UndergroundActivities

Livingstructuresforasustainablesociety
Imagine the result

Technics
Conventionalexcavation
Mechanizedexcavation

CUT&COVER MervalMetro(Chile)

Trenchlesstechnology
Cut&Coverstructures

nd Coentunnel(TheNetherlands)
CONVENTIONALEXCAVATION
IMMERSEDTUNNELS 2Mrazovskatunnel(CzechRepublic)

Immersedtubes

TRENCHLESSTECHNOLOGY
ManteslaVille(France)
MECHANIZEDEXCAVATION
Ltschberg(Switzerland)
IMMERSEDTUNNELS
BusanGeojeFixedLink(SouthKorea)

METROS EastSideAccess NewYork(USA)

Tunneluse
Roadtunnels
Railwaytunnels
Metros
UndergroundSpace
Shafts

UNDERGROUNDSPACE
CityofPrague(CzechRepublic)
HYDRAULICGALLERIES
TIMAStormstoragegalleriesParis(France)
ROADTUNNELS Roertunnel
(TheNetherlands)
SHAFTS ChannelTunnel
Sangatte(France)

Mining
Technical&Hydraulic
Galleries

RAILWAYTUNNELS
ParisEoleProject
(France)

InvestigationGalleries
RAILWAYTUNNELS
ROADTUNNELS
MINING Andina(Chile)
INVESTIGATIONGALLERIES
LyonTurinFerroviaire(Italy&France
TramTrain
LaRunion
A2Maastricht(TheNetherlands)

SEISMICENGINEERING
GEOLOGY,HYDROGEOLOGY&GEOTECHNICS
MONITORINGENGINEERING
SYSTEMSENGINEERING
PietHeinTunnel(TheNetherlands)
CityofPrague(CzechRepublic)

Skills
Geology,Hydrogeology&
Geotechnics
Groundimprovement
techniques
ENVIRONMENTALSERVICES LyonTurinFerroviaire(ItalyFrance)

SeismicEngineering
CivilEngineering
SAFETYSTUDIES
A2Maastricht(TheNetherlands)

MonitoringEngineering
EnvironmentalServices
SafetyStudies
SystemsEngineering
SYSTEMSENGINEERING
BeneluxTunnel(TheNetherlands)
CIVILENGINEERING

OurServices

Maintain
Realization
Engineering
Design
Consultancy
services
Project Development
Feasibility Studies
Program Consultancy
Master Planning

GlobalKnowledgeNetwork
TunnelsActivities

United Kingdom Netherlands


Poland
Belgium
Germany
France
Czech Republic

ARCADISBELGIUM
ARCADISCHILE
ARCADISCZECHREPUBLIC
ARCADISFRANCE
ARCADISNETHERLANDS
ARCADISROMANIA
ARCADISUS

Italy Romania

United States

United
Arab
Emirates
Peru
Chile

Brazil

China

InternationalMembership

AITESITA(InternationalTunnellingAssociation)
AFTES(Frenchtunnellingassociation)
COSUF(CommitteeonOperationalSafetyofUndergroundFacilities)
COB(DutchCenterforUndergroundConstruction)
CzTA(CzechTunnellingAssociation)
SME(SocietyofMiningEngineers)
ASCE(AmericanSocietyofCivilEngineers)
PipelineCrossingsCommittee&PipelineInfrastructureCommittee
TrenchlessTechnologyMagazine,MemberofEditorialAdvisoryBoard
...andTraining

D8 Motorway - Panensk and Libouchec Tunnels


(Czech Republic)

Toulouse Metro TBM section


(France)

Schiphol Tunnel
(The Netherlands)
Toulon
Highway Cut & Cover section

Projects

GreatCrossings

GreatCrossings

CHANNELTUNNEL(FranceUK)
CHANNELTUNNEL

Client: TransMancheLink(TML)
Keydata:Constructionperiod:19861991
2railwayrunningtunnels,50.4kmlongeach,boredby8.64mto
ARCADISServices
: Geotechnics PreliminarydesignofalltunnelsonFrenchpart
Basicanddetailed
8.78diameterEPBM(innerdiameter:7.60m)

