You are on page 1of 35

Drawing office manual

)Drawing office manual (mechanical

.1

.2

.3

3.1
3.2
3.3
3.3.1
3.3.2

3.4
3.5
3.6
3.7
3.8
3.9

3.10
.4
4.1
4.2
4.3
4.4
4.5
4.6
4.7

)(SITE LAY OUT


)(PLOT PLAN OR PLANT
)(FLOW SHEETS
)(PROCESS FLOW SHEET
)(MECHANICAL FLOW SHEET
)(VESSEL &EQUIPMENT DRAWING
PIPING GENERAL ARRANGEMENT

)(HANGER SCHEDULE


)(SKETCH

)(TENDER DRAWINGS

)(AS BUILT
)(REPORT DRAWINGS
)(FOREIGN DRAWINGS

2
2
3
3
3
3
3
3
4
4
4
4
4
4
4
5
5
5
5
5

.5

.6

6.1
6.2
6.3

6
7
7
i

)Drawing office manual (mechanical

6.4
6.5
6.6
6.7
6.8
6.9
6.10
6.11
6.12
6.13
6.14
6.15
6.16
6.17
6.18
7.

7.1
7.2
7.3

.8





REVISION


)(FILING OF DRAWINGS


ARRANGEMENT DRAWINGS

7
8
9
9
9
10
10
11
11
11
12
12
12
12
13
13
13
14
14

ARRANGEMENT DRAWINGS-GENERAL
ARRANGEMENT DRAWINGS-CHECKING
AREA KEY PLANS

)(PROCESS FLOW SHEET

15

) (MECHANICAL FLOW SHEET


.9
16

) (MECHANICAL FLOW SHEET
9.1
-

9.2
10.

10.1
10.2
10.3
10.3.1
10.3.2

16
18

18 PIPING GENERAL ARRANGEMENT


GENERAL -PIPING GENERAL ARRANGEMENT


PIPING GENERAL ARRANGEMENT

18
21
22
22
22

ii

)Drawing office manual (mechanical

10.3.3
10.3.4
.11

)(EQUIPMENT CHECKING

23
24

25

25

11.1
26
-
11.2
) 300)(CRITICAL PIPING (
11.3
27
) 300)(NON-CRITICAL PIPING
11.4
28
(
28
)(DRAFTING
11.5
29
)(HANGERS
11.6
30

11.7

iii

)Drawing office manual (mechanical

.1

) Thermal power
(plants )) (Process plant (
.

:
)(Basic layout of equipment
)(Flow diagram-process



.2

:
:

MV
.
: )(Process Flow Diagram
)(Basic Flow Diagram

.
: ) Basic Plant

(layout

" .

)Drawing office manual (mechanical

: "




.
: ) (Mechanical Flow sheet


) (Elevation plan
. .
:


.
:


.
:
) (
.
.

.3

:
3.1 )(Site lay out
) (Plant
"
.
.
3.2 )(plot plan or Plant

.

)Drawing office manual (mechanical

3.3

)(Flow sheets

3.3.1 )(Process Flow sheet



.
).
8.0 (.
3.3.2 )(Mechanical Flow sheet

.



). 9 (
3.4 )(Vessel &Equipment drawing


.
3.5
G.A.

:
Piping general arrangement

(a
(b Area
Area .
(c
.

3.6
:
(a
(b -
(c -

(d ) -(Spool
.

)Drawing office manual (mechanical

3.7


.
3.8

.
3.9

.

.
3.10 )(Hanger schedule

.

.4

.
.
:
4.1 )(Sketch

.
) (Title Block .
.
"
.

.
4.2

.
) (Title Block .


.
.
.

)Drawing office manual (mechanical

4.3 )(Tender drawings




.

.
.
)
(
")"Drawing for tender purpose only
( .

. .
4.4
.

. .
) (Title block
. ""Approved for construction
) (
.

.

4.5 )(As built



.
4.6 )(Report drawings

.
.
4.7 )(Foreign drawings


.

)Drawing office manual (mechanical

.5

) System ( Area
.
:
.a )(System Layout
.b )(Plant Layout
.c
(i

(ii

P&I

General arrangement .d
Area

.e
.f
.g
.h )(Piping material
.i



.
.

