Field change request

Request Nr.

13

Location

Batching plant (Sand bin separator)

Date

05-11-2014

Ref. Drawings

ZHJV-W-I-SI-0034-1

Applicant

Zenitaka-Hyundai JV

Sketch

SEE ATTACHED SKETCH

Request reason:

Side cover for sand bin


Drainage provision for sand bin roof

Description of the change:


-

The sides are to be covered with 32 gauge iron sheets to increase protection of sand stock
from heavy rain. This has been considered because the height of the structure (8m) will allow
rainfall in, from the sides.
The roof edges need drainage to avoid runoff pouring into the adjacent bin and stagnating
between the sand bins and the retaining walls.

Contractor Representative

Zenitaka-Hyundai JV Design Office

Consultant Representative

Engineer