You are on page 1of 1

ISO

1 : TEST PLATES & PIPE


TRADE
TASK
WELDING
PAGE 1 of 1 SCALE
E
DRAWN
DATE
N.T.S.
Fizan
CHECKED
DESIGNED
7 MAY,2012
1. Dawot Hussin 2. Charles Gobi
3. Aziz Dawam 4. Hafizan
21st Malaysian Skill
Competition
Committee
NUMBER
REFERENCE
TD1
B
A
C
K
SID
E
X
X
X
X
10
TEST D
MATERIAL : CARBON STEEL PLATE ( 12MM ) t
WELDING POSITION :
WELDING PROCESS :
NOTES :
1. DEPOSIT A FILLET WELD ON THE FRONT SIDE OF THE JOINT WITH 10mm
O/2 mm LEG LENGTH
2. WELD DEPOSITED WITH A MINIMUM OF 2 RUNS AND MAXIMUM 3 RUNS.
3. EDGE PREPARATON MUST REMAN AT 90 TO THE PLATE FACE.
4. NO GAP ALLOWED
EVALUATION:
1. VISUAL INSPECTION
2. BREAK TEST