You are on page 1of 8

QC CHAR

MATE
Bill Of Quantities
ITEM Frequency Length Width
meter meter
1. Excavation:
Excavation for end drain 1 119 1.4
Excavation for foundation of Main Drain 1 761.00 0.90
Excavation for foundation of S. drain 1 1065 0.6

Sub Total
2. PCC Work:
Concrete(1:2:4) for End drain wall 2 119.00 0.40
Concrete(1:2:4) for End drain Floor 1 1 119.00 1.4
Concrete(1:3:6) for End drain Floor 2 1 119.00 0.6

Concrete(1:2:4) for Main drain wall 2 761.00 0.20


Concrete(1:2:4) for Main drain Floor 1 1 761.00 0.90
Concrete(1:3:6) for Main drain Floor 2 1 761.00 0.5

Concrete(1:2:4) for S. drain wall 2 1065 0.15


Concrete(1:2:4) for S. drain Floor 1 1 1065 0.6
Concrete(1:3:6) for S. drain Floor 2 1 1065 0.6

Sub Total
3. Plastering (1.90 cm thick):
Inner walls for End drain 1 119.00 1.92
Inner walls for main drain 1 761.00 1.92
Inner walls for Small drain 1 1065.00 1.92
Sub Total
Total
Total Item

Market Rates
Sub Total
Total Amount
QC CHARITY IN PAKISTAN
MATERIAL QUANTITY ESTIMATES (Drain)
Proportion Quantity
Depth Volume Cement Sand Gravel Cement
meter Cu.M Bags

0.8 133.3
0.74 506.8
0.44 281.160

921.3

0.7 66.64 1 2 4 414.0


0.1 16.66 1 2 4 103.5
0.04 2.86 1 3 6 12.4

0.64 194.82 1 2 4 1210.4


0.1 68.49 1 2 4 425.5
0.04 15.22 1 3 6 66.2

0.34 108.63 1 2 4 674.9


0.1 63.90 1 2 4 397.0
0.04 25.56 1 3 6 111.2

562.77

0.025 5.71 1 6 12.25


0.025 36.53 1 6 78.34
0.025 51.12 1 6 109.63
93.36
l 3615
Check1 Check2 Bags
100 50 3615
200 400 300
20000 20000 1084583.8
mount
ES (Drain)
Quantity ManPower
Sand Gravel Skilled Unskilled
Cu.M Cu.M Mandays Mandays

67.3 672.5

29.32 58.64
7.33 14.66
1.32 2.64

85.72 171.44
30.14 60.27
7.03 14.06

47.80 95.59
28.12 56.23
11.81 23.62

140.9 281.7

4.02
25.68
35.94
46.7 46.7
314 497 255 1001
Sand Crush Skilled Labour
4883.102 15453 255 1001
10 12 500 300
48831.02 185430 127402 300285
1,786,532
adnan:
Un Skilld
Ordinery
Soil=3.2Cum
Hard Soil=2.5 Cum
Soft Rock=1.6 Cum
Hard Rock=1Cum
Skiild
Note Dry Stone= 1.83
Cum
Stone Masonry=1
Cum
Reinforcment
Concrete=2 Cum
PCC= 5.5 Cum
Plastring=0.5 Sq.m
Suttring=8.4Sqm
Pipe all szie
Fitting=0.5 Rft
HDPE all szie
Fitting=.2 Rft

Width: up = 30 cm/floor 40 cm

Width: up = 15 cm/ floor 20 cm

Width: up 10 cm/floor 15 cm
check2: 60 cm dia
check1: 35 cm dia