Professional Documents
Culture Documents
Cycle Time For A2
Cycle Time For A2
5 Hrs) DISTRIBUTION OF A2
DELAYS DRILLING FOR BLAST 16.07% ROCK BOLTS (DRILLING AND INSTALLATION) 21.42%
8.93% 4.02%
4.91% 4.02%
Prepared By: Hassan Nawaz and Shakeel Checked BY: Munir Baig (RE-Underground Works)