1servicetunnel,50.4kmlongboredby5.61mto5.77m
designof6undergroundcavernsfortheassemblyofthe5french TBMs Onsiteengineering(geological&
diameterEPBM(innerdiameter:4.80m)
geotechnicalfollowup)

GreatCrossings

ALPTRANSITPROJECT LTSCHBERGBASETUNNEL(Switzerland)
LTSCHBERGBASETUNNEL

Client:
BLSAlptransitAG
ARCADISServices:PartneringwithSwissengineeringcompanies
Definitionofthenecessaryarrangements
Keydata:Constructionperiod:19962006
2railwayrunningtunnels,21.1kmexcavatedbydrillandblast
forcrossingfaultsandrockburstevents
Evaluationofthestressfieldinrockmass Definitionof
technique(65m2),18.7kmboredbyTBM(excavateddiameter:9.40m,70m2)
excavationstages&temporarysupportforbranches Evaluationofthermaleffectsonthefinallining

GreatCrossings

LYONTURINFERROVIAIRE BASETUNNEL(FranceItaly)
BASETUNNEL

Client: LTF
Keydata:Constructionperiod:2002ongoing
ARCADISServices:Geotechnics
Preliminarydesignuptotenderdocumentsofthe3inclinedgalleries
2 section 1largeundergroundtechnicalstation 4inclined
2railwayrunningtunnels,57kmlong,43m
PreliminarydesignoftheBaseTunnel
galleries crosspassages

RailwayTunnels

13

HighSpeedLineTunnels

HSLATLANTIC(France)
HSLATLANTIC

Client:SNCF(FrenchNationalRailwayAuthority)
Keydata:Constructionperiod:1983to1989
2railwayrunningtunnels,
ARCADISServices:Geotechnics
PreliminaryDesign
BasicDesignoftheboredtunnels,theportals,the
4800mlongeach,boredbya9.25mdiameterslurryshieldTBM
openairsections
Onsiteengineering(geological,geotechnicalandmonitoringfollowupofthetunnels)

HighSpeedLineTunnels

HSLPERPIGNANFIGUERAS
HSLPERPIGNANFIGUERAS(FranceSpain)

Client:EIFFAGE ACS DRAGADOS


ARCADISServices:Geotechnics
PreliminaryDesign Basic&DetailedDesignoftheboredtunnels,the
Keydata:Concession Constructionperiod:2004to20102railwayrunningtunnels,8000mlong
FrenchPortal,theFrenchopenairsection
Onsiteengineering(geological,geotechnicalandstructural
1conventionaltreatmentgallery Crosspassages
French&Spanishportals French&Spanishopenair
followupofthetunnels)
sections

HighSpeedLineTunnels

HSLMEDITERRANEE
HSLMEDITERRANEE(France)

Client:SNCF(FrenchNationalRailwayAuthority)
ARCADISServices:Geotechnics Preliminary&finaldesign,tenderdocumentsofthetunnels
Supervision
Keydata:Constructionperiod:1995to1999
PennesMirabeau tunnel:1530mlong Marseille
ofcivilworks
tunnel:5414mlong

RailwayTunnels

HNVKOVSKI,HNVKOVSKIIANDMAL HUBATUNNELS(CzechRepublic)
HUBATUNNELSARCADISServices:
Client:SZDCs.o.,AdministrationofRailwayTransport
GeotechnicalmonitoringandConstructionManagement
Keydata:Constructionperiod:May2004February2006

RailwayTunnels

TUNNELUNDERMOTORWAYINTERSECTIONFRANKFURT/MAIN(Germany)

TUNNELUNDERMOTORWAYINTERSECTIONFRANKFURT/MAIN
Client:EBA
GermanRailwayControlandCertifyingAuthority
ARCADISServices:GeotechnicalcheckofthedetaileddesignandConstructionManagement
Keydata:Constructionperiod:19961998

RailwayTunnels

DIABOLOTUNNEL(Belgium)
DIABOLOTUNNEL

Client:THV BESIX EiffageTP ABConstructionJV


Keydata:DoubletuberailwaytunnelunderneathBrusselsairport SlurryTBMexcavatedtunnel,eachtube
ARCADISServices:Geotechnicalanalysisandtunnelexcavationdesignduringtender
phase
approx.1,400mlong Crosspassagesbetweenthetubes

