PART 1 GENERAL
1.3 REFERENCES
1.5 SUBMITTALS
1.6 ACCEPTANCE
B. Engineer reserves the right to select and test material randomly from any
location at the construction site.
2.1 MATERIALS
2.2 BORROW
2.5 EMBANKMENT
A. Granular Borrow
Table 1
Free Draining Granular Backfill Gradation
Sieve Size Percent Passing
1½ inch 100
1 inch 95 to 100
½ inch 25 to 60
No. 4 0 to 10
No. 200 0 to 5
Embankment, Borrow, and Backfill
02056 – Page 3 of 7
January 1, 2012
2.8 FLOWABLE FILL
PART 3 EXECUTION
3.1 PREPARATION
B. Scarify and compact the top 8 inches of the surface to at least 90 percent
of maximum laboratory density when the embankment height is 6 ft or
less.
C. Break and scarify all underlying road surfaces so that pieces do not
exceed 3 ft2 before placing embankment over an existing pavement that is
outside the limits of removal or excavation shown on the plans.
E. Place an initial layer to act as a working platform over soft, wet ground
when approved by the Engineer.
1. Density specifications do not apply to the working platform.
2. Meet density requirements for embankment placed above the
working platform.
J. Do not place large rock within 1 ft of the subgrade surface. Do not allow
rocks to protrude above the subgrade surface.
END OF SECTION