Professional Documents
Culture Documents
2009-04-02
1st Issue
HrM
REV
DATE
DESCRIPTION
SIGN
HP-WIV
299356.30
LP-WIV
299356.70
DATE
HrM
2009-04-02
CHECKED BY
DATE
DsE
2009-03-03
QCP299356-3
Vo299356
Descon Engineering FZE
Bhikki CCPP / PO: 0002528
Water control and stop valves
Inspection by:
I = Internal record
R = Record to customer
C = Certificate of Compliance
3.2/3.1/2.2 = According to EN 10204
Document No.
Revision:
Page
1 = Authorized Inspector
2 = Buyers Inspect.
3 = Customer
* = Subsupplier
QCP299356-3
A
2 of 3
H = Hold point
W = Witness point
D = Review of documents
Document
Procedure / Standard
Process / Activity
Inspection by
CCI 1 2 3
1. Contract Review
1.1
Order handling
2. Design activities
2.1
2.2
Design code
ASME B16.34
3. Material
3.1
Pressurized materials
ASTM
3.1
3.2
Pressurized bolts/nuts
ASTM
3.1
3.3
Receiving inspection
4. Manufacturing
4.1
Machining
In-Process Inspection
4.2
NDT
Hardfaced seat
4.3
PT-examination
ASME B16.34
4.4
SNT-TC
5. Assembly / Testing
5.1
5.2
5.3
Functional test
5.4
5.5
5.6
Document check
5.7
Final inspection
Valves
R
ANSI FCI 70-2
R
R
Certified drawing
6. Packaging
7. Shipping
Issue 0/2001-11-27
1 of 2
dok-36774_1510266_258.xls
Vo299356
Descon Engineering FZE
Bhikki CCPP / PO: 0002528
Water control and stop valves
Notes
Invite customer 2 weeks prior to test date(s).
Document No.
Revision:
Page
QCP299356-3
A
3 of 3