TYPICAL CYCLE TIME (18.

5 Hrs) DISTRIBUTION OF A2

DELAYS DRILLING FOR BLAST 16.07% ROCK BOLTS (DRILLING AND INSTALLATION) 21.42%

8.93% 4.02%

4.91% 4.02%

11.61% SHOTCRETING ( INITIAL AND FINAL) 3.57% 4.02% 21.42% MUCKING

Prepared By: Hassan Nawaz and Shakeel Checked BY: Munir Baig (RE-Underground Works)