.6m
0.0m
0.0m
0.0m
0.6m
entry
entry
up
spatial organisation n
s
w e
sun direction
road
site
wind direction
design process:
simplicity :
"effective organizational design"
the rural design need not to be complex as it is used by the public having
simple thoughts and the relationship among the design should be straightforward.
flexibility : every system should be sufficiently flexible to intergrate changes that may
occur in the nature.
reliability : it is the consistency with which the operations are maintained.
acceptability : any design should be designed taking into consideration that it should be
accepted by the people who operates it.
0.0m
0.6m
4.0m
5.5m
7.5m
5.75m
0.0m
0.45m
0.6m
4.0m
5.5m
5.75m
7.5m
section aa'
section bb'
REDEVELOPMENT OF ADMINISTRATIVE SERVICES AT NAGAON. ALIBAUG
REDEVELOPMENT OF ADMINISTRATIVE SERVICES AT NAGAON. ALIBAUG
n
s
e
w
site
spatial organisation
sun direction
wind direction
road
pond
P
O
N
D
entrance
entrance
service entry
zoning
auditorium
admin
theaters and workshop
exhibition space
cafeteria
zone 1
zone 3
zone 1:
zone 2
auditorium has its
separate zone and
entrance combined with
the admin of the
project.
zone 2 : theatres and workshops are public commercial
and learning spaces which has been segregated
differently with a separate private entrance to
the zone.
zone 3 : public
interaction
and leisure
space includes
the exhibition
space,
cafeteria,
amphitheatre
are separately
designed in the
zone having
the view of the
existing water
body in the
site.
south elevation
SITE STUDY
CULTURAL CENTER FOR YOUTH AT BYCULLA (NEW GREAT EASTERN MILLS)
AUDITORIUM
EXHIBITION SPACE
CAFETERIA
AMPHITHEATER
CULTURAL CENTER FOR YOUTH AT BYCULLA (NEW GREAT EASTERN MILLS)
N
0 10 30 50 100 150m
Plot Boundary
1227.6000
722.7000
93.9
72.0
21.6
43.0
80.2
65.6
28.6
51.4
20.2
146.3
57.3
53.2
83.1
79.2
93.8
145.8
211.2
134.4
50.6
63.1
31.9
109.6
38.7
46.9
127.3
20.4
13.7 84.3
88.6
110.9
136.6
20.2
84.2
63.8
50.3 89.0
122.8 225.3
230.8
239.0
184.4
191.7
30.4
51.1
52.6
46.4
173.9
65.8
205.0
273.0
Scale:- 1:2000
96.72
VILLA VILLA VILLA VILLA
VILLA VILLA
ENTRY
AMENITIES
CLUB HOUSE RG
RG
LIVING
ROOM
18
SQ.M
KITCHEN
9
SQ.M
TOI
4
SQ.M
BEDROOM
9
SQ.M
LIVING
ROOM
18
SQ.M
KITCHEN
9
SQ.M
TOI
4
SQ.M
BEDROOM
9
SQ.M
LIVING
ROOM
18
SQ.M
KITCHEN
9 SQ.M
TOI
4 SQ.M
BEDROOM
9 SQ.M
LIVING
ROOM
18
SQ.M
KITCHEN
9 SQ.M
TOI
4 SQ.M
BEDROOM
9 SQ.M
LIVING
ROOM
18
SQ.M
KITCHEN
9
SQ.M
TOI
4
SQ.M
BEDROOM
9
SQ.M
LIVING
ROOM
18
SQ.M
KITCHEN
9
SQ.M
TOI
4
SQ.M
BEDROOM
9
SQ.M
LIVING
ROOM
24
SQ.M
KITCHEN
7
SQ.M
LIVING
ROOM
24
SQ.M
KITCHEN
7
SQ.M
LIVING
ROOM
24
SQ.M
KITCHEN
7
SQ.M
LIVING
ROOM
24
SQ.M
KITCHEN
7
SQ.M
UP
DN
UP
UP
UP
DN
LIVING
ROOM
45
SQ.M
KITCHEN+
DINING
20
SQ.M
TOI
5
SQ.M
TOI
5
SQ.M
BEDROOM
14
SQ.M
BACKYARD
BEDROOM
14
SQ.M BEDROOM
15
SQ.M
BEDROOM
15
SQ.M
TOI
5
SQ.M
TOI
5
SQ.M TERRACE
TERRACE ENTRANCE
FOYER
LIVING
ROOM
16
SQ.M
KITCHEN+
DINING
20
SQ.M
BEDROOM
12
SQ.M
BEDROOM
12
SQ.M
BEDROOM
30
SQ.M
UP
LIVING ROOM
20 SQ.M
KITCHEN+DINING
17 SQ.M
TOI
2.5 SQ.M
TOI
2.5 SQ.M
BEDROOM
12 SQ.M
DN
BEDROOM
15 SQ.M
TOI
2.5 SQ.M
TOI
2.5 SQ.M
BEDROOM
12 SQ.M
UP
LIVING ROOM
20 SQ.M
KITCHEN+DINING
17 SQ.M
TOI
2.5 SQ.M
TOI
2.5 SQ.M
BEDROOM
12 SQ.M
DN
BEDROOM
15 SQ.M
TOI
2.5 SQ.M
TOI
2.5 SQ.M
BEDROOM
12 SQ.M
TWIN BUNGALOWS
VILLAS
TWO BHK APARTMENT
ONE BHK APARTMENT
THREE BHK APARTMENT
ROW HOUSE
TWIN BUNGLOWS
ROW HOUSE
VILLA
1 BHK APARTMENTS
2 BHK APARTMENTS
3 BHK APARTMENTS
TOWN PLANNING - TOWNSHIP AT KHANDALA
(SCALE 1:2000)
COLOUR
CODES
ROUTES
MAJOR ROUTES
MINOR ROUTES
BASE MAP
(SCALE 1:2000)
COLOUR
CODES
EXISTINGLAND USE
RESIDENTIAL
OFFICES
NATURAL AREAS AND OPENSPACES
EDUCATIONAMENITIES
COMMERCIAL
TRANSPORTATIONFACILITIES
SOCIAL AMENITIES
PIE CHART
LAND USE PLAN
(SCALE 1:2000)
COLOUR
CODES EXISTINGLAND USE
RESIDENTIAL
OFFICES
EDUCATIONAMENITIES
COMMERCIAL
TRANSPORTATIONFACILITIES
SOCIAL AMENITIES
MIXED USE
PIE CHART
BUILDING USE PLAN
PIE CHART
(SCALE 1:2000)
COLOUR
CODES
BUILDINGHEIGHTS
GROUND
GROUND +1
GROUND +4
GROUND +7
GROUND +7 AND ABOVE
BUILDING HEIGHT PLAN
(SCALE 1:2000)
COLOUR
CODES
INCOME LEVEL
HIGH CLASS INCOME
GOVERNMENT REVENUE
SUPER CLASS 1 OFFICER INCOME
PIE CHART
SOCIO ECONOMIC PLAN
(SCALE 1:2000)
MAHARSHI KARVE MARG
SHUKLA ROAD
C ROAD
PANDIT SHOBHNATH MISHRA MARG
B ROAD
A ROAD
SITARAM DEORA MARG
VEER NARIMAN ROAD
IMC MARG
IMC MARG
MAHARSHI KARVE ROAD
V THACKERSEY MARG
2ND CROSS ROAD
VEER NARIMAN ROAD
KARMVEER BHAURAO PATIL MARG
MAHATMA GANDHI ROAD
MAHATMA GANDHI ROAD
KARMVEER BHAURAO PATIL MARG
K A R M V E E R B H A U R A O P A T I L M A R G
K A R M V E E R B H A U R A O P A T I L M A R G
A D MELLOW ROAD
LIBRARY STREET
MADAM CAMA ROAD
MADAM CAMA ROAD
MADAM CAMA ROAD
JEEVAN BIMA MARG
JEEVAN
BIMA
M
A R G
JAMSHEDJI TATA ROAD
BABUBHAI M CHINAI ROAD
DINSHAW VACHA ROAD
BHANUSHANKAR YAGNIK ROAD
H T PAREKH MARG
H T PAREKH MARG H T PAREKH MARG
DINSHAW VACHA ROAD
J T S MALANI MARG
MAHARSHI KARVE MARG
DR.KANE ROAD
DR.KANE ROAD
NETAJI SUBHASHCHANDRA ROAD
A ROAD
MAHATMA GANDHI ROAD
UNIVERSITY ROAD
MADAM CAMA ROAD
COLOUR
CODES
ROUTES
MAJOR ROUTES
MINOR ROUTES
ROAD NETWORK PLAN
TOWN PLANNING - KNOW YOUR MOHOLLA (LOCALITY) , CHURCHGATE MUMBAI
TEEN HATH
NAKA JUNCTION
N
SCALE:- 1:4000
SCHOOL
HOSPITAL
SCHOOL
COLLEGE
COLLEGE
HOSPITAL
MARKET
MARKET
FOOD PLAZA
MULTIPLEX
AND
MALL
CINEMAS
MALL
GREEN SPACES
COMMERCIAL
SHOPPING RESTAURANTS COFFEE SHOPS FOOD
COURT
RESIDENTIAL HOTELS
MULTIPLEXES AND MALLS
WATER BODIES FOUNTAINS PUBLIC PLAZAS
PETROL PUMP AND POLICE STATION
GARDENS LAWNS STATUES MURALS
TAXI STAND RICKSHAW STAND PRIVATE CAR
PARKING TWO WHEELER PARKING
1 BHK APARTMENTS
2 BHK APARTMENTS
3 BHK APARTMENTS
1 BHK APARTMENT
2 BHK APARTMENT
3 BHK APARTMENT
4 BHK APARTMENT
E.S.R,ELECTRIC SUBSTATION,WASTE
MANAGEMENT , ETC
18.0000
1.5
1.0 1.0 1.0 6.0 6.0
1.5 2.5 2.5 1.0
3.0 3.0 2.5 2.5
12.0
18M WIDE PRIMARY ROAD 12M WIDE SECONDRY ROAD
ROAD SECTIONS
LEGEND
SITE PLAN
TOWN PLANNING - TRANSIT ORIENTED DEVELOPMENT
TEEN HATH NAKA JUNCTION
SPACE FOR PROPOSED RAILWAY STATION AND TRANSIT PROJECT
N
SCALE:- 1:16000
TOTAL AREA 127 HECTARES APPROX.
TEEN HATH
NAKA JUNCTION
SPACE FOR PROPOSED RAILWAY
STATION AND TRANSIT PROJECT
N
SCALE:- 1:16000
TOTAL AREA 127
HECTARES APPROX.
ROUTE TAKEN BY OUTSTATION BUSES TO BUS DEPOT
AND FURTHUR TO THE EASTERN EXPRESS HIGHWAY.
ROUTE TAKEN FROM EASTERN EXPRESS HIGHWAY TO
THE BUS DEPOT AND RAILWAY STATION AND BACK.
ROUTE TAKEN FROM TAXI STANDS TO MAJOR ROADWAYS.
