You are on page 1of 2

Constraints List

Ryan & Layne Mini Design Project

1 Be constructed from easily acquired inexpensive/free


2 Significantly reduce the turbidity of the contaminated
3 Purify at least 250 ml from 1000 ml of contaminated
4 Be durable and require the least amount of maintena
5 Be easily assembled
6 Empty product in to bucket or other reservoir

nexpensive/free materials
e contaminated water
contaminated water in less than 5 minute
unt of maintenance

eservoir

You might also like