RailwayTunnels

LIEFKENSHOEKTUNNEL(Belgium)
LIEFKENSHOEKTUNNEL(Belgium)

Client:THV BESIX EiffageTP ABConstructionJV


Keydata:DoubletuberailwaytunnelcrossingAntwerpharbourbasinsandScheldtriver
ARCADISServices:Geotechnicalanalysisandtunnelexcavationdesignduringtender
phaseSlurryTBM
excavatedtunnel,8.40mdiameter,eachtubeapprox.6,000mlong 12crosspassagesbetweenthetubes

MetrosandTramways

21

MetrosandTramways

Paris Lille Rouen Rennes Toulouse Marseille Lyon(France)

MetrosandTramways

LINEB
LRTofTOULOUSEDISTRICT LINEB(France)

Client:Contractors
ARCADISServices:Detaileddesignof11stations11.6kmofdoubletracks&singletracktunnels,boredby
Detaileddesignofbreakin&breakoutinthestations
Keydata:Constructionperiod:2001(ongoing)
Controlofdetaileddesignfortunnels Consultantforboringmachine&geotechnicalproblems
2earthpressurebalancemachines,1slurryshieldmachine&1compressedairmachine
20stations
Monitoringforstations&tunnels
Ventilation&accessshafts&galleries

MetrosandTramways

LINE1
LRTofRENNESDISTRICT LINE1(France)

Client:RENNESDISTRICT
ARCADISServices:Definition&supervisionofgeotechnicalfieldinvestigations
Geological,hydrogeological
Keydata:Constructionperiod:1997
2001 9.4kmofdoubletracksline boredtunnels:3560mby
&geotechnicalsynthesis Preliminary&BasicDesign
ConstructionManagement
1earthpressurebalancemachine
15stations 1garageworkshop

MetrosandTramways

AMSTERDAMCENTRALSTATION NORTHSOUTHMETRO LINEJUNCTION


ARCADISServices:preliminaryanddetaileddesign
constructionmanagement
(TheNetherlands) Client:ProRail
Keydata:underconstruction AmsterdamCentralstationinfulloperation

MetrosandTramways

SIJTWENDETUNNEL
SIJTWENDETUNNEL(TheNetherlands)
Client:RoyalVolkerWesselsconstruction
ARCADISServices:Preliminaryanddetaileddesign(civil+systems)
company
Keydata:Inoperation(2003) 2.2kmcut&covercombinedroadandtramwaytunnelincludingone
undergroundstation

MetrosandTramways

EASTSIDEACCESS(USA)
NEWYORKCITY EASTSIDEACCESS(USA)
ARCADISServices:ConstructionManagement
(MTA)
Keydata:Constructionperiod:2007 2015

Client:NYCMetropolitanTransitAuthority

MetrosandTramways

VALPARAISO MERVALPROJECT(Chile)
MERVALPROJECT Client:MERVALS.A
Client:MERVALS.A
Keydata:
ARCADISServices:
Constructionperiod:19982005
Completedesign(frompreliminarydesigntodetaileddesign) Architecturaldesign
Tenderdocuments

MetrosandTramways

PRAGUEUNDERGROUND(CzechRepublic)
PRAGUEUNDERGROUND

Client:PublicTransportCompanyofthe
CapitalCityofPrague
ARCADISServices:DetailedEngineeringforsectionsIVC1andIVC2
Keydata:Constructionperiod:2001 2008

MetrosandTramways

CAIROMETRO LINE2(Egypt)
LINE2

Client:CAMPENONBERNARDSGE SPIEBATIGNOLLES
FOUGEROLLE
BOUYGUES SOLETANCHEBACHY ARABCONTRACTORSJV Geological,hydrogeological&
ARCADISServices:Definition&supervisionofgeotechnicalfieldinvestigation
Keydata:Constructionperiod:1993to1997
19stations adoubletrackstunnelboredbyaslurryshield
geotechnicalsynthesis
Definitionofsoilimprovementforbreakin&breakoutofthestations&forspecial
machine
structures(crosspassages,)
Evaluationofbuildingunderpinning

