)(HANGER SCHEDULE
)(SKETCH
)(TENDER DRAWINGS
)(AS BUILT
)(REPORT DRAWINGS
)(FOREIGN DRAWINGS
2
2
3
3
3
3
3
3
4
4
4
4
4
4
4
5
5
5
5
5
.5
.6
6.1
6.2
6.3
6
7
7
i
6.4
6.5
6.6
6.7
6.8
6.9
6.10
6.11
6.12
6.13
6.14
6.15
6.16
6.17
6.18
7.
7.1
7.2
7.3
.8
REVISION
)(FILING OF DRAWINGS
ARRANGEMENT DRAWINGS
7
8
9
9
9
10
10
11
11
11
12
12
12
12
13
13
13
14
14
ARRANGEMENT DRAWINGS-GENERAL
ARRANGEMENT DRAWINGS-CHECKING
AREA KEY PLANS
15
10.1
10.2
10.3
10.3.1
10.3.2
16
18
PIPING GENERAL ARRANGEMENT
18
21
22
22
22
ii
10.3.3
10.3.4
.11
)(EQUIPMENT CHECKING
23
24
25
25
11.1
26
-
11.2
) 300)(CRITICAL PIPING (
11.3
27
) 300)(NON-CRITICAL PIPING
11.4
28
(
28
)(DRAFTING
11.5
29
)(HANGERS
11.6
30
11.7
iii
.1
) Thermal power
(plants )) (Process plant (
.
:
)(Basic layout of equipment
)(Flow diagram-process
.2
:
:
MV
.
: )(Process Flow Diagram
)(Basic Flow Diagram
.
: ) Basic Plant
(layout
" .
: "
.
: ) (Mechanical Flow sheet
) (Elevation plan
. .
:
.
:
.
:
) (
.
.
.3
:
3.1 )(Site lay out
) (Plant
"
.
.
3.2 )(plot plan or Plant
.
3.3
)(Flow sheets
(a
(b Area
Area .
(c
.
3.6
:
(a
(b -
(c -
(d ) -(Spool
.
3.7
.
3.8
.
3.9
.
.
3.10 )(Hanger schedule
.
.4
.
.
:
4.1 )(Sketch
.
) (Title Block .
.
"
.
.
4.2
.
) (Title Block .
.
.
.
.5
) System ( Area
.
:
.a )(System Layout
.b )(Plant Layout
.c
(i
(ii
P&I
General arrangement .d
Area
.e
.f
.g
.h )(Piping material
.i
.
.
.6
6.1
.
) (Client
.
.
6.2
Montreal .
.
.
.
6.3
Montreal .
.
.
.
.
.
6.4
:
Canadian Standards Association C.S.A. B78.1-1967
""Mechanical Engineering Drawing Standards
MECO.
:
6.5
" .
Plot plan G.A.
.
.
.
.
)(Third angle
) (American ) 17 19 CSAB-78.1.1967
(.
) (plan View
) (Front Elevation .
.
) (Notes
."
) (Title Block
.
) (Plant
.
.
. A,B,C,.
1,2,3, .
.
G.A.
.
).
(.
" .
) (Key plan
.
."
.
8
6.6
title block
"Specification of Microfilming
1
MECO
" Requirements .
:
6.7
* " .
) (scale
.
title block
. title
block " "As Noted
.
6.8
12
MECO General Engineering
C.S.A B78.1-11967
specification No.1 :
-
) -8 (5
-Cutting Plane
.
.
Cutting Plane .
.
) -(Leaders
. ) -8 (5
6.9
.
) (Capital .
"
) (Inclined .
:
" -1/8 )(Local Notes
" -3/16 ) (Details .
.
) MECO General Engineering Specification No.1 Re microfilming Requirements
(.
)(Under line
2/3
1 .
6.10
SI
. Imperial
"(11 3/4
10
)
" 10'-6 "( 1'-0
.
.
) (Controlling dimensions
.
.
.
N.T.S
). (2'-6" N.T.S
6.11
.
.
Title Block
)(Bold
.
.
" "Preliminary" "proposed " "Suggested
.
.
6.12
.
Central Registry . 26
) MECO Engineering
(.
" "Drawing Schedule
.
Revision 6.13
.
11
. .
.
Revision " "A Revision
. O L Q
.
Grid System
Revision
.
6.14
" "Cancelled
.
.
