Structural Design of Taipei 101 Tower
Structural Design of Taipei 101 Tower
Ching-Chang Chang
Assistant V.P.
Evergreen Consulting Engineering, Inc.
Evergreen Consulting Engineering, Inc.
永峻工程顧問股份有限公司
• Structural Design and Site Supervision for Taipei 101
• Over 30 Years in Practice, Since 1974
• Specialize in Building Structural Consulting Services
Site Plan
Parking North Square Parking
Exit Entry
Grand
Hyatt Shopping Mall Retail
Hotel Center
Office
World Tower City
Trade Park
Center South
Square
Parking Entry Parking Exit
Main Street
PROJECT PROFILE
Clay
Colluvium (1)
380×150ψ 167×200ψ
Colluvium (2)
Sandstone
A
FOUNDATION PLAN
B C D E F G H H.5 J K L M N P Q R S T
1.6
10
11
12
13
14
15
16
17
18
19
TYPICAL FLOOR FRAMING PLAN
Lower Story
16
TYPICAL FLOOR FRAMING PLAN
Upper Story
16
MECHANICAL FLOOR
2X4=8 outriggers,
1 vertical belt truss,
1 horizontal belt truss,
SMRF
18
SCA M.2 M.9 P.1 P.7 SCB
SCA M.2 M.9 P.1 P.7 SCB
SCA M.2 M.9 P.1 P.7 SCB
SC1
SC1
SC1
12.2
12.2
12.9 12.2
12.9
12.9
14.1
14.1
14.7 14.1
14.7
14.7
SC2
SC2
SC2
Elevation
BUILDING MODE SHAPES
• Structural System
• Analysis & Design
Wind Design
Seismic Design
Special Measures
Wind Design
Wind Tunnel Test
TYPHOON
DESIGN CRITERIA
WIND
• ½ YEAR (14 m/s) - HUMAN COMFORT (a<5 cm/s2 )
• 50 YEAR(39.9m/s) - DRIFT RATIO < 5/1000
• 100 YEAR(43.3m/s) - STRESS CHECK(factored load)
Wind Analysis – 1/2-yrs
10
floor acceleration @ Level 89F w/ inherent damping
8 7.4cm/sec2 (w/ typhoon) > 5 cm/sec2
6.2cm/sec2 (w/o typhoon) > 5 cm/sec2
N(%g)
6
TALACCELERATIO
4
TO
0
0.1 1 10
RETURN PERIOD (years)
1.0Wx 400
1.0Wx
5 0 0 .0 1.0Wy 1.0Wy
350
ELEVATION(M)
ELEVATION(M)
300
4 0 0 .0
250
3 0 0 .0 200
150
2 0 0 .0
100
50
1 0 0 .0
0 .0 -5 0
0 .0 5 0 0 0 .0 1 0 0 0 0 .0 1 5 0 0 0 .0 0 1 2 3 4 5
SHEAR (TONS) SHEAR (TONS)
Wind Analysis – 100yrs
DES IGN S HEAR DES IGN MOMENT
1 0 0 y ear r etu r n p er io d lo ad 1 0 0 y ear r etu r n p er io d lo ad
550 550
1.0Wy 1.0Wy
450 1.0Wx 450 1.0Wx
ELEVATION(M)
ELEVATION(M)
350 350
250 250
150 150
50 50
-5 0 -5 0
0 5000 10000 15000 0 .0 E +0 0 1 .0 E +0 6 2 .0 E +0 6 3 .0 E +0 6 4 .0 E +0 6
SHEAR (TONS) MOMENT (T-M)
RESULTS OF WIND ANALYSIS
20
Structural Design OUTLINE
• Structural System
• Analysis & Design
Wind Design
Seismic Design
Special Measures
SEISMIC DESIGN CRITERIA
Motion of Plates
DESIGN INTENSITY:0.13G
• 950 YEAR - RETAIN STABILITY
PGA=0.39G
FACTORED SHEAR COMPARISON
DES IGN S HEAR
1 0 0 y ear r etu r n p er io d lo ad
550
1.3Wy
450 1.0Ey
ELEVATION(M) 350
250
150
50
-5 0
0 5000 10000 15000 20000 25000
SHEAR (TONS)
DRIFT RATIO COMPARISON
DISPLACEMENT
100 year return period load
450
400
350
300
Elevation( M)
250
200
1 .0 W y
150
1 .0 Ey
100
50
- 50
0 2 4 6
DISPLACEMENT(M)
TIME HISTORY ANALYSIS (信義國小震譜)
24
RESULTS OF EQK ANALYSIS
• Under envelope of Code shear and dynamic shear:
max story drift =0.325%<0.5% allowable
• For 100 year return period of earthquake:
stress ratio<1.00 by response spectrum analysis
• For 950 year return period of earthquake:
ductility demand <2.5 by pushover method;
plastic hinge rotatio=0.25%
• For 2500 year return period of earthquake:
plastic hinge rotatio=4%<4% allowable
• If plastic rotation demand>0.5%, cut girder flange
23
Structural Design OUTLINE
• Structural System
• Analysis & Design
Wind Design
Seismic Design
Special Measures
SPECIAL MEASURES TO RESIST
WIND AND SEISMIC FORCES
ElectricPads
Electric Pads
10000 psi HIGH PERFORMANCE CONCRETE
• Design strength : 10000psi @ 90 days
• High flowability: slump - 250±20mm
slump flow - 600±20mm
• 5% maximum air bubble underneath diaphragm plate
• Autogenous shrinkage ≦300×10-6 m/m @ 90 days
COLUMN INFILL MOCKUP TEST
10,000 psi HPC
REVERSE CIRCULATION PILE
STATIC TESTING OF PILES
COMPRESSION:
消音設備
Silencer
2000 TONNES MAX.
碎石級配
Gravel
反力配重鋼板
Reaction Mass
燃燒氣室
Combustion Chamber
活塞
Piston
荷重計
Load Cell
Laser Laser
雷射光
Beam Generator
雷射發光器
承載鋼鈑
承載鋼鈑
Bearing Plate
雷射感應器
Laser
Sensor Pile
Transducer 載重試驗樁
SLURRY WALL
REDUCED BEAM SECTION
10
8
N(%g)
6
TALACCELERATIO
0
0.1 1 10
RETURN PERIOD (years)
TMD
BUILDING TMD
Building Wind Damper Animation
TMD CONSTRUCTION
尖塔TMD
尖塔VIO載重
THANK YOU