DESIGN CALCULATION OF SPILLWAY GATE

1
Design data
Type Radial gate
Max.Flood level
337 m
High water level
336 m
Low water level
336 m
Crest El.
340 m
Clear span
14
m
Height
11
m
Design head-H
11
m
Quantity
2
sets
All.stress-SS400
1200 kg/cm2
All.stress-SM490
1600 kg/cm2
Corr.all.
2
mm

Economic radius of radial gate


R = 1.25 * H
=
1.25*11
=
13.75 m
sin /2=
h/2
R
=
5.5
13.75
=
0.4
/2 = 23.58 o
= 47.16 o
< = 0.26 radiant

Arc length of gate


L=
R * (< in radiant)
=
3.14*13.75 *0.26
=
11.31 m

4
(a)

Spacing of horizontal girder


Number of girder-N, according to standard for H= 8.5 to 12
=
3
(b)
Water pressure, t/m2
spacing, m kg/cm2
p0 = 0.000
0.000
a
2.245
b1 = 3.726
p1 = 4.491
b

4.491
6.134
b2 = 3.189

p2 = 7.778
c

7.778
8.910

b3 = 2.644
9.559
p3 = 10.042
d
b4 = 1.441 10.521
p4 = 11.000
e
11.000
5
5.1

Vertical stiffeners
Bending moment on vertical stiffeners
M ab=p1*b1^2/6
=
4.49*3.73^2/6
=
10.391
tm
=
1,039,086 kg-cm

10.042
11.000

M cb & bc = (p1*b2^2/12)+(p2*b2^2/12)
=
(4.49*3.19^2/12)+(7.78*3.19^2/12)
=
10.40 tm
=
1,039,761 kg-cm
M cd & dc = (p2*b3^2/12)+(p3*b3^2/12)
=
(7.78*2.64^2/12)+(10.04*2.64^2/12)
=
10.38 tm
=
1,038,110 kg-cm
M de =
(p3*b4^2/2)+(p4*b4^2/3)
=
(10.04*1.44^2/2)+(11*1.44^2/3)
=
10.43 tm
=
1,042,558 kg-cm
Max. bending moment- Mb max.
Mb max. = 1,042,558 kg-cm
5.2

Number of vertical stiffeners


Spacing, s = 0.60 m
N=
(B/s)+1
=
14/0.6+1
=
24

5.3

Bending stress
cd = Mmax =
Zxl
=
=
Material:

5.4

6
6.1

1042557.53
815.90
1042557.53
815.90
1,277.80
JIS G 3101
B
Tw
200 9

tf/cm2
SS400

H
Tf
I
mm 450
14
Cor.all.
mm
1
I x1 =
18,195
cm4
Z x1=
816 cm3
Aw =
77.54
cm2
G=
60.87
kg/m
Weight of vertical stiffener
Gst = N * L * G
=
24*11.31*60.87
=
16,753.18 kgs
Horizontal girder
The end frames shall be fixed at about 0.2 * B distance from each end.
Distance of end frame from each end of the gate, e
b = 0.2 * B
=
0.2 *14

=
2.8
m
=
280 cm
Distance between end frames
e=
B - ( 2*b )
=
14 -(2 *2.8)
=
8.4
m
=
840 cm
6.2
(1)

(2)

Loads acting on horizontal girder


Beam B
wb = wb1 + wb2
wb1 =(p0 + 2 * p1) * b1
6
=
(0 + 2 * 4.49) * 3.73
6
wb2 =(2 * p1 + p2) * b2
6
=
(2 * 4.49 + 7.78) * 3.19
6
wb = 5.577 + 8.908
=
144.85
Beam C
wc = wc1 + wc2
wc1 = (p1 + 2 * p2) * b2
=
6
(4.49 + 2 * 7.78) * 3.19
6
6
=
10.66 tf/m
wc2 = (2 * p2 + p3) * b3
=
6
=
(2 * 7.78 + 10.04) * 2.64
6
6
=
15.71 t/m
wc= 10.66 + 15.71
=

(3)

=
263.60

Beam D
wd= wd1 + wd2
wd1 =(p2 + 2 * p3) * b3
6
=
(7.78 + 2 * 10.04) * 2.64
6
wd2 =(2 * p3 + p4) * b4
6
(2 * 10.04 + 11) * 10.52
6
wd = 12.278 + 7.465
=
197.43