TEEN HATH
NAKA JUNCTION
SPACE FOR PROPOSED RAILWAY
STATION AND TRANSIT PROJECT
N
SCALE:- 1:16000
TOTAL AREA 127
HECTARES APPROX.
THE SITE IS BEEN DIVIDED IN SECTORS OF LAND OF
AROUND 4 HECTARES.PRIMARY ROAD 18M WIDE DIVIDE THE SITE IN
THESE SECTORS.
EACH SECTOR IS BEEN PROVIDED WITH SELF SUFFICIENT AMOUNT OF
PUBLIC UTILITIES AND AMENITIES ALONG WIT GREEN SPACES.
A TRANSPORTATION UTILITY SERVICE HUB HAS BEEN DESIGNED AROUND
AND UNDER THE RAILWAY STATION SO THAT THE MAJOR ROADS GET DIRECTLY
CONNECTED TO THE EASTERN EXPRESS HIGHWAY WITHOUT ANY PROBLEM OF
TRAFFIC CONGESTION IN THE REST OF THE SITE.
BUS DEPOT AND CAR PARKING BELOW THE RAILWAY STATION
SCHEMATIC SECTION AA'
A'
A
BUS DEPOT AND CAR PARKINGBELOWTHE RAILWAY STATION
RAILWAY STATION
TEEN HATH NAKA JUNCTION
SPACE FOR PROPOSED RAILWAY STATION AND TRANSIT PROJECT
200M
N
SCALE:- 1:4000
TOTAL AREA 127 HECTARES APPROX.
TOWN PLANNING - TRANSIT ORIENTED DEVELOPMENT
INTERIOR DESIGN - 2 BHK APARTMENT
INTERIOR DESIGN - FASHION DESIGNERS OFFICE
CENTER FOR CHILDREN WITH AUTISM
-THERAPEUTIC EDUCATIONAL UNIT UNDER PEDIATRIC MEDICAL CARE FACILITY
CAUSE FOR ACTION
Site based issue- Nanded being a city
where facility for special children is limited
hence, proposing a center where the
treatment,therapy,education,care,rehabilitati-
-on,conduct,training under one roof will
contribute in promotion of the future of these
children.
SURVEY - Response of the guardians faced by
psychiatrists after the diagnosis report
parents are at denial.
they are not ready to accept the fact due to
emotional breakdown.
WHAT IS AUTISM ???
Autism is a complex developmental condition that typically manifests in the first three years of life, and often is evident much
earlier. It causes impairment, or differences from acceptedtypical development, in three main
areas: social understanding, communication, and imagination more specifically in social imagination.
Individuals with autism may show unusual responses to sensations. Any one or more of the senses may be affected. All
these difficulties can be evident in their behaviour, and people with autism may therefore have non-typical ways of relating to
people, objects and events in their environment.
AIM : TO FACILITATE DEVELOPMENT
NATURAL LEARNING ABILITIES IN
CHILDREN AND ADOLESCENTS WITH
MENTAL DISABILITIES
PROGRAMME
Assessments.
Diagnostic Assessment
Functional Assessments
Occupational and Sensory Assessment
Intervention Programmes.
Parent-Child Early Intervention Programme
Educational Intervention Programme
Occupational and Sensory Intervention
Family Support Services.
Family Counseling
Training's.
Guardian training for benefit of their child
Creative learning sessions.
Demonstration spaces.
Nursing.
Social skills training programme.
Home management programme.
SITE :
LAYOUT PLAN OF GOVT
MEDICAL COLLEGE AND
HOSPITAL COMPLEX AT
VISHNUPURI NANDED.
PSYCHIATRIC UNIT
PROPOSED SITE FOR
THE PROJECT
105M
68M
DIAGRAMMATIC ZONING OF THE AREAS
P R O D U C E D B Y A N A U T O D E S K E D U C A T I O N A L P R O D U C T
THESIS - CONCEPTUAL PROCESS
SIGHTSEEING
TAJ
MAHAL
HOTELS
MONUMENT
SHIVAJI PARK MONUMENT
DROP OFF POINT
MATERIALS : Bamboo and
tensile fabric
strong in tension as well as
compression
compressive strength increases as it
gets older
very flexible in 6-12 month of age
hence can be used to create number of
curving forms.rec
JUTE THREADS TO TIE BAMBOO
BAMBOO
GROUTING
SCREWS
PRECAST CONCRETE BLOCK
PLATE NAILED TO PRECAST
CONCRETE BLOCK
joineries in bamboo
fixing of bamboo to the concrete base
tensile fabric :
The roofing frame work of bamboo is covered by structural coated
fabric woven based cloth with technical coating on both sides.
advantages : recyclable.
self cleaning.
improved thermal control.
integrated lighting.
higher acoustics specifications.
PEDESTRIAN MOVEMENT
PEDESTRAIN
MOVEMENT IN
THE GATEWAY PLAZA
PEDESTRAIN
MOVEMENT AFTER THE
IMPLEMENTATION OF
THE STRUCTURE
architects
gallery 1
architects
gallery 2
architects
gallery 3
architects
gallery 4
architects
gallery 5
architects
gallery 6
architects
gallery 7
architects
gallery 8
architects
gallery 9
architects
gallery 10
curators
office
press
office
up
up
up
up
up
0.6m
0.6m
0.6m
ENTRANCE LOUNGE
gallery 1
gallery 6
gallery 7
gallery 5
gallery 8
gallery 9
gallery 10
gallery 12
gallery 14
gallery 15
gallery 18
gallery 17
gallery 16
gallery 3
gallery 4
gallery 2
administration
gallery 13
gallery 11
site store
book store
COMMON LOUNGE
A
A'
B
B'
C
C'
up
100 SQ.M
100 SQ.M
100 SQ.M
100 SQ.M
100 SQ.M
100 SQ.M 100 SQ.M
100 SQ.M
100 SQ.M
100 SQ.M
100 SQ.M
180 SQ.M
100 SQ.M
50 SQ.M
25 SQ.M
75 SQ.M
75 SQ.M
75 SQ.M
75 SQ.M
75 SQ.M
75 SQ.M
75 SQ.M
75 SQ.M
75 SQ.M
75 SQ.M
75 SQ.M
75 SQ.M
75 SQ.M
75 SQ.M
75 SQ.M
75 SQ.M
75 SQ.M
75 SQ.M
150 SQ.M
LECTURE SPACE
BAMBOO
JUTE THREADS
TO TIE BAMBOO
450 MM DEEP I-SECTION
PRECAST
CONCRETE BLOCK
WOODEN BOARDS NAILED
ON I-SECTION SCREWS
PLATE NAILED TO
PRECAST CONCRETE
BLOCK
section
coating
ENTRY AND EXIT FOR THE
PUBLIC TRAVELING THROUGH
THE CATAMARAN
ENTRY AND EXIT FOR
THE VISITORS
TO THE BIENNALE
OR SIGHTSEEING
BIENNALE AT GATEWAY OF INDIA
fixing of bamboo
in roofing
bamboo
tensile fabric
gallery no. 06 book store gallery no. 09
gallery no. 03 ticket
counter
entry
SECTION AA' (1:200)
SECTION BB' ( scale 1:200)
SECTION CC'(scale 1:200)
drop off point
lecture space
entrance lounge gallery no.13
gallery no. 05
gallery no. 08
gallery no. 10
gallery no. 11
site store
ROOF PLAN
BIENNALE AT GATEWAY OF INDIA
4.6M
6.0M
0.6M 0.6M
3.6M
6.6M
9.6M
12.6M
13.1M
OFFICE MEETING ROOM ROOM
ROOM
ROOM
COMMON RECREATIONAL SPACE OF THE FLOOR COMMON RECREATIONAL SPACE OF THE FLOOR
ROOM
ROOM
ROOM
ROOM
ROOM
ROOM
COMMON RECREATIONAL SPACE OF THE FLOOR COMMON RECREATIONAL SPACE OF THE FLOOR
ROOM
ROOM
ROOM
SERVICE ROAD
KITCHEN AND MESS FACILITY
ONE OCCUPANCY ROOMS
ADMINISTRATION,AMENITIES AND UTILITIES
GUEST HOUSE AND WARDEN'S BUNGLOW
SPORTS HUB
FOUR OCCUPANCY ROOMS
TWO OCCUPANCY ROOMS
PUBLIC
ADMINISTRATION
AMENITIES
HEALTHCARE
UTILITIES
ONE SHARING(COUPLE
OCCUPANCY ROOMS)
PARKING
GREEN SPACES
SEMI PUBLIC
RECREATIONAL SPACE
( SPORTS HUB)
BOARD GAME ROOM,GYM,BADMINTON
COURT,INDOOR SWIMMING
POOL,GREEN SPACES.
STAFF QUARTERS.
WARDEN'S BUNGALOW.
GUEST HOUSE.
PRIVATE
TWO SHARING OCCUPANCY ROOMS
FOUR SHARING OCCUPANCY ROOMS
KITCHEN AND MESS FACILITY
NODES AND INTERACTION SPACES
GREEN SPACES
GIRLS BOYS
300 STUDENTS
SINGLE OCCUPANCY
40 STUDENTS = 40 Nos
DOUBLE OCCUPANCY
160 STUDENTS = 80 Nos
FOUR OCCUPANCY
100 STUDENTS = 25 Nos
300 STUDENTS
SINGLE OCCUPANCY
40 STUDENTS = 40 Nos
DOUBLE OCCUPANCY
160 STUDENTS = 80 Nos
FOUR OCCUPANCY
100 STUDENTS = 25 Nos
(600 STUDENTS)
IDEA OF ZONING OF THE SPACES PROVIDED
IN THE GIVEN SEGREGATION
PUBLIC
SEMI PUBLIC
PRIVATE
TWO OCCUPANCY ROOMS
concept
SECTION AA'
TWIN PERSONAL
SPACE AT
MEZZANINE LEVEL
TWIN PERSONAL
SPACE AT LOWER
LEVEL
QUADRUPLET
OCCUPANCY
CONCEPT OF PROVIDING SUFFICIENT TWIN
PERSONAL SPACE IN QUADRUPLET OCCUPANCY.
0.6M
UP
DN
UP
2.8M
UP
DN
UP
COMMON RECREATIONAL SPACE OF THE FLOOR
COMMON RECREATIONAL SPACE OF THE FLOOR
PLAN AT 0.6M FROM GROUND LEVEL
PLAN AT 2.8M FROM GROUND LEVEL
A'
A
A
A'
CONCEPT OF PROVIDING COMMON SPACE FOR
EACH GROUP TO FACILITATE COMMUNITY LIFE.
