BIOMASS

GASIFICATION BASED
POWER PLANT
Bamboo Cultivation
 Land requirement – 450 acres,
 Variety of Bamboo – Valgaris green,
 Duration of the crop- 18 months,
 Yield / acre - 60 Tons,
 Total yield from 400 acres – 27,000 Tons,

NOTE:
First harvesting from planting will be after 3 years,
Lateral will be every 1.5 years upto 58 years,
Planting cost and cultivation cost will be
approximately Rs.1.25 lakhs per Acre only for First
Year.
PLANT OPERATION - MAN POWER DETAILS
Sl. no Position No. of Persons
01 Plant Manager 01
02 Administrative Officer 02
03 Shift Supervisor 04
04 Gasifier Operator 07
05 Helper –Gasifier operator 07
06 Engine Operator 07
07 Electrician 07
08 Helper – Biomass preparation 07
09 Casuals- Biomass Handling 25
10 Chemist – Water Treatment 04
11 Instrument Supervisor 04
12 Fitter 04
13 Welder 04
14 Fitter Helper 02

Total Man Power Required 85


MAN POWER REQUIREMENT & QUALIFICATION
Sl. Position Required Required
No Qualification Experience

01 Plant Manager BE / Diploma in EEE / 5-7 years.


Mech.

02 Administrative Manager UG/PG in Commerce 3-5 years


03 Administrative Assistant Any Degree ----
04 Shift Supervisor Diploma in EEE- Mech 2-3 years.
05 Gasifier Operator Degree / Diploma/ ITI 2 -3 years.
06 Helper- Gasifier Optr. HSC / ITI ----
07 Electrician ITI(Electical) 1-2 years
08 Instrumentation Diploma in 2-3 years
Supervisor Instrumentation

09 Chemist- Water treatment B.Sc in Chemistry ----


10 Fitter ITI 2-3 years
11 Welder ITI 1-2 years
Role of Subsidy
 Subsidy will be sanction by MNRE through TEDA for promoting

and supporting the Renewable Energy in India.

 Biomass energy conversion reduces the carbon emission and biomass

consumption for power.

 This power project covers under Clean Development Mechanism.

(CDM)
ENERGY PURCHASE
AGREEMENT

 The Energy Purchase Agreement will be


signed with Tamil Nadu Electricity Board as
per their norms for biomass power projects.

 The EPA will be signed for a period of 20


years.
INFRASTRUCTURAL
FACILITIES
 BUILDINGS:
Gasifier Plant Shed

Biomass Storage Shed

Acoustic enclosures for the engines &


Transformer will be constructed

Office space for operations in the


plant will also be provided.
SPECIFICATIONS OF GASIFIER
Harness the Nature
and
Save the Future…

THANK YOU…..