6.15
MECO ) (Foreign
) (Reference Drawings .
)
(.
6.16 )(Filing of drawings
) (office services
.
General Approved Checking
) (Issue
. ) Drawing list
(distribution .
6.17
.
.
.
12
6.18
.
) (fitting ...
.
" Elevation view
.
.
.
" "" "
" " " " ).
(9.2
:
Arrangement Drawings .7
7.1
Arrangement
Battery limit Area
.
Arrangement Drawings-General
Arrangement Drawings
) (Conduit ) (Cable tray
.
13
.
Arrangement
:
Plan view
.
Plan view
.
VAC
.
.
HVAC .
.
Elevation Plan view
Section .
Arrangement Drawings-Checking 7.2
:
Arrangement .
.
.
Elevation .
.
.
.
7.3
14
Area / Area .
Area
." Area
.
Area key plan plan view
Area
) (N ) (E .
Area key plan / plan view Area
/
.
.
Area /
.
layout
Area Area key plan
.
.
.
15
-2
-3 Vent Drain
-4
-5
.
"
.
:
)(Equipment
Power requirements
16
.
.
flow sheet
.
.
Power
) (Process Flow Diagram
.
. .
Power Drive ...
.
.
.
.
.
...
.
) . Relief Valve
Reducing Valve(
.
.
.
17
9.2
) (P&I
.
) (single source
.
.
.
10 MS 762-05 xyz
MECo
Main Steam
.
:
10 V MS xyz
- Main Stream
)(Valve
.
Piping Arrangement
.
Area
.
18
)
(.
) (reducer
G.A.
" 12 " 14
). 6.18 ( .
G.A. :
))(E.Q. (
19
)(Ladders
Davits
.
G.A. :
)(P&ID
.
) (Spec.
) (Tag
Match lines
:
20
)(Plot plan
)( Hazardous Area
) (Key plan G.A.
steam tracing
: G.A.
Area .
10.2
G.A. :
)(Plot Plan
Section leader's job note
)(Piping study
)(Piping spec.
) (
)(MECo's design
)(Line list
) (Key plan G.A.
) (
) (Critical list
)(Critical list
Cableway
S.M. list and data sheets
21
)(hazardous area
) (Thermo well
10.3 Piping General Arrangement
10.3.1
" ) (Outside vendors
.
.
Area
Area
. Area
" "Hold .
P&ID ) (line list
.
Area
.
material take off clerk .
10.3.2
) Key
G.A. (plan .
)(Pipe racks
.
) ( .
.Cable ways
) (
)(See notes on example G.A., Appendix I
) " 3 (
22
) " 2 (
.
10.3.3 )(Equipment checking
) (
blanked
) (Cases .
23
10.3.4
G.A.
:
)(Piping spec.
P&I
Area
) (clearances :
Ductwork
Cableway
) ) (Lugs (.
Area
.
:
.
.
24
) Chain operators
(.
.
.
Arrangement ) (Clearances
) (tagging
.
) (Shut off valves
.
.
.
) (steam out .
) (orifice flanges
.
) (header
.
.
) (Thermometer pockets
.
.11
11.1
.
25
system ) (Sketches
.
Preliminary Stress Isometric
.
Final Stress Isometric
Stress Analysis .
)(Isometric Sketch
.
.
)(Critical Piping
300
.
)(Non-Critical piping
300
.
11.2 -
:
)(Steam Tracing Systems
" 2 "2
Pipeways
26
:
turbine hall roof .
water treatment plant .
.
. "
hold.
.
11.3 ) 300)(Critical Piping (
300
.
) (Study orthogeraphic drawings .
main steam
.
.
.
) (Preliminary stress isometrics
stress analyst
.
stress analyst
.
.
.
Stress analyst
Stress analyst .
27
.
.
:
.
"
)(Sketch
:
Spool piece marks
Elevations
28
Elevation
Length of straightrun orifice requirements
Drain
trap Flexible hose
.
steam tracing .
.
) (Title block Areas .
:
.
.
11.6)(Hangers
) (Pipe Support group .
""Project Standard Support Details
.
Hanger
Hanger Hanger schedule
.
29
Hanger
) (Revision .
.
11.7
.
stress relievd
piping .
P&ID's :
Steam tracing
.
data sheet
.
Arrangement
multiport .
) Interference (Accessibility
.
Drain Trap .
.
.
.
.
30
.
Project stress analyst .
31