GROUND FLOOR PLAN
FIRST FLOOR PLAN
SECOND FLOOR PLAN
THIRD FLOOR PLAN
COMMON RECREATIONAL SPACE OF THE FLOOR
COMMON RECREATIONAL SPACE OF THE FLOOR
COMMON RECREATIONAL SPACE OF THE FLOOR
COMMON RECREATIONAL SPACE OF THE FLOOR
IDEA OF PROVIDING COMMON SPACE
IN ELEVATION ON EACH FLOOR
GROUND FLOOR
FIRST FLOOR
SECOND FLOOR
THIRD FLOOR
HEALTH CARE
T.V.ROOM
GENERAL STORE
COMMON LOUNGE
UP
UP
ENTRY
EXIT
SERVICE
ROAD
1.1M
1.1M
ground floor plan( scale 1:500)
NORTH
0.6M
3.6M
6.6M
9.6M
12.6M
13.1M
0.6M
2.8M
7.2M
11.6M
15.0M
17.2M
18.1M
-0.6M
C
C'
E
E'
SECTION CC'
SECTION EE'
INTERNATIONAL YOUTH HOSTEL AT KALINA CAMPUS
INTERNATIONAL YOUTH HOSTEL AT KALINA CAMPUS
WORKING DRAWING OF LOAD BEARING BUNGLOW (TIMBER CONSTRUCTION)
CONTENTS
Setting out plan
Foundation plan
Ground floor plan
First floor plan
Plan at mezzanine floor levelRoof top level
planFlooring system plan
Roofing system plan
Sections
Elevations
Staircase details
50990
30000
40000
50000
NIKITA DEELIP MHAISEKAR
SIGN AND STAMP:
T.Y.B.ARCH
ROLL NO:38
SIR JJ COLLEGE OF ARCHITECTURE
SCALE 1:50
NORTH PLATE NO DATE
SUBJECT: WORKING DRAWING
NO. DATE DESCRIPTION REMARKS
PROJECT: ARCHITECTS OFFICE AND
RESIDENCE
notes:
1.all dimensions are in mm.
2. only written dimensions are to be
followed.
3. do not scale the drawing.
4. any discripancy shall be brought
to the architect's notice
5. for structural details refer to
structural drawings.
6. all dimensions are for unfinished
to unfinished walls.
7. internal plaster 12mm thk.
8. external plaster 19mm thk.
before execution.
2900
10000
4350
1850
3715
1850
9110
4350
8255
1350
13000
8 8
6095
50990
30000
40000
50000
10076
18369
15359
7 7
3660
6660
A C B
A C B
175
175
17250
14450
proposed
bunglow g+1
S.P.1 S.P.2
setting out plan
11121
20m wide road
key plan
01
8039
3m wide gate 3m wide gate
15359
16806
9353
995
57.5
57.5
57.5
350 350
350
NIKITA DEELIP MHAISEKAR
SIGN AND STAMP:
T.Y.B.ARCH
ROLL NO:38
SIR JJ COLLEGE OF ARCHITECTURE
SCALE 1:50
NORTH PLATE NO DATE
SUBJECT: WORKING DRAWING
NO. DATE DESCRIPTION REMARKS
PROJECT: ARCHITECTS OFFICE AND
RESIDENCE
notes:
1.all dimensions are in mm.
2. only written dimensions are to be
followed.
3. do not scale the drawing.
4. any discripancy shall be brought
to the architect's notice
5. for structural details refer to
structural drawings.
6. all dimensions are for unfinished
to unfinished walls.
7. internal plaster 12mm thk.
8. external plaster 19mm thk.
before execution.
A C D F G H B E J
A C D F G H B E J
1
2
3
4
5
6
7
8
1350 1578 2200 1770 1880 1400
THIRD FOOTING
SECOND FOOTING
FIRST FOOTING
150MM THK PCC
FIRST FOOTING FLUSHED
TO BRICK WALL
excavation line
2500
4140
foundation plan
350 thk brick wall
first footing
second footing
third footing
150 thk pcc
first footing
second footing
third footing
150 thk pcc
first footing flushed to
brick wall
section of footing (scale 1:20)
corner detail of footing
of exterior wall (scale 1:10)
1
2
3
4
5
6
7
8
1422
2994
3095
2673
1100
1200
1699
02
17250
14490
2900
5582
8767
4350 8700
230MM THK
RANDOM RUBBLE
100MM THK
P.C.C. BED
RAMMED EARTH
GROUND
LEVEL
150MM THK
P.C.C. BED
TILE
DRY HARD MURUM
OR DEBRIS
150MM THK
P.C.C. BED
C'
DETAIL AT ENTRANCE STEP
SECTION CC'
c
+ 3600
BALCONY
LIVING ROOM KITCHEN &
DINING ROOM
BEDROOM 2
BEDROOM 3
BEDROOM 1
TOILET 3
5500
883
1303
547
5745
1770 1880 1400
3000
3095
2664
4140
1100
1200
1700
A C D F G H B E
A C D F G H B E
3000
225
ENTRANCE
LOBBY 3
100
3280
1770
1471
LOBBY 2
1500
1363
151
2315
1288
TOI 1
2150
2672
2200
2930
2745
934
474 1178
230
4890
422
1 2 3 4 5 6 7 8 9 10
20 19 18 17 16 15 14 13 12 11
300
322
135
470 557
125
4350
3650
377
3300
TOILET 2
3300
2010
636
1110
1000
2374
DUCT1
DUCT2
2500 2200
1850
4000
J
J
1350 1578 1422
5850
17250
2475
3000
3095
2664
4140
1100
1200
1700
17250
4350
3782
6117
3000
1770 1880 1400 2500 2200 1350 1578 1422
1350 9820 3280
NIKITA DEELIP MHAISEKAR
SIGN AND STAMP:
T.Y.B.ARCH
ROLL NO:38
SIR JJ COLLEGE OF ARCHITECTURE
SCALE 1:50
NORTH PLATE NO DATE
SUBJECT: WORKING DRAWING
NO. DATE DESCRIPTION REMARKS
PROJECT: ARCHITECTS OFFICE AND
RESIDENCE
notes:
1.all dimensions are in mm.
2. only written dimensions are to be
followed.
3. do not scale the drawing.
4. any discripancy shall be brought
to the architect's notice
5. for structural details refer to
structural drawings.
6. all dimensions are for unfinished
to unfinished walls.
7. internal plaster 12mm thk.
8. external plaster 19mm thk.
before execution.
first floor plan
DN
UP
3890
9120
6454
O1
1000 2700 1000
1000
2036
310
5500
3780
115
SCHEDULE FOR OPENINGS
SINGLE SHUTTER 40MM THK TEAK WOOD PANELLED DOOR 1000 2100
DOUBLE SHUTTER 40MM THK GLASS DOOR. 2100 1200
SINGLE SHUTTER 38 MM THK. BAKELITE DOOR. 800
type w h no/fl DESCRIPTION
D3
D2
D1
2100
W1
600 1200
1000 1200 DOUBLE SHUTTER T.W.CASEMENT WINDOW WITH 6MM THK GLASS PANELS
FROSTED GLASS 6 MM. THK. FIXED LOUVERED TO T.W. FRAME 900
900
type DESCRIPTION w h cill no/fl
CODE DESCRIPTION
SCHEDULES FOR FLOOR FINISHING
12mm thk internal plaster finished with renovo
plaster in brick finish finished with 2 coats of
primer and 3 coats of lusture paint.
wall dado upto 2.1m of ceramic tiles above dado
10mm neeru faced plaster with acrylic paint with
prior coat of primer and putty.
10 mm thk suspended pop false ceiling
exposed wooden joist finished with french polish.
exposed wooden joist covered with 6mm thk marine ply
finished with 4mm thk veneer and final finish with
melamine polish.
C1
C2
C3
10MM THK. VITRIFIED TILES 600 X 600MM
10MM THK. NON-SKID CERAMIC TILES IN MATT
FINISH 300 X 300MM
10MM THK. GLAZED CERAMIC TILES 600 X 600MM
F1
F2
F3
W2
CODE
CODE
W1
W2
SCHEDULES FOR wall FINISHING
SCHEDULES FOR ceiling FINISHING
15X60X2000MM HIGH COLOURED CERAMIC SKIRTING
TILE. S1
CODE
SCHEDULES FOR SKIRTINGS
S2 15X70X2000MM CERAMIC SMOOTH SURFACE
SKIRTING TILE.
DESCRIPTION
DESCRIPTION
DESCRIPTION
B
A
B'
A'
04
F3 W1
C3 S1
F1 W1
C2 S1
F3 W1
C2 S1
F1 W1
C2 S1
F2 W2
C1 S2
F2 W2
C1 S2
F2 W2
C1 S2
F3 W1
C2 S1
F1 W1
C2 S1
F1 W1
C2 S1
+ 3600
+ 3600 + 3600
+ 3600
+ 3600
+ 3590
+ 3590
+ 3590
1780 1636
14450
2900
5582
8767
4350 8700
1555
1
2
3
4
5
6
7
8
1
2
3
4
5
6
7
8
14
3
6
3
0
NIKITA DEELIP MHAISEKAR
SIGN AND STAMP:
T.Y.B.ARCH
ROLL NO:38
SIR JJ COLLEGE OF ARCHITECTURE
SCALE 1:50
NORTH PLATE NO DATE
SUBJECT: WORKING DRAWING
NO. DATE DESCRIPTION REMARKS
PROJECT: ARCHITECTS OFFICE AND
RESIDENCE
notes:
1.all dimensions are in mm.
2. only written dimensions are to be
followed.
3. do not scale the drawing.
4. any discripancy shall be brought
to the architect's notice
5. for structural details refer to
structural drawings.
6. all dimensions are for unfinished
to unfinished walls.
7. internal plaster 12mm thk.
8. external plaster 19mm thk.
before execution.
SCHEDULE FOR OPENINGS
SINGLE SHUTTER 40MM THK TEAK WOOD PANELLED DOOR 1000 2100
DOUBLE SHUTTER 40MM THK GLASS DOOR. 2100 1200
SINGLE SHUTTER 38 MM THK. BAKELITE DOOR. 800
type w h no/fl DESCRIPTION
D3
D2
D1
2100
W1
600 1200
1000 1200 DOUBLE SHUTTER T.W.CASEMENT WINDOW WITH 6MM THK GLASS PANELS
FROSTED GLASS 6 MM. THK. FIXED LOUVERED TO T.W. FRAME 900
900
type DESCRIPTION w h cill no/fl
CODE DESCRIPTION
SCHEDULES FOR FLOOR FINISHING
12mm thk internal plaster finished with renovo
plaster in brick finish finished with 2 coats of
primer and 3 coats of lusture paint.
wall dado upto 2.1m of ceramic tiles above dado
10mm neeru faced plaster with acrylic paint with
prior coat of primer and putty.
10 mm thk suspended pop false ceiling
exposed wooden joist finished with french polish.
exposed wooden joist covered with 6mm thk marine ply
finished with 4mm thk veneer and final finish with
melamine polish.
C1
C2
C3
10MM THK. VITRIFIED TILES 600 X 600MM
10MM THK. NON-SKID CERAMIC TILES IN MATT
FINISH 300 X 300MM
10MM THK. GLAZED CERAMIC TILES 600 X 600MM
F1
F2
F3
W2
CODE
CODE
W1
W2
SCHEDULES FOR wall FINISHING
SCHEDULES FOR ceiling FINISHING
15X60X2000MM HIGH COLOURED CERAMIC SKIRTING
TILE. S1
CODE
SCHEDULES FOR SKIRTINGS
S2 15X70X2000MM CERAMIC SMOOTH SURFACE
SKIRTING TILE.
