This document provides a rate analysis for various construction materials and components. It includes densities and costs for materials like sand, cement, bricks, and labor. Concrete requirements are calculated for a desired 1 cubic meter volume. Masonry requirements are estimated for a 3x3 meter wall of 115mm thickness. Plaster needs are determined for a 12.5mm thick coating on the 3x3 meter wall surface. Total costs are calculated for concrete, masonry, and plaster work.
This document provides a rate analysis for various construction materials and components. It includes densities and costs for materials like sand, cement, bricks, and labor. Concrete requirements are calculated for a desired 1 cubic meter volume. Masonry requirements are estimated for a 3x3 meter wall of 115mm thickness. Plaster needs are determined for a 12.5mm thick coating on the 3x3 meter wall surface. Total costs are calculated for concrete, masonry, and plaster work.
This document provides a rate analysis for various construction materials and components. It includes densities and costs for materials like sand, cement, bricks, and labor. Concrete requirements are calculated for a desired 1 cubic meter volume. Masonry requirements are estimated for a 3x3 meter wall of 115mm thickness. Plaster needs are determined for a 12.5mm thick coating on the 3x3 meter wall surface. Total costs are calculated for concrete, masonry, and plaster work.
Rate AnaIysis of Various Construction Component MateriaIs
Density of Sand 1 = 1466.00 Kg/m
Density of Kapachi 2 = 1401.00 Kg/m Densiry of Cement = 1440.00 Kg/M3 Prize of Cement in Bag Pc = 265.00 Per Bag Prize of Reti in Volume Pr = 350.00 Per Brass Prize of Kapachi in Volume Pk = 750.00 Per Brass Desired Concrete Volume Vol = 1.00 m Brick Size Length L = 225.00 mm Brick Size Breadth B = 100.00 mm Brick Size Height H = 75.00 mm Prize of Brick Pbr = 5.00 No Plaster Labour per 100 Sq Ft plc = 650.00 Rs per Brass Brick Masonary Labour bml = 6.50 Rs per SqFt 1 Rate AnaIysis of Concrete Quantity 1 Cubic Meter VoIumatric Ratio Cu = 1.00 VoIumatric Ratio Ru = 1.50 VoIumatric Ratio Ku = 3.00 TotaI VoIume Vu = Cu + Ru + Ku = 5.50 SoIid 1 CuMt has Dry Concrete Mix in M20 is 1.52 CuMt Cement Contains Cu = ( ) Cu * 1.52 VoI ( ) Vu = 0.28 m Reti Contains Ru = Ru * 1.52 Vol Vu = 0.41 m Kapachi Contains Ku = Ku * 1.52 Vol ( ) Vu = 3.00 * 1.52 1.00 ( ) 5.50 = 0.83 m Densiry of Cement = 1440.00 Kg/M3 Each Cement Bag Wt = 50.00 Kg Cement Volume Bg = Cu * / / / /Wt = 8.06 Bags Reti Volume = Ru = 0.41 m Reti by Weight = Ru * 1 = 601.06 Kg Kapachi Volume = Ku = 0.83 m Kapachi by Weight = Ku * 2 = 1162.83 Kg Desired Concrete VoIume Prize CaIcuIation Cement Consumed R1 = Bg * Pc = 2135.90 Rs Reti Consumed R2 = * ( ) * Ru 3.281 3 100 Pr = 50.68 Rs Kapachi Consumed R3 = * ( ) * Ku 3.281 3 100 Pk = 219.87 Rs Total Concrete Expenditure = R1 + R2 + R3 = 2406.45 Rs
Adding Labour Charge 10% of above = + ( ) * ( ) + R1 + R2 R3 10 100 ( ) + R1 + R2 R3 = 2647.09 Rs ////////////////////////////////////////////////////////////CONCRETE COMPLETE/////////////////////////////// 2 Rate AnaIysis of Masonary Quantity Bt mm thick and BI Mt by Bb Mt Height and Width Length of Masonary Work BI = 3.00 m Breadth of Masonary Work Bb = 3.00 m Thickness of Msonary Work Bt = 115.00 mm TotaI Masonary VoIume Mbu = * ( ) Bt 1000 * BI Bb = 1.03 m One Brick Volume Bvol = * L * B H * 1000 * 1000 1000 = 0.001688 m Mortar 1% of Total Masonary Volume Bmtr = * Mbu 23 100 = 0.236900 m No of Bricks Bno = Mbu Bvol = 610.19 No Considering Mix
Cement Portion cp = 1 and Reti Portion rp = 6 Total tl = cp + rp = 7.0 Cement Volume Mbg = 1 tl = 0.1429 Cement Bags Bcbg = * ( ) ( ) Bmtr
Wt tl = 0.97 Bags Reti Br = Bmtr * 6/7 = 0.20 m Cement Consumed CC = Bcbg * Pc = 257.05 Rs Per Bag Reti Consumed RC = Br * Pr = 70.00 Rs Bricks Consumed BC = Bno * Pbr = 3050.95 Rs Brick Masonary Labour Charge BLC = * bml * ( ) 3.282 2 * Mbu 1000 Bt = 627.09 Rs Total Cost Tc = BLC+BC + Bcbg*Pc + Br* Pr = 4005.09 Rs Total Cost Tc = Tc Mbu 3.281^3 = 110.09 Rs Per CuFt ///////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////// 3 Rate AnaIysis of PIaster PIaster Thickness Pth = 12.50 mm Plaster Length Pl = 3.00 m Plaster Height Ph = 3.00 m Plaster Quatity Pqt = * Pl * Ph Pth 1000 = 0.11 m n Plaster Cement Contain Pcement = 1.00 n Plaster Reti Contain Preti = 4.00 Total Mortar Pmortar = Pcement + Preti = 5.00 Cement Bags Pbags = (Pqt *Pcement / Pmortar) * / / / /Wt = 0.63 Bags Reti Pqty = * Pqt Preti Pmortar = 0.09 m
Say in CuFt = Pqty * 3.282^3 = 3.18 CuFt By Weight = Pqty * 1 1 1 1 = 131.94 kg Prize CaIcuIation Cement Consumed PCC = Pbags * Pc = 166.95 Rs Reti Consumed PRC = Pqty * Pr = 31.50 Rs Labour Charge PLC = * ( ) * Pl Ph * plc 3.282 2 100 = 630.13 Rs Total Plaster Cost = PCC + PRC + PLC = 828.58 Rs Total Cost Per SqFt = + PCC + PRC PLC * Pl * Ph 3.281 2 = 8.55 Rs Per SqFt