Job ref.
rev
Loading
Drawing ref.
PO Box 5620
Calc by
Date
May-16
Ref.
Calculations
Output
2.2.2.2
2.2.2.3
2.2.2.4
2.2.2.5
H=
Vb=
Sa=
Sd=
Ss=
Sp=
Calculations:
Fig. 3
2.2.2.1
1.7.3.1
1.7.3.2
1.8
Cr=
Vs=Vb*Sa*Sd*Ss*Sp
Hr=
He=
Table 22
Table 22
Table 24
Sc
St
gt
Sh
Sb=Sc*(1+gt*St+Sh)
Ve=Vs*Sb
qe = 0.613*Ve2
3.2.3.2.2
3.2.3.1
Choice of method
0.8
23
34
34
Hybrid
m/s
m
m
Bldg in "country" terrain
(Effective wind speed from Directional Method
& pressure coefficients from Standard Method)
Cp:
Table 13
Cp (overall)
3.1.3.1.3
p=qe*Cp
pmax=
-1.55 kN/m2
1.0 (conservative)
10 degrees
-1.4