DESCRIPTION
DESCRIPTION
DESCRIPTION
05
MEZZANINE FLOOR
90
2592 1170
8000
3650
5500
7782
4132
1 2 3 4 5 6 7 8 9 10
20 19 18 17 16 15 14 13 12 11
300
322
DN
UP 2700
12362
D H E
D H E
F
F
terrace
+ 6590
F3 W1
C3 S1
+ 6500
J
J
8325
plan at mezzanine floor level
1
4
5
6
1
4
5
6
2
0
0
2
0
NIKITA DEELIP MHAISEKAR
SIGN AND STAMP:
T.Y.B.ARCH
ROLL NO:38
SIR JJ COLLEGE OF ARCHITECTURE
SCALE 1:50
NORTH PLATE NO DATE
SUBJECT: WORKING DRAWING
NO. DATE DESCRIPTION REMARKS
PROJECT: ARCHITECTS OFFICE AND
RESIDENCE
notes:
1.all dimensions are in mm.
2. only written dimensions are to be
followed.
3. do not scale the drawing.
4. any discripancy shall be brought
to the architect's notice
5. for structural details refer to
structural drawings.
6. all dimensions are for unfinished
to unfinished walls.
7. internal plaster 12mm thk.
8. external plaster 19mm thk.
before execution.
roof top level plan
SCHEDULE FOR OPENINGS
SINGLE SHUTTER 40MM THK TEAK WOOD PANELLED DOOR 1000 2100
DOUBLE SHUTTER 40MM THK GLASS DOOR. 2100 1200
SINGLE SHUTTER 38 MM THK. BAKELITE DOOR. 800
type w h no/fl DESCRIPTION
D3
D2
D1
2100
W1
600 1200
1000 1200 DOUBLE SHUTTER T.W.CASEMENT WINDOW WITH 6MM THK GLASS PANELS
FROSTED GLASS 6 MM. THK. FIXED LOUVERED TO T.W. FRAME 900
900
type DESCRIPTION w h cill no/fl
CODE DESCRIPTION
SCHEDULES FOR FLOOR FINISHING
12mm thk internal plaster finished with renovo
plaster in brick finish finished with 2 coats of
primer and 3 coats of lusture paint.
wall dado upto 2.1m of ceramic tiles above dado
10mm neeru faced plaster with acrylic paint with
prior coat of primer and putty.
10 mm thk suspended pop false ceiling
exposed wooden joist finished with french polish.
exposed wooden joist covered with 6mm thk marine ply
finished with 4mm thk veneer and final finish with
melamine polish.
C1
C2
C3
10MM THK. VITRIFIED TILES 600 X 600MM
10MM THK. NON-SKID CERAMIC TILES IN MATT
FINISH 300 X 300MM
10MM THK. GLAZED CERAMIC TILES 600 X 600MM
F1
F2
F3
W2
CODE
CODE
W1
W2
SCHEDULES FOR wall FINISHING
SCHEDULES FOR ceiling FINISHING
15X60X2000MM HIGH COLOURED CERAMIC SKIRTING
TILE. S1
CODE
SCHEDULES FOR SKIRTINGS
S2 15X70X2000MM CERAMIC SMOOTH SURFACE
SKIRTING TILE.
DESCRIPTION
DESCRIPTION
DESCRIPTION
12362
5725
F
F
J
J
06
A
A
terrace
B
B
8 8
+ 6590
overhead water tank
+ 9100
5
6
5
6
0
0
0
0
0
NIKITA DEELIP MHAISEKAR
SIGN AND STAMP:
T.Y.B.ARCH
ROLL NO:38
SIR JJ COLLEGE OF ARCHITECTURE
SCALE 1:50
NORTH PLATE NO DATE
SUBJECT: WORKING DRAWING
NO. DATE DESCRIPTION REMARKS
PROJECT: ARCHITECTS OFFICE AND
RESIDENCE
notes:
1.all dimensions are in mm.
2. only written dimensions are to be
followed.
3. do not scale the drawing.
4. any discripancy shall be brought
to the architect's notice
5. for structural details refer to
structural drawings.
6. all dimensions are for unfinished
to unfinished walls.
7. internal plaster 12mm thk.
8. external plaster 19mm thk.
before execution.
100X150 T.W PURLINS.
100X75 T.W COMMON
RAFTERS @400MM C/C.
30MM THK FASCIA BOARD.
150X1000X25 T.W BOARDINGS.
40X 25 T.W BATTENS.
300X450 MANGLORE TILES.
RIDGE TILE.
300MM dia g.i half round
gutter.
50MM THK RIDGE.
100MM DIA DOWNTAKE
RAINWATER PIPE.
roofing system plan
75x150 t.w joists
25mm thk t.w boardings
two layers of bitumen felt
100mm thk brick bat coba
china mosaic tiles
25mm thk screed
150x350 girder
150x250 binder
09
380 380
NIKITA DEELIP MHAISEKAR
SIGN AND STAMP:
T.Y.B.ARCH
ROLL NO:38
SIR JJ COLLEGE OF ARCHITECTURE
SCALE 1:50
NORTH PLATE NO DATE
SUBJECT: WORKING DRAWING
NO. DATE DESCRIPTION REMARKS
PROJECT: ARCHITECTS OFFICE AND
RESIDENCE
notes:
1.all dimensions are in mm.
2. only written dimensions are to be
followed.
3. do not scale the drawing.
4. any discripancy shall be brought
to the architect's notice
5. for structural details refer to
structural drawings.
6. all dimensions are for unfinished
to unfinished walls.
7. internal plaster 12mm thk.
8. external plaster 19mm thk.
before execution.
sections
section AA'
10
ridge cover
manglore tiles
coping 50mm
m.s ladder
vitrified tiles 600x600x10mm
screed 25mm thk
timber boards 25mm thk
t.w joist 75x150
herringbone strutting
t.w railing
p.c.c bed 150mm thk
murum
dry rubble soling
plinth protection 1000mm wide 1000
p.c.c150mm thk
ceramic skirting
screed 25mm thk
internal plaster 12mmthk
external plaster 19mmthk
brick bat coba 250mm thk
300mm dia half round gutter
rain water downtake pipe 100mm dia
t.w panel door
wall dado upto 1200mm above skirting
150x225 trimmer joist
100x75 wall plate
newel post
concrete pad
3100
2100
3000
1500
900
1000 3000
3000
6000
3100
pcc bed 100mm thk for overhead water tank
250
1200
duct wall with exposed brick work
C F B J
C F B J
A
A
NIKITA DEELIP MHAISEKAR
SIGN AND STAMP:
T.Y.B.ARCH
ROLL NO:38
SIR JJ COLLEGE OF ARCHITECTURE
SCALE 1:50
NORTH PLATE NO DATE
SUBJECT: WORKING DRAWING
NO. DATE DESCRIPTION REMARKS
PROJECT: ARCHITECTS OFFICE AND
RESIDENCE
notes:
1.all dimensions are in mm.
2. only written dimensions are to be
followed.
3. do not scale the drawing.
4. any discripancy shall be brought
to the architect's notice
5. for structural details refer to
structural drawings.
6. all dimensions are for unfinished
to unfinished walls.
7. internal plaster 12mm thk.
8. external plaster 19mm thk.
before execution.
sections
section BB'
11
ridge cover
ridge piece
manglore tiles 300x450
t.w battens 40x25
t.w boardings
t.w common rafter 75x100
t.w purlins 100x150
t.w principal rafter 150x100
kingpost roof 8m span at 2650mm c/c
g.i gutter 300 dia
wall plate 75x100
tie beam 100x150
mezzanine floor
r.c.c chajja
r.c.c cill
single shutter 38mm thk bakelite door
single shutter 40mm thk t.w panel door
ceramic skirting
window frame
p.c.c bed 150mm thk
murum
dry rubble soling
plinth protection 1000mm wide
p.c.c150mm thk
screed 25mm thk
duct wall with exposed brick work
ceramic skirting
internal plaster 12mmthk
external plaster 19mmthk
100mm dia rainwater downtake pipe
3000
2607
3000
3500
2150
900
2100
1200
2100
5650
1200
700
A D E H
A D E H
NIKITA DEELIP MHAISEKAR
SIGN AND STAMP:
T.Y.B.ARCH
ROLL NO:38
SIR JJ COLLEGE OF ARCHITECTURE
SCALE 1:50
NORTH PLATE NO DATE
SUBJECT: WORKING DRAWING
NO. DATE DESCRIPTION REMARKS
PROJECT: ARCHITECTS OFFICE AND
RESIDENCE
notes:
1.all dimensions are in mm.
2. only written dimensions are to be
followed.
3. do not scale the drawing.
4. any discripancy shall be brought
to the architect's notice
5. for structural details refer to
structural drawings.
6. all dimensions are for unfinished
to unfinished walls.
7. internal plaster 12mm thk.
8. external plaster 19mm thk.
before execution.
0.0m
0.6m
1.5m
2.7m
4.5m
5.7m
7.5m
10.5m
11.3m ridge cover
ridge piece
manglore tiles roofing
coping
m.s ladder
single shutter t.w panel door
g.i gutter 300 dia
100mm dia rainwater downtake pipe
t.w railing
t.w handrail
duct wall with exposed brick work
brick arch 3m dia
t.w. casement window
r.c.c chajja
exposed stone work
plinth protection
0.0m
0.6m
1.5m
2.7m
3.6m
4.5m
5.7m
7.5m
10.5m
11.3m ridge piece
manglore tiles roofing
g.i gutter 300 dia
100mm dia rainwater downtake pipe
coping 50mm
t.w railing
t.w handrail
projected r.c.c chajja
t.w. casement window
brick arch 3m dia
single shutter t.w panel door
exposed stone work
plinth protection
elevations
12
duct wall with exposed brick work
1 2 3 4 5 6 7 8 9 10
20 19 18 17 16 15 14 13 12 11
450x250x 230 stone pad
150x225 trimmer joist
nosing line
riser
tread 300mm
75x150 t.w joist
50x75 t.w handrail
newel post 100x100
triangular blocks 50x75
central carriage 100x75
wall plate 75x100
wall stringer 250x50
350MM THK BRICK WALL
rough bracket 25mm thk
up
1500
1000
3000
3000
6000
murum
dry rubble packing
100mm thk p.c.c
25mm thk screed
10mm thk tiles
ceramic skirting
bull nose step
triangular blocks 50x75
rough bracket 25mm thk
newel post
t.w railing
t.w handrail
internal plaster 12mm thk
external plaster 19mm thk
150x225 trimmer joist
wall plate 75x100
75x150 t.w joist
timber boards 25mm thk
riser
nosing
tread
300
150
ROUGH BRACKET 25MM THK
TRIANGULAR BLOCKS 50X75
T. W. STRINGER 250X50MM
CENTRAL CARRIAGE 100X75MM
NEWEL POST 100X100MM
BULL NOSE STEP
R.C.C. STIFFNER 150MM THK
DRY RUBBLE PACKING
MURUM
SCREED 20MM THK
P.C.C. 100MM THK
450x250x230 stone pad
150x225 trimmer joist
75x150 t.w joist
wall plate 75x100
12mm thk polysterine layer
25mm thk timber boards
staircase details
staircase plan
SECTION GG'
G G'
DETAIL AT "h"
H
FLOORING PLAN OF LANDING
CENTRAL CARRIAGE 100X75MM
15
NIKITA DEELIP MHAISEKAR
SIGN AND STAMP:
T.Y.B.ARCH
ROLL NO:38
SIR JJ COLLEGE OF ARCHITECTURE
SCALE 1:25
NORTH PLATE NO DATE
SUBJECT: WORKING DRAWING
NO. DATE DESCRIPTION REMARKS
PROJECT: ARCHITECTS OFFICE AND
RESIDENCE
1.all dimensions are in mm.