HighwayandRoadTunnels

31

HighwayandRoadTunnels

MARSEILLE NORTHSOUTHCOASTAXIS(France)
NORTHSOUTHCOASTAXIS

Client:CUMPM
KeyData:Constructionperiod:20042010 Demolitionoftheexistingviaduct:19000t Cut&cover
ARCADISServices:DesignandConstructionManagement(EGISRailARCADISMASCARELLIArchitectsJV)
construction(2and3lanes):1100m 30000m2 slurrywalls
includinggeotechnicalaspects

HighwayandRoadTunnels

A86HIGHWAY WESTERNSECTION
WESTERNSECTION(France)

Client:SOCATOP
Keydata:Constructionperiod:1991(ongoing) 1tunnel10.3mfinisheddiameter,10.2kmlong
1tunnel
ARCADISServices:Definition&supervisionofgeotechnicalfieldinvestigations
Geological,hydrogeological
10.5mfinisheddiameter,7.6kmlong
&geotechnicalsynthesis
Assessmentsonimpactsontheundergroundwatertable Technicalassistance
BothtunnelsboredbyTBM Detaileddesign&shopdrawingsofthetunnelinternalstructures
duringdetaileddesignphase

HighwayandRoadTunnels

BAILLETTUNNEL(France)
BAILLETTUNNEL

Client:BPBPLACO(Plastermanufacturer)
Keydata:Constructionperiod:1997to2001
1twolaneroadtunnel:84m2crosssectionexcavatedby
ARCADISServices:Definition&supervisionofgeotechnicalfieldinvestigationsGeological,hydrogeological
NATMmethod,300mlong
1connectingcavernexcavatedbyNATMmethod
a150mlongopentrench
&geotechnicalsynthesis Design
ConstructionManagement
atthemaintunnelportal

HighwayandRoadTunnels
A

A
200m cut and cover East
200m cut and cover West

1818 m mined tunnel

Section A-A

50 meter

TOULON
A50A57
2nd
TUBE(France) Client:BOUYGUESTP SBF COLAS SCREG
TOULONA50A57
2nd
TUBE
Keydata:Constructionperiod:2007to2011
2cutandcoversectionsof200meach(EastandWest)
ARCADISServices:DetailedDesignoftemporarysupports
ExternalcontrolofDetailedDesignoffinal
minedtunnelof1818mincludingsafetyequipments(fireniches,
safetyniches,) 7crosspassagesfor
liningsandcut&coversections
pedestrianaccess 2crosspassagesforrescuevehicleaccess

HighwayandRoadTunnels

ROUTEDESTAMARINS SECTION1(IsleofLaRunion)
SECTION1

Client: DDERunion
KeyData:
Constructionperiod:20042009 ViaductofSaintPaul,750mlong Cut&cover,150mlong
ARCADISServices:Independentcheckerforviaduct,cut&coversectionandboredtunnelssection
CapdelaHoussayeTunnel,300mlong 3otherviaducts

HighwayandRoadTunnels

COENTUNNELPPP
2nd COENTUNNELPPP(TheNetherlands)
Client:CoentunnelCompanyBV
ARCADISServices:overalldesignmanagement
PreliminaryandDetaileddesignofthetunnel highway
(concessionaire)
Keydata:Constructionperiod:2009(ongoing)
includesa1.2kmimmersedtubetunnelandthe
design
Managementoftunnelsafetyaspects monitoringoftheexistingtunnelduringconstruction
refurbishmentoftheexistingCoentunnel
functionaldesigntrafficmanagementsystems interfacemanagementtunnelsystems

HighwayandRoadTunnels

A2LEIDSCHERIJN
A2LEIDSCHERIJN(TheNetherlands)
Client:Besix DuraVermeerjointventure
ARCADISServices:PreliminaryandDetaileddesignoftunnel
servicebuildings interfacemanagement
Keydata:Constructionperiod:2007
2010 1650mcut&covertunnel10lanetunnelpartoftheTrans
tunnelsystems
EuropeanRoadNetwork

