Paint Inspection:

Date:
/
Project #:

Daily Coating Inspection Report

Inspector:

Project/Client:
Location:
Description:
Requirements:
Contractor:
Description of Areas & Work Performed

M T W Th F S Su

Pg.

Of
COPY To:

QC Mgr

Owner

Contr

Attachments:
DFT Sheet

Revision #
Hold Point Inspections Performed
1 Pre Surface Pep/Condition & Cleanliness
2 Surface Preparation Monitoring
3 Post Surface Preparation/Cleanliness & Profile
4 Pre Application Prep/Surface Cleanliness
5 Application Monitoring/Wet Film Thickness (WFT)
6 Post Application/Application Defects
7 Post Cure/Dry Film Thickness (DFT)
8 Nonconformance/Corrective Actions Follow-up
9 Final Inspection
Approved By:
Surface Conditions
Ambient Conditions
Time
(Indicate
AM
or
PM)
:
:
:
:
New
Maint
Primer/Paint
Age/Dry/Cure
0
o
o
o
o
Dry Bulb Temp (C/F)
Steel
Galvanize
Concrete
Other
0
o
o
o
o
Wet Bulb Temp (C/F)
Hazard
Sample Report #
Degree of contamination:
% Relative Humidity
%
%
%
%
o
o
o
Fe
ppm
pH
g/cm2 / ppm
Surface Temp0 (C/F) Min/Max
Test:
Cl
/
/ o
/
/
0
o
o
o
o
Dew Point Temp (C/F)
Degree of Corrosion:
Scale
Pitting/Holes
Crevices
Sharp Edges Wind Direction/Speed
Weld
Moisture
Oils
Other
Weather Conditions:
Application
Painted Surface Condition:
Start Time :
Finish Time
:
Est. Sq/ft.
Dry to:
Touch
Handle
Recoat
Primer
Intermediate
Topcoat
Touch-up
Dry/Over Spray
Runs/Sags
Pinholes
Holidays
Abrasion
Fall Out
Other
Generic Type:
Qty Mixed:
Surface Preparation
Manuf.:
Mix Ratio:
Prod Name:
Mix Method:
Start Time:
Finish Time:
Est Sq/ft:
Solvent Clean
Hand Tool
Power Tool
Prod #:
Strain/Screen:
oF
HP Wash PSI
Other
Color:
Material Temp:
Abrasive Blast
Abrasive Type
Sample Kit Sz/Cond.:
Sweat-in Time:
Min/Hrs
Blast Hose Size
Nozzle Size / PSI
Shelf Life:
Pot Life:
Min/Hrs
Batch #'s
Air Supply CFM
Air Supply Cleanliness
Reducer #:
Water/Oil Trap Check
Equipment Condition Check
(A)
Qty Added:
Pt/Qt/Gal
(B)
% by Vol:
%
Specified
WFT
Avg:
Surface Cleanliness & Profile Measurement
(C)
Mils
Achieved WFT Avg:
Job Specification
SSPC/NACE - SPReducer:
Mils
SSPC/NACE Spec / Visual Stds
Airless/Conv. Spray
Brush
Roller
Other
Profile Check:
Disc
Tape
Gauge Pump Pot
Hose Dia.
Air Check
Specified
mils avg. / Achieved
mils
Ratio/Size
Hose Lng.
SEP/Trap
Surface effect on DFT Gauge/BMR
mils
GPM/CFM
Spray Gun
Filter
Dry Film Thickness
PSI
Tip Sz.
Agitator
Gage Type /
Model

Gage
Serial #

Gage Calib. Spec Avg.


Verified
DFT

Total Avg
DFT

DFT Last
Coat

Spec #

NCR/CAR

DFT This
Coat
Inspector's Signature

Date
.