2. only written dimensions are to be
followed.
3. do not scale the drawing.
4. any discripancy shall be brought
to the architect's notice
5. for structural details refer to
structural drawings.
6. all dimensions are for unfinished
to unfinished walls.
7. internal plaster 12mm thk.
8. external plaster 19mm thk.
before execution.
CONTENTS
Rcc portal frame
Folded plate roof
Barrel vault roof
AC ducting plan,sections and elevation
Fire fighting - plan,section and details
Fire fighting - terrace floor plan and details
Heating system for bungalow
Auditorium acoustics with details
Fire fighting - floor plans
BUILDING CONSTRUCTION
Steel portal frame
BUILDING SERVICES
Mechanical ventilation of basement
BUILDING CONSTRUCTION AND BUILDING SERVICES
PLATE NO. ROLL NO.
38
SIGN AND STAMP
01
DETAIL AT R
SCALE - 1 :20
ADJUSTABLE SERRATED RIDGE PIECE
CORRUGATEDPOLYCARBONATE SHEETS (2.8M
X 1.4M)
OVERLAP - 150
SIDE LAP - 150
STEEL HINGES
2 LEAVES EACH
100 X 60 BOX
SECTION FOR
MOUNTING OF
PURLIN
85 X 45 BOX
SECTION
20 DIA TUBULAR
BRACING
60 DIA TUBULAR
MEMBER
600 DEEP
B.U. PURLINS
10 MM THK
PLATES WELDED
TO FORM SHOE
25 DIA
STEEL PIN
80 X 80
BOTTOM CHORD
80 X 80 BOX
SECTION
30 DIA TUBULAR
LATTICE MEMBERS
500 WIDE
GUTTER
230X375
BEAM
DOVETAIL
SS FIXING
ALUMINIUM
FRAMED FIXED
GLASS WINDOW
80 X 80 BOX
SECTIONS 2 NOS.
DETAIL AT T
SCALE - 1 :20
80 X 80 TOP
CHORDS 2 NOS.
80 X 80
BOTTOM CHORD
30 DIA TUBULAR
LATTICE MEMBERS
600 DEEP
B.U. PURLINS
DETAIL AT S
SCALE - 1 :20
600 X 600 RCC
COLUMN
80 X 80
BOX
SECTION
STRUCTURAL SLAB
12 MM ANCHOR BAR
PLINTH BEAM
20 DIA
ANCHOR
BOLTS
10 MM THK
MS PLATE
8MM TRIANGULAR
SUPPORTS
25 DIA STEEL PIN
50THK FF
2 LEAVES
3 LEAVES
STEEL HINGE
PLATES
10 MM THK PLATES
WELDED TO FORM SHOE
230 MM BRK WALL 80 X 80 BOX
SECTION
30 DIA TUBULAR
LATTICE MEMBERS
SCALE - 1 :20 DETAIL AT P
600 DEEP
B.U. PURLINS
7000
7000
7000
35000
FOUNDATION
600X600 RCC BASE
PORTAL FRAME
CORRUGATED
POLYCARBONATE SHEETS
150 OVERLAP
2800X1400
ADJ USTABLE SERRATED
RIDGE PIECE
600 DEEP BU PURLINS
80X80 TOP CHORD
80X80 BOTTOMCHORD
30 DIA TUBULAR
LATTICE MEMBER
PLINTH
BEAM
FOUND-
ATION
12000
34800
R
S
T
P
600 DEEP B.U. PURLINS
2800
10 THK
BASE PLATE
600
80 X 80 BOX
SECTION
30 DIA TUBULAR
LATTICE MEMBERS
100 X 60 BOX SECTION FOR
MOUNTING OF PURLIN
60 DIA
TUBULAR
MEMBER
85 X 45 BOX
SECTION
20 DIA
TUBULAR
BRACING
80 X 80 TOP
CHORDS 2 NOS.
80 X 80
BOTTOM
CHORD
PIN JOINT
10 MM THK
PLATES
80 X 80 TOP
CHORDS 2 NOS.
80 X 80
BOTTOM
CHORD
DETAILED PLAN OF PORTAL FRAME (SCALE - 1 : 50)
600
R P
600
PLAN AT P
(SCALE - 1 :25)
20 DIA
TUBULAR
BRACING
60 DIA
TUBULAR
MEMBER
10 THK
BASE PLATE
80 X 80 BOX
SECTION
VIEW OF DETAIL AT 'P'
WASHER
HINGE PLATES
25 DIA STEEL PIN
NUT
10 MM THK
MS PLATE
10 MM THK PLATES
WELDED TO FORM SHOE
20 DIA REINF. BARS
AT C/C BOTHWAYS
8 LINKS
AT 150
C/C
10 DIA
EXTRA
BARS
8 DIA LINKS
AT 150 C/C
16 REINF.
BARS IN BEAM
230 X 450
PLINTH BEAM
VIEW OF DETAIL AT 'R'
50 O SIEVE TUBE /
15 THK BASE PLATE
TOP CHORD
100 O TUBE
20 O BRACING
BOTTOM CHORD-100 O
TUBE
170 X95 BOX
SECTION 10 THK
FOR MOUNTING
OF PURLIN
50 NUT
WASHER
15 THK M.S. PLATE
50 PIN
75 TUBE(B.U.PURLIN)
20 BRACING
/
/
/
PLAN AT R SCALE - 1 :20
PIN JOINT
80 X 80 TOP
CHORDS 2 NOS.
80 X 80
BOTTOM
CHORD
10 MM THK
PLATES
85 X 45 BOX
SECTION 600 DEEP B.U. PURLINS
30 DIA TUBULAR
LATTICE MEMBERS
100 X 60 BOX SECTION FOR
MOUNTING OF PURLIN
PLATE NO. ROLL NO.
38
SIGN AND STAMP
02
16 DIA SCISSOR BARS
ACTING AS THE PIN
16 DIA MAIN BARS
8 DIA STIRRUPS
AT 150 C/C
FLOOR FINISH
GROUND LEVEL
16 DIA MAIN BARS
8 DIA STIRRUPS
AT 150 C/C
75
550
150
450
10 DIA DISTRIBUTION
BARS AT 150 C/C
16 DIA MAIN BARS
AT 150 C/C
600
CORRUGATED POLYCARBONATE
SHEET 1400X2800 OVERLAP OF 150
100X 75 STEEL PURLINS
AT 1400 C/C
STEEL ANGLE
HALF ROUND
G.I. GUTTER
M.S. GUTTER
CLAMP
16 DIA MAIN BARS
8 DIA STIRRUPS
AT 150 C/C
CORRUGATED POLYCARBONATE
SHEET 1400X2800 OVERLAP OF 150
100X 75 STEEL PURLINS
AT 1400 C/C
STEEL ANGLE
HALF ROUND G.I. GUTTER
M.S. GUTTER CLAMP
100 DIA RAINWATER PIPE
300
8000
5000
600
P
Q
R
CORRUGATED POLYCARBONATE
SHEET 1400X2800 150 OVERLAP
PURLINS AT 1400 C/C
G.I. EAVES GUTTER
R.C.C. PORTAL FRAME
FOUNDATION
350 THK
B B'
C
C'
7000
34800
FOUNDATION
350THK
R.C.C. PORTAL
FRAME
PURLINS AT
1400 C/C
CORRUGATED
POLYCARBONATE
SHEET 2800X1400
150 OVERLAP
7000
7000
GUTTER
1900
1900
PURLINS
BRACING
R.C.C. RIGID PORTAL FRAME
GROUND LEVEL
FOUNDATION
HALF ROUND RIDGE PIECE
CORRUGATED POLYCARBNATE SHEET
16 DIA SCISSOR BARS AS PIN J OINT
75X100 STEEL PURLIN
16 DIA MAIN BARS
8 DIA STIRRUP AT 15 C/C
16 DIA 3 NO. MAIN BARS
16 DIA 3 NO. MAIN BARS
16 DIA 4 NO. BARS
8 DIA STIRRUPS AT150 C/C
400
600
8 DIA STIRRUPS AT150 C/C
16 DIA 4 NO. BARS
16 DIA 12 NO. MAIN BARS 400
570
FLEXIBLE RUBBER
SCISSOR REINFORCEMENT
M
DETAIL AT M
SCALE 1:10
PLATE NO. ROLL NO.
38
SIGN AND STAMP
03
DETAIL OF ROCKER JOINT SCALE :- 1:10
PRECAST RCC BLOCK
ROCKER J OINT FOR
FLEXIBLE MOVEMENT
12MM , 350MM
LONG RAG BOLT
HOLLOWCONC.
COLUMN
(1000 x 1000)
DIAPHRAGMBEAM
(600 x 3200)
SCALE :- 1:20
10075 17500 17500
5000
4050 4050 4050
2940 2940 2940
DETAIL AT ' X '
DIAPHRAGM BEAM
12mm DIA.EXTRA BARS
12mm DIA. ALTERNATE
LINK BARS
30mm THICK LAYER OF
ASPHALT WATERPROOFING
10mm DIA. BARS @ 1OOmm C/C
FORMING A MESH
RAIN WATER PIPE (200mm DIA).
BRICK BAT COBA LAID TO SLOPE
VALLEY BEAM (600 MM DEEP )
ROCKER JOINT FOR
FLEXIBLE MOVEMENT
HOLLOW COLUMN
(1000 X 1000)
ELEVATION LINE AS SEEN
BEHIND THE
DIAPHRAGM BEAM.
565
100 100
860
590
EXPANSION JOINT DETAIL @ 'Z' SCALE :- 1:25
12mm . ALTERNATE
LINK BARS
12mm .EXTRA BARS
METAL CAPPING
10mmDIA. BARS @
1OOmmC/C FORMING
A MESH
GUTTER
30mmTHK LAYER OF
ASPHALT WATERPROOFING
REINFORCEMENT IN RIDGE BEAM
12MMDIA. EXTRA LINKS
ALTERNATELY PLACED
AT 200 C/C
EXTRA TIE BARS
REINFORCEMENT IN VALLEY BEAM
SCALE :- 1:20
REINFORCEMENT IN RIDGE BEAMAT EXPANSION J OINT
12MMDIA. EXTRA LINKS
ALTERNATELY PLACED
@ 200c/c
EXTRA TIE BARS
BRICK BAT COBA
LAIDTO SLOPE
CANTILEVER
FOLDEDPLATE
STORMWATER
DRAN PPE(150)
P.V.C CASING
HOLLOWR.C.C COLUMN
(1000x1000)
CURTAIN WALL
Y
SECTION B-B'
SCALE :- 1:200
34800
600
DIAPHRAGMBEAM
(600 x 3200)
FOLDEDPLATE
IN ELEVATION
HOLLOW CONC.
