Professional Documents
Culture Documents
GENERAL INTRODUCTION
BIOMASS GASIFIER
1. Design, Fabrication, Erection, Testing & Commissioning of Biomass Gasifier
based Power Plant from 10 kWe to 1000 kWe.
2. Design, Fabrication, Erection, Testing & Commissioning of Biomass Gasifier
for any rating in Thermal application upto 4000 kWth.
3. Redesigning and Conversion of Diesel Engines to 100% Producer / Bio Gas
Engines from 10 kWe to 1000 kWe.
4. Turnkey Project Execution of Biomass Gasifier Projects.
V. Mines:
NLC – Mines – I - Neyveli
NLC – Mines – II - Neyveli
Kuderamukh Iron Ore Company Limited - Kudreamukh
Kuderamukh Iron Ore Company Limited - Mangalore
NMDC – Donimalai Iron Ore Mines - Donimalai
NMDC – Bailadila Iron Ore Porject - Bailadila
VI. Fertilizer:
EID Parry (India) Limited - Ennore
NLC - Fertilizer Factory - Neyveli
SPIC Limited - Tuticorine