HighwayandRoadTunnels

BUSANGEOJEFIXEDLINK(SouthKorea)
BUSANGEOJEFIXEDLINK(SouthKorea)

Client: GKFixedLink
KeyData:
Constructionperiod:20032009Constructionsupervision
ARCADISServices:Independentchecker

HighwayandRoadTunnels

D5MOTORWAY VALIKTUNNEL(CzechRepublic)
VALIKTUNNEL
Directorate
ARCADISServices:Complexgeotechnicalmonitoringoftwotunnels
KeyData: Constructionperiod:March2003 May2006

Client: RoadandMotorway

HighwayandRoadTunnels

MRAZOVKATUNNEL
MRAZOVKATUNNEL(CzechRepublic)

Client: RoadandMotorwayDirectorate
ARCADISServices:Constructionsupervision
KeyData:
Constructionperiod:1998 2002 Monitoring

HighwayandRoadTunnels

D8MOTORWAY PANENSK ANDLIBOUCHEC TUNNEL(CzechRepublic)


TUNNEL
Client:
RoadandMotorwayDirectorate
ARCADISServices:Complexgeotechnicalservices
KeyData: Constructionperiod:March2003 November2006

HighwayandRoadTunnels

LEFORTOVOTUNNEL
MOSCOW LEFORTOVOTUNNEL(Russia)

Client: VINCIConstructionJV
ARCADISServices:GeotechnicalAssistance
KeyData:
Constructionperiod:2000 2001 TechnicalAssistanceforsurfacesettlementsappraisal

ELAZHARROADTUNNELS(Egypt)
ELAZHARROADTUNNELS(Egypt)

SALAH SALEM
VENT. SHAFT

TBM ENTRY SHAFT

EL HUSSEIN VENT. SHAFT

PORT SAID VENT. SHAFT

ATTABA VENT. SHAFT

HighwayandRoadTunnels

Client:CAMPENONBERNARDSGE SPIEBATIGNOLLES
FOUGEROLLE BOUYGUES
ARABCONTRACTORSJV
ARCADISServices:
Definition&supervisionofgeotechnicalfieldinvestigation
Geological,hydrogeological
Keydata:Constructionperiod:1998to2001
twintunnels,1700mlong,8.35mfinisheddiameterbored
&geotechnicalsynthesis
Definitionofthelayout
Auditoftheproject(civilengineering&equipments)
byaslurryshieldmachine 2cut&covers,200m&400mlong

UndergroundSpace

45

UndergroundSpace
The LEP (Large Electron Positron
Collider) tunnel accommodates the
largestparticleacceleratorintheworld

LEP TUNNELFORPARTICLEACCELERATOR(Switzerland)
TUNNELFORPARTICLEACCELERATOR

Client:EUROLEP
Keydata:Constructionperiod:1984to1988
6undergroundcaverns22mdiameter
15underground
ARCADISServices:Analysis&synthesisofgeotechnicaldata
Determinationofgeotechnicalparametersfor
rooms
50kmofgalleries,4.50mto12mdiameter(19.4kmofgalleriesboredby3WIRTHTBM,4.50m
thewholeproject
Detaileddesign&shopdrawingsofallthecivilengineeringstructures(over900
diameter)
drawingsproduced)

UndergroundSpace

CHANNELTUNNEL FRENCHCROSSOVER(France)
FRENCHCROSSOVER

Client:TransMancheLink
Keydata:Constructionperiod:1986to1991
Thecavernis170mlong,19mwideand18mhigh The
ARCADISServices: Determinationoftheminimumchalkpillarthicknessbetweenthe2railwayrunningtunne
thicknessofchalkpillarseparatingthe2railwayrunningtunnelsisjust1.5m
Evaluationoftheauthorizeddeformationcriteriaduringexcavation Phasingdeterminationfortheprimary
galleriesmining 2D&3Dfiniteelementsmodels Geological&geotechnicalfollowupfortheworkduration