COLUMN (1000 x 1000)
FLOOR LINE
FOLDEDPLATE
X Z
SCALE :- 1:200 SECTION A-A'
20420
B
B'
A A'
CANTILEVERED
FOLDEDPLATE
DIAPHRAGMBEAM
(600 x 3000)
VALLEY
RIDGE
KEY PLAN SCALE :- 1:200
DETAIL AT 'Y' SCALE :- 1:50
DIAPHRAGMBEAM
VALLEY BEAM
(600 MMDEEP )
R.C.C PURDI
STORMWATER
DRAN PPE(150)
P.V.C CASING
HOLLOWCONC. COLUMN
(1000 x 1000)
BRICK BAT COBA
LAIDTO SLOPE
20 THK WATERPROOFING
MEMBRANE
ROCKER J OINT
600
3000
1000 DETAIL OF EXPANSION JOINT
20 MM DIA
BOTTOM BARS
(SCALE - 1:10)
12 MM DIA VAULT
REINF. AT 150 c/c
12 THK ASPHALT
WATERPROOFING
75 THK BBC
LAID TO SLOPE
20 THK EXTERNAL
PLASTER
100 DIA RAIN
WATER OUTLET
10 MM DIA LINKS
AT 100 c/c
20 MM DIA
BOTTOM BARS
10 MM DIA
INTERMEDIATE LINKS
400 X 900
DOWNSTAND
DIAPHRAGM BEAM
WIRE MESH
10 MM DIA
DISTRIBUTION BARS
ZINC COVER
ZINC CLIPS
@ 600-900 C/C
12 MM DIA TOP
AND BOTTOM BARS
100
7500
8000
1875 3750 1875
500 x 1000 COLUMN
20 MM DIA
BOTTOM BARS
10 MM DIA LINKS
AT 100 c/c
12 MM DIA VAULT
REINF. AT 150 c/c
12 THK ASPHALT
WATERPROOFING
75 THK BBC
LAID TO SLOPE
100 DIA RAIN
WATER OUTLET
490
175
20 THK EXTERNAL
PLASTER
TENSION ZONE
COMPRESSION ZONE
TENSION ZONE
175 WIDE
VALLEY GUTTER
12 MM DIA TOP
AND BOTTOM BARS
10 MM DIA
DISTRIBUTION BARS
WIRE MESH
GLAZING
5OO X 1000
DOWNSTAND
EDGE BEAM
ENLARGED SECTION THROUGH BARREL VAULT
(SCALE - 1:20)
100
7500
8000
1875 3750 1875
490
ENLARGED SECTION THROUGH TIE BEAMS
(SCALE - 1:50)
20 THK PLASTER
75 THK BBC LAID TO
SLOPE
100 DIA RAIN WATER OUTLET
COLUMN
END LINE
5OO X 1000 RCC
COLUMN
5OO X 850 TIE BEAM
230 THK BRK WALL
CONCRETE SILL
GLAZING
12 MM DIA TOP AND
BOTTOM BARS
10 MM DIA DISTRIBUTION
BARS
12 MM DIA TOP AND
BOTTOM BARS
20 MM DIA BOTTOM
BARS
10 MM DIA LINKS AT
100 c/c
SECTION BB'
(SCALE - 1:200)
PLAN
(SCALE - 1:200)
SECTION AA'
(SCALE - 1:200)
R
DETAIL AT 'P' DETAIL AT 'Q'
(SCALE - 1:10)
500 x 1000 COLUMN
20 MM DIA
BOTTOM BARS
10 MM DIA LINKS
AT 100 c/c
12 MM DIA VAULT
REINF. AT 150 c/c
10 MM DIA
INTERMEDIATE LINKS
12 THK ASPHALT
WATERPROOFING
75 THK BBC
LAID TO SLOPE
175
655
12 MM DIA TOP
AND BOTTOM BARS
10 MM DIA
DISTRIBUTION BARS
WIRE MESH
5OO X 1000 DOWNSTAND
DIAPHRAGM BEAM
10 MM DIA
INTERMEDIATE LINKS
20 THK EXTERNAL
PLASTER
100 DIA RAIN
WATER OUTLET
(SCALE - 1:10)
5OO X 1200
DOWNSTAND
EDGE BEAM
PLATE NO. ROLL NO.
38
SIGN AND STAMP
04
LEGEND :
A.C. RETURN DUCTS
A.C. SUPPLY DUCTS
A.C. SUPPLY VENT
A.C. RETURN VENT
CERTIFICATION:
PROJECT:COMMERCIAL BUILDING
DRAWING: A.C. DUCTING
BUILDING SERVICES
SCALE- 1:200
FOURTH YR. B.ARCH.
SIR J.J. COLLEGE OF ARCHITECTURE
NOTES
ALL DIMENSIONS ARE IN MM. UNLESS
OTHERWISE SPECIFIED.
DRAWINGS NOT TO BE SCALED. ONLY
WRITTEN DIMENSIONS ARE TO BE
CONSIDERED.
PLATE NO.
AC DUCTING OFGROUNDFLOOR PLAN
AIR CONDITION ROOM RETURN AIR DIFFUSER SUPPLY AIR DIFFUSER SUPPLY AIR DUCT
RETURN AIR DUCT
AIR CONDITION ROOM RETURN AIR DIFFUSER
SUPPLY AIR DIFFUSER SUPPLY AIR DUCT
RETURN AIR DUCT
SUPPLY DUCT 0.6M DIA AT STARTI ANDIT REDUCES BY 0.075M AT EVERY 12M
SUPPLY SECONDARY DUCT 0.3MDIA
SUPPLY SECONDARY DUCT 0.3MDIA
AIR CONDITION ROOM AIR CONDITION ROOM AIR CONDITION PASSAGE
AIR CONDITION PASSAGE
AIR CONDITION PASSAGE
AIR CONDITION PASSAGE
L L
L L
SCHAMITIC SECTIONOFA.C. DUCTINGAT FLOOR LEVEL
SCHEMATIC SECTION
OFAC DUCTING
EXPANSION TANK
AIR CONDITION ROOM
A.C. PLANT ROOM
CHILLEDWATER PUMP
A.H.U.
A.H.U.
A.H.U.
A.H.U.
A.H.U.
COOLING TOWER
CONDENSER WATER PUMP
SUPPLY AIR DUCT
RETURN AIR DUCT
SUPPLY AIR DUCT
RETURN AIR DUCT
SUPPLY AIR DUCT
RETURN AIR DUCT
SUPPLY AIR DUCT
RETURN AIR DUCT
SUPPLY AIR DUCT
RETURN AIR DUCT
SUPPLY AIR DIFFUSER
RETURN AIR DIFFUSER
AIR CONDITION ROOM
SUPPLY AIR DIFFUSER
RETURN AIR DIFFUSER
AIR CONDITION ROOM
SUPPLY AIR DIFFUSER RETURN AIR DIFFUSER
AIR CONDITION ROOM
SUPPLY AIR DIFFUSER RETURN AIR DIFFUSER
AIR CONDITION ROOM
SUPPLY AIR DIFFUSER RETURN AIR DIFFUSER
COMPRESSOR
CONDENSOR
CHILLER
DUCT INSULATION
FOIL
WIRE MESH
FABRIC
GLASS WOOL
COAL TAR
TAPE
THERMACOL
BINDING
ALLUMINIUM POLYSTERENE
INSULATION
FELT
DUCT
TWO LAYER
ROCKWOOD
EXPANDED
TYPES OF DIFFUSERS
DIFFUSER
ROUNDLOUVREDFACE FACEDDIFFUSER
RECTANGULAR LOUVRED
DUCT FIXING
FINISH FLOOR LEVEL
BOLT
STEEL ANGE
DUCT
EXPANSION
HANGING STRAPS
DUCT
A.C. DUCTING PLAN,SECTION & DETAILS
HER
OFFICE
ATM
ENTRY ENTRY
WAY TOWARDS
RAMP
+1.2
130m2
+1.2
89.88m2
+2.4
118.8
+0.9m
ELECTRICAL DUCT
+2.4m
58.1m2
+2.4m
28.9m2
+1.5m
+2.4m
+1.2m
+1.2m
+1.2m
L L
AHU
5.7x2.7M
6.35
FIRE DUCT 1X1M
CHILLEDWATER PIPE FROMA.C. PLANT ROOMTO A.H.U.
PIPE COMING FROMEXPANSION WATER TANK TO A.H.U.
PIPE FROMA.C. PLANT ROOMTO COOLING TOWER
RETURN DUCT 0.6MDIA AT START ANDIT REDUCES BY 0.075M AT EVERY 12M
SUPPLY DUCT 0.6MDIA AT START ANDIT REDUCES BY 0.075MAT
EVERY 12M
SUPPLY
SECONDARY
DUCT 0.3MDIA
RETURN
SECONDARY
DUCT 0.3MDIA
SUPPLY
VENT AT 4MC/C
RETURN
VENT AT 4MC/C
RECREATIONAL AREA
AT 0.9MLEVEL
AC DUCTING OFOFFICE FLOOR
OFFICE AREA
ELECTRICAL DUCT
HER
HIS HIS
HER
OFFICE AREA OFFICE AREA
+22.4
256.78m2
+22.4 110.83m2 +22.4
149.89m2
L L
AHU
5.7X2.7M
FIRE DUCT 1X1M
SUPPLY DUCT
0.3MDIA
RETURN
DUCT 0.3MDIA
75 75
DUCT
100
RAWL / ANCHOR BOLT
GALVANISEDNUT WITH
3 MMWASHER
12 MMGALVANISED
STEEL ROD
75 MMLONG THEADS ON
BOTH SIDES
50 X 50X 6 GALVANISED
ISA 5050 SUPPORT
100 MMLONG ISMC 75
GALVANISEDCLEAT
50 50
DUCT SUPPORT DETAIL
WRAP AND
STAPLE
WRAP ANDTIE
WITH TWINE OR
WIRE
WRAP AND
ADHERE
METHODS OF APPLYING
INSULATION
HIS
A.C. DUCT
FABRIC
WIRE MESH
ALUMINIUM
ENCLOSURE
BINDING TAPE
M.S. ANGLE
ALUMINIUM
FOIL
GLASS WOOL
THERMOCOL
SILVER FOIL
PAPER
OR
OFFICE
OFFICE
OFFICE
+1.2
165m2
SPRAYEDWATER COOLED BY NORMAL AIR
FRESH AIR INTAKE
RETURN AIR
DAMPER
FILTER
PUMP
TERRACE LEVEL
LOUVERS COOLING TOWER
A CHILLED
WATER CYCLE
EVAPORATOR
COMPRESSOR
CONDENSOR
THERMAL EXPANSION VALVE 14 c
30 c
A.C. PLANT ROOM
A.C. SPACE
COOLING COIL PRE HEAT COIL
75%
25%
MAKE UP TANK EXPANSION TANK
C
COOLING WATER CYCLE
B REFRIGERANT WATER CYCLE
CENTRALISEDAIR CONDITION
CHILLEDWATER SYSTEM(FLOWDIAGRAM)
A.H.U
AIR BOOT FITTINGS
O - 15 M- 5 0 - 60
I - 5 N - 15 A - 30 H - 50
G - 15 B - 10 I - 75
ANGLES FOR BRANCH
DUCTS
F - 10 E - 5 H - 15
B - 30 A - 15 D- 40
G - 25
H - 35
F - 75
E - 15
O - 25
Q - 75
P - 30
TRUNK DUCTS AND
FITTINGS
ROLL NO. :- 38
02
RETURN DUCT 0.6MDIA AT START ANDIT REDUCES BY 0.075MAT EVERY 12M
SUPPLY DUCT 0.6MDIA AT START ANDIT REDUCES BY 0.075MAT EVERY 12M
CHILLEDWATER PIPE FROMA.C. PLANT ROOMTO A.H.U.
