1.4.

GEOMETRIC CHARACTERISTICS
The shape dimensions and tolerances will be shown in drawings.
1.5. CONDITIONS OF RECEPTION AND FABRICATION CONTROL
1.5.1. Presentation at reception
The presentation at reception must be notified by writing to the receiving agent in document
established by Authority for this purpose and in where shall be included at least:
Order Reference.
Date of presentation.
The nature and amount of supply.
Any other indication that Order Authority considers appropriate.
1.5.2. State of the devices in the presentation at reception
The insulators under this specification shall be submitted to reception grouped in batches,
packaged and delivery status.
Unless otherwise specified, the disconnectors of the same type form a single batch, unlimited
amount, provided that they have been manufactured during the same manufacturing process
and using the same starting materials.