.6
6.1

.








) (Client

.

.

)Drawing office manual (mechanical

6.2

Montreal .
.
.

.
6.3

Montreal .


.


.
.

.

.
6.4
:
Canadian Standards Association C.S.A. B78.1-1967
""Mechanical Engineering Drawing Standards

MECO.
:

)Drawing office manual (mechanical

6.5
" .

Plot plan G.A.
.
.

.
.
)(Third angle
) (American ) 17 19 CSAB-78.1.1967
(.
) (plan View
) (Front Elevation .

.
) (Notes
."
) (Title Block
.
) (Plant
.
.

. A,B,C,.
1,2,3, .

.
G.A.
.

).

(.
" .

) (Key plan
.
."
.
8

)Drawing office manual (mechanical

6.6
title block

"Specification of Microfilming

1
MECO
" Requirements .
:

6.7

* " .
) (scale
.
title block
. title
block " "As Noted
.

6.8
12
MECO General Engineering
C.S.A B78.1-11967
specification No.1 :

)Drawing office manual (mechanical

) -(Center Line dash


) -8 (3

-
) -8 (5

-Cutting Plane
.
.
Cutting Plane .
.

) -(Leaders
. ) -8 (5

6.9

.
) (Capital .

"
) (Inclined .
:
" -1/8 )(Local Notes
" -3/16 ) (Details .
.
) MECO General Engineering Specification No.1 Re microfilming Requirements

(.
)(Under line

2/3
1 .
6.10
SI
. Imperial


"(11 3/4

10

)Drawing office manual (mechanical

)
" 10'-6 "( 1'-0
.

.

) (Controlling dimensions

.

Power house Arrangement Drawing




.
.
N.T.S
). (2'-6" N.T.S
6.11
.

.
Title Block

)(Bold
.
.
" "Preliminary" "proposed " "Suggested
.
.
6.12
.
Central Registry . 26
) MECO Engineering
(.

" "Drawing Schedule
.
Revision 6.13
.
11

)Drawing office manual (mechanical


. .
.
Revision " "A Revision
. O L Q
.
Grid System
Revision
.
6.14

" "Cancelled
.
.
6.15
MECO ) (Foreign


) (Reference Drawings .
)
(.
6.16 )(Filing of drawings
) (office services

.
General Approved Checking

) (Issue
. ) Drawing list
(distribution .
6.17

.
.


.

12

)Drawing office manual (mechanical

6.18

.

" 2 ) (single line



) (Double line .

) (fitting ...

.
" Elevation view
.

.

.
" "" "
" " " " ).
(9.2
:

Arrangement Drawings .7
7.1
Arrangement

Battery limit Area
.
Arrangement Drawings-General

Arrangement Drawings

) (Conduit ) (Cable tray
.

13

)Drawing office manual (mechanical


.
Arrangement

:

Plan view
.
Plan view
.

VAC

.

.
HVAC .
.
Elevation Plan view
Section .
Arrangement Drawings-Checking 7.2
:

Arrangement .
.
.
Elevation .
.
.
.
7.3

Area key plans

Area Key plan


.

14

)Drawing office manual (mechanical

Area / Area .
Area
." Area
.
Area key plan plan view
Area
) (N ) (E .
Area key plan / plan view Area

/
.
.
Area /
.
layout
Area Area key plan
.

.8 )(Process flow sheet



.
.
.

:

-
-
.
-
.

.
.
15

)Drawing office manual (mechanical

.9 ) (Mechanical Flow sheet



9.1 ) (Mechanical Flow sheet
-
.
:
-1 :



)(Protection
Terminating equipment


-2
-3 Vent Drain

-4
-5
.

"
.
:
)(Equipment
Power requirements

16

)Drawing office manual (mechanical

.
.
flow sheet

.

.
Power



) (Process Flow Diagram

.

. .
Power Drive ...
.
.

.

.

.
...
.

) . Relief Valve
Reducing Valve(

.

.

.

17

)Drawing office manual (mechanical

9.2
) (P&I
.
) (single source


.