PIPE COMING FROMEXPANSION WATER TANK TO A.H.U.
PIPE FROMA.C. PLANT ROOMTO COOLING TOWER
FIELD
INSTALLED INLET WARM
WATER PIPING WARM MOIST
AIR OUT
ALUMINIUM OR
REINFORCED
AXIAL DRIVEN
GEAR MOTOR
FAN CYLINDER
LOUVERS CLOSE PACKET
FILM TYPE
CONNECT CITY WATER MAKEUP
TO FLOAT VALVE ON SIDE
OPPOSITE TO COLD WATER
AIR IN
(BOTH END)
SUPPORT ON 2 STEEL BEAM COLD WATER TO PUMP SECTION
OVERFLOW AND DRAIN
GALVANISED
STEEL COLD
WATER BASIN
FIBRE GLASS
REINFORCED
POLYSTER
MOIST
ELIMINATORS
FILL P.V.C
COOLING TOWER
DEHUMIDIFIER
FIRE CONTROL
ROOM OFFICE
DETAIL PLAN OF SIDE PANELS
SCALE - 1 : 20
PLYWOOD
AIR GAP
PLYWOODCASING
PERFORATEDFIBRE BOARD
GLASS WOOL
WIRE MESH
TUNGSTEN
HALOGEN LIGHT
DETAIL SHOWING SUSPENDED PANELS
SCALE - 1 : 20
M.S. HANGER
GYPSUMBOARDREFLECTOR
PERFORATED
FIBRE BOARD
GLASS WOOL
WIRE MESH
AIR GAP
PLYWOODCASING
CERTIFICATION:
PROJECT:
DRAWING: AUDITORIUM ACOUSTICS
BUILDING SERVICES
SCALE- 1:100
FOURTH YR. B.ARCH.
ROLL NO. :- 38
SIR J.J. COLLEGE OF ARCHITECTURE
NOTES
ALL DIMENSIONS ARE IN MM. UNLESS
OTHERWISE SPECIFIED.
DRAWINGS NOT TO BE SCALED. ONLY
WRITTEN DIMENSIONS ARE TO BE
CONSIDERED.
PLATE NO.
REVERBERATION TIME CALCULATIONS:
REVERBERATION IS THE PERSISTANCE OF SOUNDIN A PARTICULAR SPACE AFTER THE ORIGINAL SOUNDIS PRODUCED.
REVERBERATION TIME IS THE TIME REQUIREDFOR REFLECTION OF A DIRECT SOUNDTO DECAY BY 60 DB. BELOWTHE
LEVEL OF DIRECT SOUND.
RT =(0.16 X V)
S .... (SABINE'S FORMULA)
WHERE, RT =REVERBERATION TIME
V =VOLUME OF THE AUDITORIUM(EXCLUDING STAGE AREA)
S =TOTAL ABSORPTION
A =AREA OF MATERIAL USED
a =SOUNDABSORPTION COEFFICIENT
CAPACITY OF AUDITORIUM=300 SEATS
VOLUME OF THE AUDTORUM = 3039 M
PLYWOOD 3
8" THICK
LIGHT
FIXTURE
HANGERS
CASE 1- WHEN AUDITORIUM IS EMPTY
TOTAL NO. OF SEATS AVAILABLE =300
NO. OF SEATS UN-OCCUPIED =300
NO. OF OCCUPIED SEATS =0
HENCE, TOTALA = 269.1+(300X.12)
=305.1 cu.m./s
RT = (.16 X V )/S
= (.16 X 2160)/305.1
= 1.13S
CASE 2- WHEN AUDITORIUM IS FULL
TOTAL NO. OF SEATS AVAILABLE =300
NO. OF SEATS UN-OCCUPIED =0
NO. OF OCCUPIED SEATS =300
HENCE, TOTALA = 269.1+(300X.32)
=365.1 cu.m./s
RT = (.16 X V )/S
= (.16 X 2160)/365.1
= 0.94 S
CASE 3- WHEN AUDITORIUM IS FULL
TOTAL NO. OF SEATS AVAILABLE =300
NO. OF SEATS UN-OCCUPIED =150
NO. OF OCCUPIED SEATS =150
HENCE, TOTAL =
269.1+(150X0.12)+(150X0.32)=
=335.1 cu.m./s
RT = (.16 X V )/S
= (.16 X 2160)/335.1
= 1.03 S
AUDITORIUM ACOUSTICS DETAILS
07
11
11
17
l=2WOR LESS
AUDITORIUM
CEILING DETAILS
THICK FIBROUS MATERIAL
HANGERS
LEGEND :
A.C. RETURN DUCTS
A.C. SUPPLY DUCTS
A.C. SUPPLY VENT
A.C. RETURN VENT
CERTIFICATION:
PROJECT:COMMERCIAL BUILDING
DRAWING: A.C. DUCTING
BUILDING SERVICES
SCALE- 1:200
FOURTH YR. B.ARCH.
SIR J.J. COLLEGE OF ARCHITECTURE
NOTES
ALL DIMENSIONS ARE IN MM. UNLESS
OTHERWISE SPECIFIED.
DRAWINGS NOT TO BE SCALED. ONLY
WRITTEN DIMENSIONS ARE TO BE
CONSIDERED.
PLATE NO.
AC DUCTING OFGROUNDFLOOR PLAN
AIR CONDITION ROOM RETURN AIR DIFFUSER SUPPLY AIR DIFFUSER SUPPLY AIR DUCT
RETURN AIR DUCT
AIR CONDITION ROOM RETURN AIR DIFFUSER
SUPPLY AIR DIFFUSER SUPPLY AIR DUCT
RETURN AIR DUCT
SUPPLY DUCT 0.6M DIA AT STARTI ANDIT REDUCES BY 0.075M AT EVERY 12M
SUPPLY SECONDARY DUCT 0.3MDIA
SUPPLY SECONDARY DUCT 0.3MDIA
AIR CONDITION ROOM AIR CONDITION ROOM AIR CONDITION PASSAGE
AIR CONDITION PASSAGE
AIR CONDITION PASSAGE
AIR CONDITION PASSAGE
L L
L L
SCHAMITIC SECTIONOFA.C. DUCTINGAT FLOOR LEVEL
SCHEMATIC SECTION
OFAC DUCTING
EXPANSION TANK
AIR CONDITION ROOM
A.C. PLANT ROOM
CHILLEDWATER PUMP
A.H.U.
A.H.U.
A.H.U.
A.H.U.
A.H.U.
COOLING TOWER
CONDENSER WATER PUMP
SUPPLY AIR DUCT
RETURN AIR DUCT
SUPPLY AIR DUCT
RETURN AIR DUCT
SUPPLY AIR DUCT
RETURN AIR DUCT
SUPPLY AIR DUCT
RETURN AIR DUCT
SUPPLY AIR DUCT
RETURN AIR DUCT
SUPPLY AIR DIFFUSER
RETURN AIR DIFFUSER
AIR CONDITION ROOM
SUPPLY AIR DIFFUSER
RETURN AIR DIFFUSER
AIR CONDITION ROOM
SUPPLY AIR DIFFUSER RETURN AIR DIFFUSER
AIR CONDITION ROOM
SUPPLY AIR DIFFUSER RETURN AIR DIFFUSER
AIR CONDITION ROOM
SUPPLY AIR DIFFUSER RETURN AIR DIFFUSER
COMPRESSOR
CONDENSOR
CHILLER
DUCT INSULATION
FOIL
WIRE MESH
FABRIC
GLASS WOOL
COAL TAR
TAPE
THERMACOL
BINDING
ALLUMINIUM POLYSTERENE
INSULATION
FELT
DUCT
TWO LAYER
ROCKWOOD
EXPANDED
TYPES OF DIFFUSERS
DIFFUSER
ROUNDLOUVREDFACE FACEDDIFFUSER
RECTANGULAR LOUVRED
DUCT FIXING
FINISH FLOOR LEVEL
BOLT
STEEL ANGE
DUCT
EXPANSION
HANGING STRAPS
DUCT
A.C. DUCTING PLAN,SECTION & DETAILS
HER
OFFICE
ATM
ENTRY ENTRY
WAY TOWARDS
RAMP
+1.2
130m2
+1.2
89.88m2
+2.4
118.8
+0.9m
ELECTRICAL DUCT
+2.4m
58.1m2
+2.4m
28.9m2
+1.5m
+2.4m
+1.2m
+1.2m
+1.2m
L L
AHU
5.7x2.7M
6.35
FIRE DUCT 1X1M
CHILLEDWATER PIPE FROMA.C. PLANT ROOMTO A.H.U.
PIPE COMING FROMEXPANSION WATER TANK TO A.H.U.