5.577 tf/m

8.908 tf/m

=
14.485
kgf/cm

63.930

94.23

tf/m

26.36 tf/m
tf/cm

12.278

7.465 tf/m

=
19.743
kg/cm

tf/m

tf/m

6.3

wmax =
=
263.60
kg/cm
MBA =
wmax * b ^2
=
263.6 * 280 ^2
2
2
11,356,240.00
2
=
5,678,120.00
kg-cm
Bending stress
BC = MBC =
5678120
Zxl
10454.64
=
11356240
10454.64
Upper girder
=
1,086.24
kgf/cm2
Material:
JIS G 3101
SS400
H
B
Tw
Tf
I
mm 900 400 25
25
Cor.all.
mm
1
I x1 =
Z x1=
Aw =
G=

6.4

468,368
10,455
379.50
297.91

cm4
cm3
cm2
kg/m

Weight of horizontal girder


Gst = N * B * G
=
3*14*297.91
=
166,828.20 kgs

Skin plate
From the practical safety consideration the thickness of skin plates is of not
less than 10 mm.
An allowance of 2 mm thickness is made to allow for corrosion and rusting.
This allowance is included in the minimum specified thickness of 10 mm.
So that the effective thickness of skin plate is only 8 mm.
7.1

Bending stress
s = K * a^2 * p
100 x t^2

7.2

Result of calculation
k=
50
a
b
b/a
p
t
(cm) (cm)
(kgf/cm2)
(cm)
60
372.600
6.21 2.245 1.80
60
318.900
5.315 6.134 2.80
60
264.400
4.407 8.910 3.80
60
144.100
2.402 10.521
allowable bending stress

s
(kgf/cm2)
1247.4
1408.4
3.80 1110.6
SM-490

1311.5

7.3
1
2
3
4
5
8

9
9.1

(a)

(b)
( c)

9.2

Corrosion allowance
0.2
Thickness of skin plate
1
20
2
30
mm
3
40
mm
4
40
mm
Weight of skin plate, G=W * H * t * g
Width-W
Height-H
Thickness-t Weight-G
(dm) (dm) (dm) (kg)
140 37.26 0.2
8,189.75
140 31.89 0.3
10,514.13
140 26.44 0.4
11,623.02
140 14.41 0.4
6,334.64
Total
36,661.54

cm
mm

Total weight of moving parts exluding end frame


Weight of vertical stiffener
=
16,753.18
Weight horizontal girder
=
166,828.20 kgs
Weight of skin plate
=
36,661.54 kgs
Total
=
220,242.92 kgs
Friction force
Friction force on pin
Assume pin pin diameter -df
=
0.3
m
Friction between bronze and steel- ff

kgs

600

mm

0.25

Maximum horizontal thrust on pin, P=


P=
B * H^2
2*n
where n = number of end frame = 2
=
14 *11^2
=
484
2*2
4
=
121 tf
Friction force on pin
Fp = P * ff =
121 * 0.25
=
30.3 tf
Load due to friction- Tp
Tp * R = Fp * r
Tp = Fp * r / R
=
30.25 *0.3 / 13.75
where
=
0.66 tf
R = Radius of radial gate
Fp = Friction force on pin
R = Radius of pin
Friction force due to seal rubber
Assume width of seal bears water pressure - wr
mm
=
0.05 m
Pressure area of rubber - ar =
2*L*wr =
=
1.13 m2

=
2*11.31*0.05

50

10
1
2
3
4

11
11.1

Average water pressure - pw


=
5.578 t/m2
Friction coefisien between rubber and steel- fr
=
Load due to friction of rubber seal - Tr
Tr = pw * ar * fr =
5.58*1.13*1.1
=
6.94 tf
Center of gravity
DESCRIPTIONS
WEIGHT
DISTANCE
MOMENT
(kgs) (mm) (kgs.-mm)
gate leaf
220,243
11,311
2,491,162,385
end frame
24,575
6,875
168,953,560
total 244,818
2,660,115,945
center of gravity
10,866
from center of pin

ce
nte
r
of
gra
vit
y
Steel wire rope
Tension on Steel wire rope in normal condition
diameter, d
35
mm
breaking strength, T
kgf
unit weight, Wc
90
kg/m
Taking length of wire rope - Lc
=
12.31 m
Tension in wire rope due to its own weight
=
Total tension in one side of wire rope in normal condition - Wc

1.11

1.1

tf

Wc = (Gg+Gf+Tr)/2
=
220.24+1.96+6.94/2
where
=
114.57
tf
Gg = weight of gate leaf
=
220.24
tf
Df = portion of end frame weight at wire rope position
(Dwg.3)
=
1.96 tf
11.2
(a)

