BP / Deepwater Horizon RheliantDisplacement Procedure "Macondo"OCS-G32306

qn! lole. we will displace sBMfrom allfour mudpumps, both standpipes,-choke, kill, boost lines, casing and riser. J. Pumpexcess volumeto Bankston, haveboaton starboard and with mud hoseon her. 4 . Line up on seachest. 5 . Build 450 bbl WBM spacerin pit # 5, anduseDuo Vis to thicken up. 6. Capacities: Choke 100bbls/794 strokes; Kill 100 bbls/794strokes; Boost 73 bbls/579strokes: Drill pipe 170bbls/1349 strokes; Casing/Riser w/drill pipe 2334bbls/l8,523 stks PumpOutput0.126bblsistk. Displacement 1. Line up for all SBM returns go to the pits andbypass to sandtraps. Functiontest dumpvalve. 2. Displacechoke,kill, andboostlines,andcloselower valvesaftereach. uOffit# Qr{ote: whendisplacing chokeline, over displace bbls (63 strokes) or 8 f

1 . Before displacingto seawater, conducta THINK DRILL with all. 2. Rememberit's very important that we mustovoid trapping SBM in pits, pumps, lines

trbffii:idisnlatbu:i*uume.:,m:t:.tble.iirndi:,u*ifl:istri*$i:as$ilii#blgit$ig?$:iisiiorc*

surface lines.

J.

4. 5. 6.

7.

Pump450 bbl WBM spacerfrom pit # 5 down drill pipe. Continue displacement casing up until spacer 500ft pastBOP stack(992bbls 7873 is strokes). After the mud haspastthe stack,we canboostriser. Do not shutdownuntil displacement complete. is WhenWBM spacer returns, over-displace until interface incorporated. is When interface incorporated, sample StaticSheen andROC andshutdown is take for test pumps. Switchto overboard discharge. If staticsheen an apparent is pass, discharge remaining spacer seawater and down overboard line._MudEngineer will advise.

NorE: Goodcommunication be necessary accomplish successful will to a displacement. you arenot sure,stopandask. If