4 x 210 MW : CSTPS : CHANDRAPUR

EVENT

ANALYSIS

1. Event No. 6

UNIT NO. 2

REPORT

Time 16:45 hrs.

Date 01.04.08

2. Operating conditions at the time of Event :


Load

Coal Cycles in service

Oil Support
Nil

3. Nature of Event : BFP-2C mechanical seal outlet temp. checking. (Non Tripping Event)
4. Observations:

BFP-2C was started to check mech. seal outlet temp rise. After 15-20 mins mech.
seal outlet temp attain 1350C-1400C from its initial temp of 750C.

5. Analysis
In view of above remarks, it is not feasible to keep BFP-2C on Auto S/B.
6. Works carried out by maintenance section
During trial run mech. seal cooler inlet & outlet temp were measured with laser temp gun. There
is difference of around 500C. Seal inlet temp is observed 75 0C to 800C. It can work as emergency
auto standby till further check is carried out within a temp limit of 1600C.

7. Works carried out for the restoration by operation :


Boiler lighted up

Time -

Date

T-A Set Synchronised

Time -

Date

8. Recommendations to avoid reoccurrence :


a) Short term At present the seal water temp is normal. During inspection pumping ring was
found loose, it was tighted properly. Hence first proper tightening of pumping ring
will be ensured.

b) Long term Long term measures will be decided after on the basis of finding after opening the
seal.
9. Remarks

Manager-I