Tension on wire rope in Emergeny condition


Related dimensions
span - B
=
14
m
Radius - R
=
13.75 m
tan A =B/R =
13.75/14
=
0.98
angle < A
=
44.48 o
(i)
Nearest distance from pin to diagonal line of another pin to the edge of gate
leaf - "X"
X/B= SIN(A)
X=
sin(A)*B
=
9.81 m
angel < D =
=
45.49 o

(ii)
Distance from intersection of diagonal line and gate center line to pin
centerline - "Y"
Y/X = SIN(D)
y=
sin(D)*X
7.00 m
( iii) C of G =
=
10.87
m
from center of pin
(iv)
Distance from intersection of diagonal line and gate center line to center of
gravity - "Z"
Z = 10.87-7
=
3.87 m
(v)
Nearest distance from c.g to diagonal line of another pin to the edge of gate
leaf - "p"
p = sin(D)*X
(Dwg.4)
(b)

(i)

(ii)

2.758 m

Moments
Taking moment about vertical plane passing through diagonal line
Gg*p = Rd*X
Reaction at point d, Rd
Rd = Gg * p
X
=
110.12*2.76 =
9.81
9.81
=

303.68
30.94 tf
(downward)

Taking moment about vertical plane passing through wire rope line P-Q
Rd*Cc - Gg*Dc = Ra*Bc
Ra = reaction at point A
Ra = (Rd*Cc) - (Gg*Dc )
Bc
=
(30.94*0.6) - (110.12*6.4)
13.4
13.4
=
(51.21)
(upward)

(686.21)

tf

where
Cc = nearest distance of wire rope from point D
Gg = Load on c.g/2
110.12
tf
Dc = nearest distance of wire rope from point c.g
Bc = nearest distance of wire rope from point A
(iii)

0.6

6.4
13.4

m
m

Tension in emergency
Taking moment about vertical plane passing through D, parallel to line AK
X*(Ra+T')=Gg*(X+Cc)
(Ra*X)+(T'*X)=Gg*(X+Cc)

T'*X=Gg*(X+Cc)-(Ra*X)
T'*X= Gg*(X+Cc)-(Ra*X)
T' = 110.12*(9.81+0.6)-(-51.21*9.81)
9.81
=
1,649.35
=
168.13
9.81
Added with friction loads
T=
Cl
b
ea
r
B sp C
an "
" ,B p
"
Z
O
9
"
0
o"
" X
Y "
A
D
"
Dwg.7 - Basic
arrangement of
upper structure

12
12.1
(a)

End frame
Axial loads on end frame members
Axial load
wb = 14.49 t/m
wc = 26.36 t/m
wd = 19.74 t/m
w max =
26.36 t/m

( b)

Maximum Hydrostatic load - F


F=
wmax * B /2
=
26.36 *14/2
=
621.52
tf

tf

175.07

tf

( c)

(d)

(e)

Inclined component along the line of end member - F'


Radius - R
=
13.75 m
Angle of end frame inclination -
=
Length of end frame - L = R / cos ()
=
=
15.80 m
F' = F * L / R
=
621.52*15.8/13.75
=
713.98
tf
Profil for end frames
Upper girder
Material:
JIS G 3101
SS400
H
B
Tw
Tf
Double-I
mm 750 300 30
30
Cor.all.
mm
1
I x1 = 586,564
cm4
Z x1=
15,726
cm3
Aw =
722.40
cm2
G=
567.08
kg/m
Bending moment - Bm
length of end frame, L' = L - (hf+hg)
where
L = incline distance of end frame
hf = height of vertical stiffeners web
hg = height of horizontal girders web

11.51 o
13.75/-0.87

14.45

=
=
=

15.80
m
m

Bm = G * L'^2
8
=
567.08 *(14.45)^2
8
=
118,331
8
=
14,791.40 kgm
(f)

Bending stress - Sb
Sb = Bm*100
+
F'
z
A
=
14791.4*100
+
713.98*1000
15725.57
722.4
=
1,479,140.40
+
713975.11
15725.57
722.4
=
94.06
+
988.34
=
1,082.40
kg/cm2

(g)

Weight of one element of end frame


Gst = L' * G
=
14.45*567.08
=
Total weight- Gef = N * Gst
N = number of arm

8,191.69
=
3

kgs
24,575.06

kgs