You are on page 1of 1

General

Reference: SIF Drawing(s) specific to this system


R.1.4 Valve line-up activities
Before beginning any portion of this test, the Technician Performing the Test shall have an Operator
close
the downstream manual injection system valve associated with this system. Since the downstream
manual injection block valve is Car Sealed, the Operator must first remove and dispose of the Car
Seal
before closing this valve. Closing of the manual block valve shall be performed in accordance with all
existing site procedures.
Upon completion of this test, the Technician Performing the Test shall inform the Operator the
downstream manual block valve may be opened. Opening of the manual block valve shall be
performed
in accordance with all existing site procedures. The Operator must install and lock a new Car Seal on
the
manual block valve and record the Car Seal Number in the space provided at the end of this test.
NOTE See the Testing Tables for detailed instructions and sign-off for the valve line-up activities.

R.1.5 Inspection
Before beginning any portion of this test, the Technician Performing the Test shall ensure that the
system
is in a normal Off-line condition and NOT tripped. If the system is tripped, the Technician Performing
The
Test shall STOP , and perform the following:
Contact Operations to confirm that the system is in a normal Off-line condition.
Request that Operations Reset the system.
Confirm that all conditions have returned to normal, the system is in a normal Off-line condition, and
the system is NOT tripped.
Confirm downstream manual block valves have been placed into the CLOSED position.
Initial _______________
R.1.6 Thermocouple input, trip, and bypass