UndergroundSpace

GARE DU
NORD
MAGENTA Station
GARE
SAINT-LAZARE
HAUSSMANN St-LAZARE Station

EOLEPROJECT PHASEI(France)
PHASEI

Client:SNCF(FrenchNationalRailwayAuthority)
ARCADISServices:Geotechnics Basic&finaldesignofboredtunnels,conventionallyexcavated
tunnel,connecting
Keydata:Constructionperiod:1990to1995
2undergroundstations53mwide,225mlong
1tunnel12
structures,crosspassages,shafts
Basic&finaldesignofgroundtreatments Elaborationofconstructionmethods& 4
mwide,800mlong
2paralleltunnels,1700mlongeach,boredby7.40mdiameterslurryshieldTBM
phasing
Elaborationoftheinstrumentationprogram
Preparationofthetenderdocuments,includingcontractual
connectingcavernsbetweenmaintunnels&stations
technicalspecifications Geotechnical&technicaladvisortotheClient Controlofdetaileddesign&acceptanceofshop
drawings

UndergroundSpace

3RD UNDERGROUNDELECTRICPOWERSUBSTATION(Monaco)
UNDERGROUNDELECTRICPOWERSUBSTATION

Client:Authority

ofPublicWorks,PrincipalityofMonaco
ARCADISServices:Completedesignandconstructionmanagementservicesforundergroundandsurfacestructures
Keydata:Constructionperiod:2008to2014

UndergroundSpace

ANDINAPROJECT(Chile)
ANDINAPROJECT

Client:CODELCO
Keydata:Constructionperiod:1998to2002
ARCADISServices:Detailedengineering Geomechanicalinteractionofalargecavernwithnearbycavities

Hydraulic&TechnicalGalleries

51

Hydraulic&TechnicalGalleries

ELTENIENTEMINEACCESSTUNNEL
ELTENIENTEMINEACCESSTUNNEL(Chile)

Client:VINCI SoltancheConstructionJV
ARCADISServices:EngineeringservicesfortheConsortiumduringthetenderingprocess(Geotechnics
Keydata:Design&Buildproject
DoubletubecoppermineaccesstunnelintheChileanAndes 9,000m
PreliminaryDesignoftheundergroundstructures)
long,approx.110m
section(eachtube),20crosspassages max.1100mrockcover locallysqueezing
rockconditions

Hydraulic&TechnicalGalleries

COLLECTORMARGENIZQUIERDA(Argentina)
COLLECTORMARGENIZQUIERDA

Client:AGUASARGENTINAS
Keydata:Designperiod:1998to2001
Mainsewer,13kmlong,3.50mfinisheddiameter,boredbyTBM
ARCADISServices:Technical&contractualassistancetotheClientfrompreliminarydesigntotender
Dropshafts
documents Junctionchambers 2connexionswithexistingmajorsewers Pumpingstation Diffuser
tower 1crossingbelowanexistingmajordrinkingwatertunnel

Hydraulic&TechnicalGalleries

PIQUETTES BUCHELAYCOMBINEDSEWERSYSTEM(France)
BUCHELAYCOMBINEDSEWERSYSTEM
ofMantesAgglomeration
ARCADISServices:CompletedesignandConstructionManagement
Keydata:Constructionperiod:2004 2007

Client:Community

Hydraulic&TechnicalGalleries

SS basin

IVRY

AUSTERLITZ

MASSENA

OV2

SST2

PERIPHERIQUE

SST3

SST1

OV1

SST4

OV4

SEINE RIVER

OV3

TIMA STORMSTORAGETUNNELS&OVERFLOWS(France)
STORMSTORAGETUNNELS&OVERFLOWS

Client:SIAAP
Keydata: MassenaAusterlitz tunnel,2300mlong
4.00mfinisheddiameter,boredbypressuredfront
ARCADISServices:PreparationofDetailedDesign
PreparationofTenderDocuments
shieldTBM PeripheriqueMassena tunnel,650mlong,4.00mfinisheddiameter,boredbypressured
frontshieldTBM 3stormoverflowsincluding3dropshafts,30to40mdeep

Hydraulic&TechnicalGalleries

Tunnel was abandoned after


2,400-ft at a cost of $100M.
Proposed Supplemental
Borings (6 vertical 2 inclined)
2

1
Existing Shaft Will Be
Used

Outfall Riser Shafts


Completed in Detroit River
5

7 8

Proposed Shallow Rock Tunnel (SRT)

