Average Review Times 1/1/11 6/30/11


15 Preliminary Plans: 719 days 27 Site Plans: 612 days
Application: 32 days (10) DRC: 39 days (45) Hearing: 468 [302 stop] (60) Hearing: 122 [36 stop] (45) Resolution: 54 (14) Certification: 126 [stop not tracked] Certification: 217 [stop not tracked]

Application: 7 days (10)

DRC: 43 days (45)

Resolution: 45 (14)

Stops Waiting on Applicant Re-submittal Waiting on Agency Recommendation Certification Delays generally by Applicant Goal is two week maximum for plan comments Record Plats Long pending times Tax rate changes

Balanced Regulatory System


Uses

Standards & Requirements

Process

Submittal Requirements

Timeline: Targets
Module
IV. 59-1. General Provisions IV. Zoning Districts I. & II. Use & Use Standards Ag & Res (I.) Zap Draft under Revision Ag & Res (I.) Zap Draft under Revision

June 2011

September 2011

November 2011

January 2012
Zap Draft

March 2012

May 2012

September 2012

Zap Draft

I. & II. Zoning Standards

Revised & Consolidated for All Zones

Consolidated Staff Draft

Revised Public Draft

Planning Board Draft

IV. General Development Regulations III. Administration IV. Definitions Zap Draft

Zap Draft

Zap Draft

Uses: Flexibility with Protections

Limited: Allowed With Additional NonDiscretionary Standards & Requirements

Permitted: Allowed Under Basic Standards & Requirements

Conditional: Allowed With Additional Standards, Requirements, & Discretionary Review

Standards & Requirements: Certainty & Comprehensiveness


Codes
Context Sensitive Roads ESD Stormwater Master Plans & Design Guidelines Forest Conservation Subdivision Staging Policy Etc

Standards
Height Density Setbacks Placement Open Space Etc

Requirements
Landscaping Lighting Parking & Loading Recreation Etc

Process: Review Bodies & Application Types


District Council

Administrative Approvals Layout Plans Temporary Use Permits Building Permits Use & Occupancy Certificates Sign Permits Hearing Approvals Sectional Map Amendments Local Map Amendments (Rezoning Plans) Corrective Map Amendments Sketch Plans Minor & Major Site Plans Minor & Major Conditional Use Permits Variances

Planning Board

Planning Department

Board of Appeals

Hearing Examiner

Department of Permitting Services

Sign Review Board

Process: Administrative Approvals


ACTION District Council Sign Review Board Hearing Examiner Planning Director Planning Board Board of Appeals DPS Director

APPROVAL PROCESS ADMINISTRATIVE APPROVALS Layout Plan Temporary Use Permit Building Permit Use and Occupancy Certificate Sign Permit Written Interpretation

D D D D D D R

R PH = Public Hearing CA = Consent Agenda PM = Public Meeting

KEY: R = Review & Recommendation D = Decision A = Appeal

Circuit Court

Process: Hearing Approvals


ACTION Sign Review Board Hearing Examiner Planning Director Planning Board Board of Appeals DPS Director District Council

APPROVAL PROCESS HEARING APPROVALS Sectional Map Amendment Local Map Amendment (Development Plan) Corrective Map Amendment Zoning Text Amendment Sketch Plan Site Plan, Minor Site Plan, Major Conditional Use Permit, Minor Conditional Use Permit, Major Variance

R R R R R R R R R R

R/PM R/PM R/PM R/PM D/PH D/CA D/PH D/PH R/PH A D/PM D/PH R/PH

D/PH D/PM D/PH D/PH

KEY: R = Review & Recommendation D = Decision A = Appeal

PH = Public Hearing CA = Consent Agenda PM = Public Meeting

Circuit Court A A A A A A A A A A

Process: Noticing
Noticing Requirements (print - p, mail - m, web - w, sign - s) Type of Hearing Approval Pre-Submittal Meeting n/a Application Hearing Resolution

Sectional Map Amendment

n/a

p, w

Local or Corrective Map Amendment Sketch Plan

s, m

s, m, w

m, w

m, w

s, m s, m
s, m n/a n/a

s, m, w s, m, w
s, m, w s, m, w s, m, w

m, w m, w
m, w n/a m, w

m, w m, w
m, w w w

Major Site Plan or Conditional Use Permit Minor Site Plan or Conditional Use Permit Layout Plan
Variance

Applications by Criteria Thresholds I


Criteria Method Threshold Rural Standard Application Required by Threshold Criteria Zone RE/RLD RMD RHD CR See Thresholds Below (Use, Density, Etc) I PD

Optional

Sketch Plan followed by Site Plan(s), Major

Development Plan

Replat

Subdivision or Resubdivision Permitted Limited Building Permit Building Permit Layout Plan Layout Plan Building Permit Layout Plan

Preliminary Plan

Use

Layout Plan Site Plan, Minor

Layout Plan Site Plan, Minor

Layout Plan Site Plan, Minor

Development Plan

Density

Conditional (minor) Conditional (Major) <10,000sf or 10 Building Permit Building units Permit 10,000sf Layout Plan Layout Plan 30,000sf or 10 30 units >30,000sf or 30 Site Plan, Minor Site Plan, units Minor

Conditional Use Permit, Minor Conditional Use Permit, Major Building Permit Layout Plan Layout Plan Site Plan, Minor Site Plan, Major Layout Plan Site Plan, Minor Site Plan, Major Layout Plan Site Plan, Minor Development Plan

Site Plan, Minor

Site Plan, Major

Applications by Criteria Thresholds


Criteria Height Threshold Rural <40f 40f+ Building Permit RE/RLD Building Permit RMD Building Permit RHD Layout Plan Site Plan, Minor Zone CR Layout Plan Site Plan, Minor I Layout Plan PD Development Site Plan, Minor Plan

Adjacent Zone

Rural, RE, RLD, RMD RHD, PD CR, I, PD

Building Permit

Building Permit

Building Permit

Site Plan, Minor Layout Plan Layout Plan

Site Plan, Major Site Plan, Minor Layout Plan

Site Plan, Major Development Plan Site Plan, Minor Layout Plan

Because multiple criteria are included with any application, the most intense application type based on all the applicable thresholds must be filed according to the following order: building permit, layout plan, minor site plan, major site plan, minor conditional use permit, major conditional use permit, sketch plan, development plan. Example, a standard method development in the RHD zone requesting permitted uses, 24 units, 50' height, adjacent to RHD- and CR-zoned land must file a minor site plan application because it is the most intense application type (required by the # of units and height).

Sketch Plan Plat Existing Site Conditions and Vicinity Survey Approved NRI/FSD (or exemption)

Layout Plan

Major Site Plan

Minor Site Plan

Building Permit

Application Type

Development Plan

Major Cond. Use Permit

Minor Cond. Use Permit

Submittal Requirements

Approved SWM Concept (or exemption)

Narrative Description Justification Statement Conceptual Building Massing & Height Plan Conceptual Circulation & Parking Plan Conceptual Open Space & Amenities Plan Phasing Concept Submittal Requirements

Detailed Building, Circulation, & Parking Layout


Detailed Open Space & Landscape Plan

Development Program