.

.
10 MS 762-05 xyz


MECo
Main Steam



.
:
10 V MS xyz

- Main Stream

)(Valve

.

Piping General Arrangement .10


General -Piping General Arrangement 10.1

Piping Arrangement
.
Area
.

18

)Drawing office manual (mechanical

Area match line


) (Key plan .
G.A.
Area .
) (Elevation :
match line
)(Equipment



)(Match lines



)
(
)(Instrumentation
(


)
(.

) (reducer


G.A.
" 12 " 14
). 6.18 ( .
G.A. :
))(E.Q. (

19

)Drawing office manual (mechanical




)(Ladders
Davits











.
G.A. :
)(P&ID


.
) (Spec.
) (Tag
Match lines



:
20

)Drawing office manual (mechanical

)(Plot plan

)( Hazardous Area
) (Key plan G.A.


steam tracing
: G.A.

Area .
10.2
G.A. :
)(Plot Plan
Section leader's job note

)(Piping study
)(Piping spec.
) (
)(MECo's design
)(Line list
) (Key plan G.A.


) (

) (Critical list

)(Critical list
Cableway

S.M. list and data sheets

21

)Drawing office manual (mechanical

)(hazardous area

) (Thermo well
10.3 Piping General Arrangement

10.3.1

" ) (Outside vendors
.


.
Area
Area
. Area
" "Hold .

P&ID ) (line list
.
Area
.
material take off clerk .
10.3.2

) Key

G.A. (plan .

)(Pipe racks
.
) ( .
.Cable ways
) (
)(See notes on example G.A., Appendix I
) " 3 (
22

)Drawing office manual (mechanical

) " 2 (

.
10.3.3 )(Equipment checking

) (




blanked

)(Vents & Drains


Tube & head removal




) (Cases .




23

)Drawing office manual (mechanical



10.3.4
G.A.
:
)(Piping spec.
P&I

Area
) (clearances :





Ductwork
Cableway
) ) (Lugs (.

Area
.
:
.

.

24

)Drawing office manual (mechanical

) Chain operators
(.
.


.
Arrangement ) (Clearances
) (tagging
.
) (Shut off valves
.

.

.
) (steam out .
) (orifice flanges
.
) (header
.

.
) (Thermometer pockets
.

.11
11.1


.

25

)Drawing office manual (mechanical


) (Detailed Part

system ) (Sketches
.
Preliminary Stress Isometric


.
Final Stress Isometric

Stress Analysis .
)(Isometric Sketch
.

.
)(Critical Piping
300
.
)(Non-Critical piping
300
.
11.2 -

:
)(Steam Tracing Systems
" 2 "2
Pipeways

Water treatment Plant


" 2
.
:
Material requisition

26

)Drawing office manual (mechanical



:

turbine hall roof .
water treatment plant .

.
. "
hold.

.
11.3 ) 300)(Critical Piping (
300
.


) (Study orthogeraphic drawings .
main steam

.
.

.
) (Preliminary stress isometrics
stress analyst
.
stress analyst
.

.


.
Stress analyst
Stress analyst .
27

)Drawing office manual (mechanical


.

.
:
.

"

11.4 ) 300)(Non-Critical Piping


(

" P&I
.
" Coordinator
.

11.5 )(Drafting

) (
.
) (Scale .

.
) (Sketch ) (Scale
.

.


.


)(Sketch


:




Spool piece marks




Elevations

28

)Drawing office manual (mechanical


Elevation




Length of straightrun orifice requirements
Drain
trap Flexible hose
.

steam tracing .
.
) (Title block Areas .


:


.
.
11.6)(Hangers

) (Pipe Support group .
""Project Standard Support Details
.
Hanger
Hanger Hanger schedule
.

29

)Drawing office manual (mechanical

Hanger
) (Revision .

.
11.7

.
stress relievd

piping .

P&ID's :

Steam tracing


.
data sheet
.
Arrangement
multiport .
) Interference (Accessibility
.
Drain Trap .

.
.

.
.

30

)Drawing office manual (mechanical

.
Project stress analyst .

31