Tunnel Abandoned at STA 24+46

DETROITRIVEROUTFALLn2 TUNNELRESCUE(USA)
Client: DWSD
TUNNELRESCUE
KeyData: totallength:1890m innerdiameter:7,92m,outerdiameter:8,72m
2accessshafts(diam.3m)and6
ARCADISServices:Expertiseofthefloodreasons
Preliminarydesignofthepotentialrescuealternatives
risershaftsintheDetroitRiver(diam.3m) tunneldepth:ca.85mtoreachpresumablylesspermeablerock
geology:fracturedlimestoneandmarlstone waterpressureofupto6bar highH2Scontentingroundwater

Hydraulic&TechnicalGalleries

DETROIT UPPERROUGETUNNEL(CSO)(USA)
UPPERROUGETUNNEL

Client:DWSD
Keydata: Constructionperiod:20082014 Totallength:11260m Innerdiameter:9.14m
9dropshaft
ARCADISServices:PreliminaryandBasicdesignofthemainTBMentryshaft
Checkingofthedetailed
connectionsalongthealignment
tunneldepth:ca.50to60m
designoftheshaft
geology:heterogeneouslayersoflimestone,shale,marlstone H2SandCH4presentingroundwater

TunnelSafety

58

Tunnelsafety Rail

LYONTURINFERROVIAIREBASETUNNEL
LYONTURINFERROVIAIREBASETUNNEL(FranceItaly)
Client:LTF
ARCADISServices:Analysisoftransport
ofdangerousgoods functionalsafetyanalysis developmentof
Keydata:Underdevelopment
53kmtunnelbetweenLyon(France)andTorino(Italia)
tunnelsafetyrequirements

Tunnelsafety Highway

A2MAASTRICHTTUNNELCORRIDOR
A2MAASTRICHTTUNNELCORRIDOR(TheNetherlands)
Client:Avenue2JV
ARCADISServices:preliminary(civil)design
Functionalsafetyanalysis
Quantitativeriskanalysis
Keydata:Underdesign
2.3kmbileveltunnelinMaastricht
includingrealestatedevelopmentand
Scenarioanalysis
developmentoftunnelsafetyrequirements managementofinterfacewithemergency
smallertunnelsandbridges
services developmentoftunnelsystemspecifications developmentofoperationalprocedures

TunnelSystems

61

Tunnelsystems Rail

PANNERDENSCHKANAALTUNNEL
PANNERDENSCHKANAALTUNNEL(TheNetherlands)
Client:Betuweroute
ARCADISServices:Functionalanalysis preliminarydesign(civil+systems) developmentoftunneland
Managementgroep
tunnelsystemspecifications constructionmanagement
Keydata:twintubeTBMdrivenrailfreighttunnel
2.68km

Tunnelsystems Rail

BESTRAILWAYTUNNEL
BESTRAILWAYTUNNEL(TheNetherlands)
Client:ProRail
ARCADISServices:Preliminaryanddetaileddesign(civil+systems) constructionmanagement
Keydata:cut&coverrailtunnelincludingoneundergroundstation
1.9km

Tunnelsystems Highway

BENELUXTUNNEL
2nd BENELUXTUNNEL(TheNetherlands)
Client:Rijkswaterstaat
ARCADISServices:preliminarydesignanddetaileddesign(civil+systems)
developmentoftunneland
Keydata:immersedtubetunnel 1.0km inoperation(2002)
tunnelsystemspecifications constructionmanagement

Tunnelsystems Highway

ROERTUNNEL (TheNetherlands) Client:Rijkswaterstaat


ARCADISServices:preliminarydesign(civil+systems)
developmentoftunnelandtunnelsystem
Keydata:cut&cover/immersedtubetunnel
2.45km
inoperation(2009)
specifications constructionmanagement

Highways&Roads

A2LeidscheRijn Client:Besix DuraVermeerjointventure


A2LeidscheRijn
ANLServices:PreliminaryandDetaileddesignoftunnel
servicebuildings interfacemanagementtunnel
Keydata:Constructionperiod:2007
2010 1650mcut&covertunnel10lanetunnelpartoftheTrans
systems
EuropeanRoadNetwork