Riga Egypt For Construction and Industry


REQUEST FOR INSPECTION
Project Name

ESCC Coal Mill Project

Contract Number:

IRF Number:

465-RFI-0001

Date Prepared:

:
:
:
:

R
0
M
1

0
0
A

0
0
0
of

5
0
1
1

9Th FEB 2015

Construction Activity for which inspection is requested:


Ref. Pay
Item No.
1
2
3

Description

Location

Date

Time

Remarks

Rotary Scale DRW 4.14 ( 465.Rl570)


Rotary blower Incl. drive ( 465.BL580)
Rotary blower Incl. drive ( 465.BL585)

Area 465 / B550


Area 465 / B550
Area 465 / B550

9-Feb-15

11:00

60135215
60135554
60135554

A/M Equipment had been erected Sucessfuly according to FLS instructions Manual / Legend or any additional Ref.Documents , Fixed and Surveying
check had been implemented to ensure the Equipment location.
Requested by

Received by

Signature

Name

Eng.Amr Mamdouh

Title
Date
Time

ESCC Representative
9th FEB 2015
11:00

Name
Title

Eng.Ahmad Eldagen
QC/QA Director

Conclusion / Result of Request

The A/M Equipment are ready for Comissioning.

Erection Supervision FLS


Testing Needed
Yes

Signature
Name
Title
Date
Time

No

Survey Needed
Yes

No

Mr/Pasad
FLS Representative
9th FEB 2015
11:00

Recommendations / Remarks

Test/ Survey witnessed by

Request to proceed is
Approved

Signature
Name
Title
Date
Time

Mr/Pasad
FLS Representative
9th FEB 2015
11:00

Disapproved

Signature
Name
Title
Date
Time

Eng.Amr Mamdouh
ESCC Representative
9th FEB 2015
11:00