PIPE FROMA.C. PLANT ROOMTO COOLING TOWER
RETURN DUCT 0.6MDIA AT START ANDIT REDUCES BY 0.075M AT EVERY 12M
SUPPLY DUCT 0.6MDIA AT START ANDIT REDUCES BY 0.075MAT
EVERY 12M
SUPPLY
SECONDARY
DUCT 0.3MDIA
RETURN
SECONDARY
DUCT 0.3MDIA
SUPPLY
VENT AT 4MC/C
RETURN
VENT AT 4MC/C
RECREATIONAL AREA
AT 0.9MLEVEL
AC DUCTING OFOFFICE FLOOR
OFFICE AREA
ELECTRICAL DUCT
HER
HIS HIS
HER
OFFICE AREA OFFICE AREA
+22.4
256.78m2
+22.4 110.83m2 +22.4
149.89m2
L L
AHU
5.7X2.7M
FIRE DUCT 1X1M
SUPPLY DUCT
0.3MDIA
RETURN
DUCT 0.3MDIA
75 75
DUCT
100
RAWL / ANCHOR BOLT
GALVANISEDNUT WITH
3 MMWASHER
12 MMGALVANISED
STEEL ROD
75 MMLONG THEADS ON
BOTH SIDES
50 X 50X 6 GALVANISED
ISA 5050 SUPPORT
100 MMLONG ISMC 75
GALVANISEDCLEAT
50 50
DUCT SUPPORT DETAIL
WRAP AND
STAPLE
WRAP ANDTIE
WITH TWINE OR
WIRE
WRAP AND
ADHERE
METHODS OF APPLYING
INSULATION
HIS
A.C. DUCT
FABRIC
WIRE MESH
ALUMINIUM
ENCLOSURE
BINDING TAPE
M.S. ANGLE
ALUMINIUM
FOIL
GLASS WOOL
THERMOCOL
SILVER FOIL
PAPER
OR
OFFICE
OFFICE
OFFICE
+1.2
165m2
SPRAYEDWATER COOLED BY NORMAL AIR
FRESH AIR INTAKE
RETURN AIR
DAMPER
FILTER
PUMP
TERRACE LEVEL
LOUVERS COOLING TOWER
A CHILLED
WATER CYCLE
EVAPORATOR
COMPRESSOR
CONDENSOR
THERMAL EXPANSION VALVE 14 c
30 c
A.C. PLANT ROOM
A.C. SPACE
COOLING COIL PRE HEAT COIL
75%
25%
MAKE UP TANK EXPANSION TANK
C
COOLING WATER CYCLE
B REFRIGERANT WATER CYCLE
CENTRALISEDAIR CONDITION
CHILLEDWATER SYSTEM(FLOWDIAGRAM)
A.H.U
AIR BOOT FITTINGS
O - 15 M- 5 0 - 60
I - 5 N - 15 A - 30 H - 50
G - 15 B - 10 I - 75
ANGLES FOR BRANCH
DUCTS
F - 10 E - 5 H - 15
B - 30 A - 15 D- 40
G - 25
H - 35
F - 75
E - 15
O - 25
Q - 75
P - 30
TRUNK DUCTS AND
FITTINGS
ROLL NO. :- 38
02
RETURN DUCT 0.6MDIA AT START ANDIT REDUCES BY 0.075MAT EVERY 12M
SUPPLY DUCT 0.6MDIA AT START ANDIT REDUCES BY 0.075MAT EVERY 12M
CHILLEDWATER PIPE FROMA.C. PLANT ROOMTO A.H.U.
PIPE COMING FROMEXPANSION WATER TANK TO A.H.U.
PIPE FROMA.C. PLANT ROOMTO COOLING TOWER
FIELD
INSTALLED INLET WARM
WATER PIPING WARM MOIST
AIR OUT
ALUMINIUM OR
REINFORCED
AXIAL DRIVEN
GEAR MOTOR
FAN CYLINDER
LOUVERS CLOSE PACKET
FILM TYPE
CONNECT CITY WATER MAKEUP
TO FLOAT VALVE ON SIDE
OPPOSITE TO COLD WATER
AIR IN
(BOTH END)
SUPPORT ON 2 STEEL BEAM COLD WATER TO PUMP SECTION
OVERFLOW AND DRAIN
GALVANISED
STEEL COLD
WATER BASIN
FIBRE GLASS
REINFORCED
POLYSTER
MOIST
ELIMINATORS
FILL P.V.C
COOLING TOWER
DEHUMIDIFIER
FIRE CONTROL
ROOM OFFICE
DETAIL PLAN OF SIDE PANELS
SCALE - 1 : 20
PLYWOOD
AIR GAP
PLYWOODCASING
PERFORATEDFIBRE BOARD
GLASS WOOL
WIRE MESH
TUNGSTEN
HALOGEN LIGHT
DETAIL SHOWING SUSPENDED PANELS
SCALE - 1 : 20
M.S. HANGER
GYPSUMBOARDREFLECTOR
PERFORATED
FIBRE BOARD
GLASS WOOL
WIRE MESH
AIR GAP
PLYWOODCASING
CERTIFICATION:
PROJECT:
DRAWING: AUDITORIUM ACOUSTICS
BUILDING SERVICES
SCALE- 1:100
FOURTH YR. B.ARCH.
ROLL NO. :- 38
SIR J.J. COLLEGE OF ARCHITECTURE
NOTES
ALL DIMENSIONS ARE IN MM. UNLESS
OTHERWISE SPECIFIED.
DRAWINGS NOT TO BE SCALED. ONLY
WRITTEN DIMENSIONS ARE TO BE
CONSIDERED.
PLATE NO.
REVERBERATION TIME CALCULATIONS:
REVERBERATION IS THE PERSISTANCE OF SOUNDIN A PARTICULAR SPACE AFTER THE ORIGINAL SOUNDIS PRODUCED.
REVERBERATION TIME IS THE TIME REQUIREDFOR REFLECTION OF A DIRECT SOUNDTO DECAY BY 60 DB. BELOWTHE
LEVEL OF DIRECT SOUND.
RT =(0.16 X V)
S .... (SABINE'S FORMULA)
WHERE, RT =REVERBERATION TIME
V =VOLUME OF THE AUDITORIUM(EXCLUDING STAGE AREA)
S =TOTAL ABSORPTION
A =AREA OF MATERIAL USED
a =SOUNDABSORPTION COEFFICIENT
CAPACITY OF AUDITORIUM=300 SEATS
VOLUME OF THE AUDTORUM = 3039 M
PLYWOOD 3
8" THICK
LIGHT
FIXTURE
HANGERS
CASE 1- WHEN AUDITORIUM IS EMPTY
TOTAL NO. OF SEATS AVAILABLE =300
NO. OF SEATS UN-OCCUPIED =300
NO. OF OCCUPIED SEATS =0
HENCE, TOTALA = 269.1+(300X.12)
=305.1 cu.m./s
RT = (.16 X V )/S
= (.16 X 2160)/305.1
= 1.13S
CASE 2- WHEN AUDITORIUM IS FULL
TOTAL NO. OF SEATS AVAILABLE =300
NO. OF SEATS UN-OCCUPIED =0
NO. OF OCCUPIED SEATS =300
HENCE, TOTALA = 269.1+(300X.32)
=365.1 cu.m./s
RT = (.16 X V )/S
= (.16 X 2160)/365.1
= 0.94 S
CASE 3- WHEN AUDITORIUM IS FULL
TOTAL NO. OF SEATS AVAILABLE =300
NO. OF SEATS UN-OCCUPIED =150
NO. OF OCCUPIED SEATS =150
HENCE, TOTAL =
269.1+(150X0.12)+(150X0.32)=
=335.1 cu.m./s
RT = (.16 X V )/S
= (.16 X 2160)/335.1
= 1.03 S
AUDITORIUM ACOUSTICS DETAILS
07
11
11
17
l=2WOR LESS
AUDITORIUM
CEILING DETAILS
THICK FIBROUS MATERIAL
HANGERS
SCHEMATIC SECTION
OFFIRE FIGHTING
STOP VALVE
PRIMARY PIPE OF SMOKE
DETECTOR
NON RETURN VALVE
SMOKE DETECTORS
SPRINKLER PIPE 25MMDIA
SPRINKLER
SECONDARY CONNECTOR OF
SMOKE DETECTOR
FIRE HYDRANT PIPE 150MMDIA
FIRE HYDRANT
FIRE EXTINGUISHER
LEGENDS
CERTIFICATION:
PROJECT:COMMERCIAL BUILDING
DRAWING: FIRE FIGHTING
BUILDING SERVICES
SCALE- 1:200
FOURTH YR. B.ARCH.
SIR J.J. COLLEGE OF ARCHITECTURE
NOTES
ALL DIMENSIONS ARE IN MM. UNLESS
OTHERWISE SPECIFIED.
DRAWINGS NOT TO BE SCALED. ONLY
WRITTEN DIMENSIONS ARE TO BE
CONSIDERED.
PLATE NO.
AC PLANT ROOM 12 X 6 M
TWO WHEELER PARKING SPACE
PARKING
STALL
6MWIDE DRIVE WAY
6MWIDE DRIVE WAY
+0.15M
+0.00
STATIC TANK 1/3 OF U.G. WATER TANK
FIRE DUCT 1X1M
FIRE DUCT 1X1M
PUMP ROOM 2MX 2M
TO SPRINKLER AT BESEMENT LEVEL 150MMDIA PIPE
UP
L L
U.G.WATER TANK 3.5 X 7 M
25MMDIA
PIPE
32MMDIA
PIPE
75MMDIA
PIPE
BASEMENT LEVEL PLAN
SHORT STRAP U - HOOK
HANGER FOR SPRINKLER PIPES
SPRINKLER HOSE
ANDHEAD
SUSPENDED CEILING
AREA OF SPRINKLER
DISCHARGE OVERLAP
FLOOR LEVEL
CROSSMAINPIPE
SPRINKLER SYSTEM
SPRINKLER
RED LIQUID
BULB
525-750 mm
OPERATION
FLOOR LVL.
INSTRUCTIONS
SUPPLY PIPE GUIDE
HOSE
NOZZLE
25 MMDIA.
RAG BOLT
270-350MM
BORE RUBBER HOSE
VALVE
STOP
ELEVATION SIDE VIEW
DETAILS OF HOSE REEL FIXATION
DISTRIBUTION
PIPE (2" DIA)
RANGE PIPE
( 1
2" DIA) 'T' JOINT
ELBOW JOINT
END
SPRINKLER
INTERMEDIATE
SPRINKLER
SPRINKLER INSTALLATION
HOSE REEL - HINGE PIVOT
PLAN
FIRE FIGHTING PLAN,SECTION & DETAILS
UP
PUMP
ROOM
NON RETURN VALVE
AIR RELEASE VENT
NON RETURN VALVE
SLUICE AND CHECK VALVE
PUMP
FEEDPIPE
150MMDIA
LANDING VALVE
LANDING VALVE
LANDING VALVE
LANDING VALVE
LANDING VALVE
DRAIN VALVE
CHECKVALVE
FIRE SERVICE INLET
OVER HEADFIRE FIGHTING TANK (25000 LIT CAPACITY)
WATER SUPPLY FROM
UNDER GROUNDTANK TO
O.H.T. FIRE FIGHTING
TAN 150 MMDIA
150 MM
FEEDPIPE
SUPPLYING
SPRINKLERS
150 MM
FEEDPIPE
SUPPLYING
SPRINKLERS
150 MM
FEEDPIPE
SUPPLYING
SPRINKLERS
150 MM
FEEDPIPE
SUPPLYING
SPRINKLERS
BASEMENT LEVEL
SPRINKLERS AT 3.5MC/C
SEAMIESE
CONNECTION
UNDER GROUND
WATER TANk 75000 LIT CAPACITY
150 MMDIA MAIN CONNECTION TO FIRE EXTINGUSHER
SPRINKLERS AT 3.5MC/C
SPRINKLERS AT 3.5MC/C
SPRINKLERS AT 3.5MC/C
SPRINKLERS AT 3.5MC/C
SPRINKLERS AT
3.5MC/C
SPRINKLERS AT 3.5MC/C
EXHAUST ROOM 5 X 5M
PLENUM ROOM 5X5M
ROLL NO. :- 38
03

You might also like