Professional Documents
Culture Documents
It is come to notice that some drawings (apart from the drawings listed in Master
drawing list as original) have been submitted to MECON for approval by M/s L&T for
completion of jobs under Pkg. 073. However these drawings (drawings not in Master
drawing list) have not been incorporated/ listed in the drawing list for As-built drawing
submission.
In this event, we may ask M/s L&T to submit the details & list of drawings which have
been submitted to MECON for approval later and also present status for the drawings
as so.
Example for the case:
We have a drwg no. 3285 with us but the same drawing has not been incorporated/ listed in